Learn how to be notified of changes to this page.
You can find free electronic copies of plans and specs at Idaho Plan Room.
Idaho's Governor has issued an Executive Order 2006-40 that requires contracts for services performed in the State of Idaho are with businesses that employ individuals who are eligible under Federal and State law to work in the United States. The Division of Public Works is developing procedures to assure that this requirement is met.
| Submission Date |
Project Number |
Project Name |
| 07-09-09 | 09206 | Replace Retractable Platform Seating, Taco Bell Arena, Boise State University, Boise, Idaho *NOTE: REVISED BID DATE and TIME* |
| 07-21-09 | 09332 | Remodel Readiness Center, Caldwell, Division of Military, Caldwell, Idaho |
No RFQs are available at this time.
| Submission Date |
Project Number |
Project Name |
| 04-29-09 | 09205 | South End Bleacher Expansion, Bronco Stadium, Boise State University, Boise, Idaho Addenda |
| 07-07-09 | 08321 | Automated Storage & Retrieval System, Idaho State Liquor Dispensary, Boise, Idaho *NOTE SUBMITTAL DATE CHANGE* Specifications Addenda |
| 07-16-09 | 10170 | Renovate Seiter Hall, North Idaho College, Coeur d'Alene, Idaho |
Archived Bid Results: 2009, 2008, 2007, 2006, 2005, 2004, and 2003
| Submission Date |
Project Number |
Project Name |
Contractor |
Base Bid |
Alternates |
Awarded |
| 07-01-09 | 07062 | Additional Fence and Sallyport, SICI, Department of Correction, Boise, Idaho | Anderson & Wood Construction | $1,481,600 | 1. $44,175 2. $24,581 |
|
| Ewing Company | $1,164,800 | 1. $26,068 2. $16,613 |
||||
| Scott Hedrick Construction | $1,127,000 | 1. $15,000 2. $32,000 |
||||
| KEPHA Construction | $1,124,000 | 1. $14,182 2. $30,907 |
||||
| Stock Construction Management | $1,143,000 | 1. $24,150 2. $22,488 |
||||
| Guho Corporation | $1,227,000 | 1. $13,900 2. $38,485 |
||||
| Engineered Structures, Inc. | $1,098,800 | 1. $17,350 2. $20,800 |
||||
| Ovard Construction | $1,328,290 | 1. $19,290 2. $23,140 |
||||
| Wright Brothers | $1,052,010 | 1. $13,466 2. $28,345 |
||||
| Sletten Construction | $1,224,000 | 1. $15,500 2. $29,500 |
||||
| 06-23-09 | 08336 | Renovate Hailey RC, Division of Military, Boise, Idaho | Perkins Construction | $643,000 | ||
| DeWall Construction | $672,500 | |||||
| Hayes Construction Company | $632,287 | |||||
| Valley Design & Construction | $728,000 | |||||
| Kepha Construction | $657,700 | |||||
| EKC | $652,000 | |||||
| CSDI | $629,800 | |||||
| K-J Corporation | $712,000 | |||||
| Wright Brothers Construction | $668,594 | |||||
| Stock Construction Management Services | $603,000 | |||||
| Steed Construction | $615,800 | |||||
| Ovard Construction | $621,450 | |||||
| Beniton Construction | $719,837 | |||||
| SE/Z Construction | $624,324 | |||||
| Century Contractors | $726,272 | |||||
| 06-18-09 | 09150 | 4th Street Parking, Phase 2, Lewis & Clark State College, Lewiston, Idaho | *BIDS UNDER REVIEW* | |||
| 06-18-09 | 09400 | Upgrade Elevators, SHS, Department of Health & Welfare, Blackfoot, Idaho | DeWall Construction | $219,000 | 1. $42,800 2. $98,500 3. $4,600 |
|
| Harris, Inc. | $233,000 | 1. $47,000 2. $104,000 3. $4,800 |
||||
| J&S Construction | $260,800 | 1. $45,000 2. $96,000 3. $5,400 |
||||
| Ovard Construction | $270,694 | 1. $46,220 2. $95,440 3. $5,110 |
||||
| Rivers West Construction | $264,000 | 1. $51,500 2. $113,600 3. $5,500 |
||||
| Vern Clark & Sons Construction | $243,000 | 1. $45,000 2. $93,000 3. $3,700 |
||||
| 06-17-09 | 09220 | Renovate Measurement and Control, Engineering Research Center, Phase 2, Idaho State University, Pocatello, Idaho | Barry Hayes Construction | $394,630 | 1. $15,339 2. $19,457 3. $18,000 |
|
| Century Contractors | $454,542 | 1. $19,681 2. $23,507 3. $16,774 |
||||
| DeWall Construction | $428,900 | 1. $18,100 2. $21,600 3. $18,300 |
||||
| Harper Construction | $484,900 | 1. $20,800 2. $18,300 3. $18,770 |
||||
| Harris, Inc. | $444,500 | 1. $17,500 2. $23,000 3. $16,000 |
||||
| Ovard Construction | $461,650 | 1. $19,720 2. $27,120 3. $15,890 |
||||
| SE/Z Construction | $448,432 | 1. $15,334 2. $23,904 3. $13,895 |
||||
| Valley Design & Construction | $848,000 | 1. $19,000 2. $41,400 3. $18,700 |
||||
| Vern Clark & Sons Construction | $447,000 | 1. $9,400 2. $24,000 3. $16,000 |
||||
| 06-11-09 | 08263 | HVAC Improvements, Swim Center, University of Idaho, Moscow, Idaho | Hobson Fabricating, Inc | $490,963 | 1. $11,200 2. $34,200 3. $19,866 |
|
| 3-H Mechanical | $483,590 | 1. $10,080 2. $30,218 3. $17,768 |
||||
| RM Mechanical | $476,813 | 1. $11,114 2. $33,152 3. $21,515 |
||||
| 05-11-09 | 08271 | New Elevator, Alumni Residence Center, University of Idaho, Moscow, Idaho | ||||
| Wright Brothers Construction | $442,989 | 1. $94,831 2. $2,500 |
||||
| Golis Construction | $478,500 | 1. $112,000 2. $3,500 |
||||
| Wimer Corporation | $428,094 | 1. $70,544 2. $3,450 |
||||
| RRACO Inc | $449,000 | 1. $106,000 2. $3,000 |
||||
| Brown Contracting | $517,000 | 1. $128,000 2. $3,300 |
||||
| Citadel Construction | $474,950 | 1. $105,375 2. $3,200 |
||||
| Kenaston Corporation | $528,000 | 1. $130,000 2. $3,600 |
||||
| 06-09-09 | 08406 | Emergency Preparedness Isolation Room, SHS, Department of Health & Welfare, Blackfoot, Idaho | Barry Hayes Construction | $124,790 | ||
| Century Contractors | $136,633 | |||||
| DeWall Construction | $114,000 | |||||
| Harper Construction | $159,600 | |||||
| Harris, Inc. | $119,500 | |||||
| J & S Construction | $151,950 | |||||
| Rivers West Construction | $118,570 | |||||
| SE/Z Construction | $129,929 | |||||
| Vern Clark & Sons Construction | $129,500 | |||||
| 06-04-09 | 09223 | Exterior Emergency Notification, System, Campus Wide, Idaho State University, Pocatello, Idaho | Rivers West | $108,000 | 1. $24,000 | |
| Bear River Electric | $104,520 | 1. $22,965 | 06-11-09 | |||
| Portneuf Electric | $112,470 | 1. $19,170 | ||||
| DeWall Construction | $108,900 | 1. $26,200 | ||||
| Wheeler Electric | $140,100 | 1. $21,300 | ||||
| Anderson & Wood Construction | $108,160 | 1. $24,700 | ||||
| 06-03-09 | 10190 | Steam & Condensate Line Replacement, Boise State University, Boise, Idaho | Buss Mechanical Services | $205,800 | 1. $89,200 2. $24,000 |
|
| Cloverdale Plumbing Co. | $240,000 | 1. $102,800 2. $28,280 |
||||
| DeBest Plumbing & Mechanical | $226,638 | 1. $96,970 2. $30,889 |
||||
| Lacy Mechanical | $234,000 | 1. $96,000 2. $25,900 |
||||
| RM Mechanical | $160,187 | 1. $70,693 2. $53,132 |
||||
| Ridgeway Industrial | $278,000 | 1. $99,500 2. $31,000 |
||||
| Paige Mechanical Group | $268,000 | 1. $92,000 2. $39,100 |
||||
| 06-01-09 | 08213 | Lab/Classroom Remodel, Engineering-Technology Building, Boise State University, Boise, Idaho | Lukenga Construction | $370,983 | 1. $6,375 2. $41,112 3. $39,346 4. $15,060 |
|
| Commerical Remodeling | $349,995 | 1. $5,356 2. $18,976 3. $17,724 4. $10,076 |
||||
| Gafford Construction | $398,490 | 1. $2,778 2. $41,994 3. $25,167 4. $11,427 |
||||
| Kepha Construction | $371,851 | 1. $5,761 2. $30,046 3. $21,593 4. $9,765 |
||||
| Alpine Construction | $353,600 | 1. $1,900 2. $39,500 3. $27,500 4. $19,300 |
||||
| Wright Brothers | $311,000 | 1. $4,491 2. $28,740 3. $22,604 4. $7,943 |
||||
| Steed Construction | $299,600 | 1. $4,283 2. $35,150 3. $24,870 4. $9,214 |
||||
| Ellsworth Kincaid Construction | $320,750 | 1. $4,300 2. $39,400 3. $26,100 4. $10,900 |
||||
| Ovard Construction | $363,867 | 1. $4,716 2. $42,192 3. $35,496 4. $12,147 |
||||
| Perkins Construction | $329,000 | 1. $5,400 2. $40,700 3. $26,750 4. $11,840 |
||||
| Excelsior Construction | $304,000 | 1. $4,500 2. $37,800 3. $27,500 4. $10,300 |
||||
| 05-28-09 | 09852 | Floor Covering Service Contract, Greater Lewiston Area | A&R Construction | $103,350 | ||
| Skelton's Carpet One | $75,130 | |||||
| 05-28-09 | 08571 | Replace HVAC, District 1 Headquarters, Idaho Transportation Department, Coeur d’Alene, Idaho | Air Tech | $958,960 | ||
| 3-H Mechanical | $733,490 | |||||
| Tyko Mechanical | $659,200 | |||||
| 05-28-09 | 09060 | Replace Fire Alarms, Selected Support Buildings, ISCI, Department of Correction, Boise, Idaho | Anderson & Wood Construction | $109,445 | 1. $64,930 | |
| Alarmco/Romar Electric | $86,800 | 1. $67,200 | ||||
| Doherty Electric | $77,900 | 1. $44,000 | ||||
| Quality Electric | $81,350 | 1. $50,600 | ||||
| 05-27-09 | 08260 | Deck Repair, Paradise Street Bridge, University of Idaho, Moscow, Idaho | Westway Construction | $172,140 | 1. $72,000 2. $37,000 |
|
| A&R Construction | $121,000 | 1. $62,000 2. $30,000 |
||||
| S&L Underground | $169,000 | 1. $64,000 2. $20,000 |
||||
| Brown Contracting | $166,200 | 1. $49,000 2. $38,200 |
||||
| 05-27-09 | 08252 | Re-Roof, Life Science South, University of Idaho, Moscow, Idaho | CMR Construction and Roofing | $649,424 | 1. $518,231 2. $33,469 |
|
| Upson Company | $697,000 | 1. $556,000 2. $26,000 |
||||
| Quality Tile Roofing | $950,000 | 1. $16,000 2. $42,000 |
||||
| Cobra Roofing | $807,175 | 1. $115,000 2. $19,200 |
||||
| Gillespie Roofing | $1,109,206 | 1. $130,000 2. $22,825 |
||||
| 05-26-09 | 09541 | Replace Existing Maintenance Building, Lava Hot Springs Foundation, Lava Hot Springs, Idaho | Bailey Construction | $278,555 | 1. $23,183 2. $17,114 3. $726 4. $11,512 5. $4,347 6. $48,053 |
|
| Bear Lake Construction | $237,459 | 1. $17,140 2. $11,411 3. $1,142 4. $7,200 5. $2,500 6. $6,000 |
||||
| Brennan Construction | $209,819 | 1. $14,880 2. $13,863 3. $1,185 4. $6,480 5. $4,779 6. $4,502 |
||||
| Bricon, Inc. | $217,900 | 1. $16,000 2. $17,800 3. $1,000 4. $6,900 5. $9,500 6. $5,400 |
||||
| DeWall Construction | $196,700 | 1. $14,700 2. $14,000 3. $177 4. $6,300 5. $7,100 6. $4,600 |
06-02-09 | |||
| Harris, Inc. | $209,000 | 1. $14,500 2. $15,000 3. $850 4. $7,400 5. $4,400 6. $4,300 |
||||
| Ovard Construction | $247,000 | 1. $25,500 2. $15,560 3. $620 4. $6,930 5. $10,730 6. $5,050 |
||||
| SE/Z Construction | $258,193 | 1. $22,108 2. $14,876 3. $550 4. $6,537 5. $9,968 6. $5,712 |
||||
| Western Builders *NON-RESPONSIVE* |
||||||
| K&T Excavation | $252,756 | 1. $14,835 2. $22,270 3. $990 4. $12,437 5. $3,945 6. $4,727 |
||||
| Kiggins Concrete & Construction | $210,000 | 1. $14,930 2. $17,500 3. $2,500 4. $6,800 5. $6,000 6. $5,000 |
||||
| 05-21-09 | 09858 | Floor Covering Service Contract, Capitol Mall | Wall-2-Wall | $60,530 | ||
| Designer Floors | $68,850 | |||||
| 05-21-09 | 10280 | Legislature Live/Idaho Reports Studio, JRW, Idaho Public Television, Boise Idaho | Ovard Construction | $211,460 | 1. $10,894 | |
| Bricon, Inc. | $199,600 | 1. $5,800 | ||||
| Ellsworth Kincaid Construction | $183,500 | 1. $8,960 | ||||
| Commercial Remodeling | $182,893 | 1. $5,097 | ||||
| KEPHA Construction | $182,000 | 1. $7,736 | ||||
| Alpine Construction | $206,858 | 1. $5,607 | ||||
| Wright Brothers Construction | $183,839 | 1. $7,400 | ||||
| K-J Corporation | $185,000 | 1. $7,600 | ||||
| 05-14-09 | 08016 | Replace Ceiling Systems/Install Fire Sprinklers, JRW Building, Department of Administration, Boise, Idaho | Ellsworth Kincaid Construction | $719,770 | 1. $90,500 2. $83,500 3.$18,765 |
|
| KEPHA Construction | $740,256 | 1. $106,771 2. $89,181 3.$18,150 |
||||
| Wright Brothers Construction | $778,842 | 1. $90,022 2. $79,786 3. $18,501 |
||||
| Ovard Construction | $786,690 | 1. $102,727 2. $85,107 3. $18,873 |
||||
| Hobson Fabricating, Inc. | $768,000 | 1. $108,897 2. $86,395 3. $19,000 |
||||
| Perkins Construction | $716,000 | 1. $99,000 2. $87,000 3. $19,000 |
||||
| K-J Corporation | $698,700 | 1. $96,800 2. $81,600 3. $19,000 |
06-02-09 | |||
| Steed Construction | $796,500 | 1. $125,350 2. $114,250 3. $37,750 |
||||
| 05-14-09 | 09285 | Compact Mobile Shelving, Phase 2, Idaho History Center, Idaho State Historical Society, Boise, Idaho | SpaceSaver | $223,661 | 1. $17,635 2. $34,607 3. $1,765 4. $46,799 D1. -$49,449 D2. -$5,234 |
|
| Radix Construction | $314,900 | 1. $16,700 2. $43,800 3. $2,500 4. $62,000 D1. -$76,076 D2. -$8,354 |
||||
| K-J Corporation | $285,000 | 1. $15,000 2. $46,200 3. $2,500 4. $67,200 D1. -$59,600 D2. -$6,700 |
||||
| 05-14-09 | 08380 | Remodel Bathrooms, Phase 2, SHN, Department of Health & Welfare, Orofino, Idaho | S & W Construction | $208,754 | 1. $49,793 | 06-16-09 |
| Idaho Stage | $237,000 | 1. $47,000 | ||||
| Kenaston Corp. | $255,600 | 1. $64,891 | ||||
| Holcomb General Contracting | $299,300 | 1. $56,000 | ||||
| Wimer Corp. | $401,913 | 1. $118,000 | ||||
| 05-13-09 | 08091B | Parking Lot Expansion, College of Southern Idaho, Twin Falls, Idaho | KD Excavation | $88,000 | 05-28-09 | |
| Gordon Paving | $88,993.84 | |||||
| Stutzman, Inc. | $118,500 | |||||
| Burks Excavation | $95,000 | |||||
| Idaho Sand & Gravel | $113,676 | |||||
| Lakeside Industries | $96,622.53 | |||||
| Extreme Excavation | $89,760 | |||||
| Kiggins Concrete & Construction | $103,600 | |||||
| Robert Durham Excavating | $105,573.20 | |||||
| 05-12-09 | 08401 | HVAC Retrofit, Administration Building, SHS, Department of Health & Welfare, Blackfoot, Idaho | B&G Plumbing | $310,000 | ||
| Capitol City Plumbing | $314,000 | |||||
| Rivers West Construction | $325,000 | |||||
| 05-12-09 | 08183 | Classroom Addition, Lakeside Center, North Idaho College, Coeur d'Alene, Idaho | Smalls Construction | $154,000 | ||
| CMEC | $123,696 | 06-02-09 | ||||
| Dardan Enterprises *NON-RESPONSIVE* |
||||||
| James Construction | $139,300 | |||||
| Ginno Construction | $125,650 | |||||
| Beck Construction | $141,000 | |||||
| Associated Construction | $152,997 | |||||
| 05-07-09 | 08342 | Renovate Idaho Falls Readiness Center, Division of Military, Idaho Falls, Idaho | Bailey Construction | $1,140,000 | 1. $23,819 2. $12,934 3. $42,590 4. $5,252 |
|
| Barry Hayes Construction | $1,096,316 | 1. $17,561 2. $13,863 3. $37,173 4. $4,223 |
||||
| Bateman-Hall General Contractors | $1,163,000 | 1. $24,000 2. $12,500 3. $36,000 4. $4,000 |
||||
| DeWall Construction | $999,900 | 1. $16,500 2. $12,100 3. $29,200 4. $3,990 |
||||
| D. L. Beck Construction | $1,038,950 | 1. $17,700 2. $14,700 3. $51,000 4. $7,900 |
||||
| Double E Construction | $972,967 | 1. $18,130 2. $13,262 3. $42,565 4. $4,369 |
05-20-09 | |||
| Ellsworth Kincaid Construction | $1,217,000 | 1. $24,400 2. $12,750 3. $43,000 4. $5,000 |
||||
| Harris, Inc. | $1,043,000 | 1. $25,400 2. $13,000 3. $36,500 4. $5,400 |
||||
| Interwest Corporation | $1,285,000 | 1. $23,900 2. $12,500 3. $31,600 4. $5,100 |
||||
| J&S Construction | $1,119,200 | 1. $18,000 2. $14,000 3. $48,000 4. $19,200 |
||||
| Ovard Construction | $1,063,040 | 1. $24,860 2. $14,960 3. $25,360 4. $9,130 |
||||
| Rivers West Construction | $1,163,000 | 1. $18,400 2. $13,000 3. $35,000 4. $4,900 |
||||
| SE/Z Construction | $976,606 | 1. $17,495 2. $12,800 3. $33,603 4. $18,359 |
||||
| Shook Construction | $1,075,392 | 1. $17,386 2. $14,650 3. $29,101 4. $4,336 |
||||
| Valley Design & Construction | $1,271,000 | 1. $25,300 2. $13,200 3. $42,500 4. $14,200 |
||||
| Vern Clark & Sons Construction | $1,127,000 | 1. $19,200 2. $13,500 3. $30,000 4. $6,000 |
||||
| 05-07-09 | 09310 | Remodel, Sub-Regional Office, McCall, Department of Fish and Game, McCall Idaho | Bricon, Inc. | $30,600 | 1. $2,150 2. $6,018 |
05-21-09 |
| Hellmann Construction, Inc. | $54,422 | 1. $1,201 2. $5,156 |
||||
| Ellsworth Kincaid Construction | $43,575 | 1. $1,092 2. $5,776 |
||||
| Gafford Construction | $53,893 | 1. $1,166 2. $4,612 |
||||
| Caliber Construction | $53,125 | 1. $4,943 2. $1,340 |
||||
| Alpine Construction | $53,700 | 1. $1,800 2.$1,950 |
||||
| Northwest Technologies | $54,850 | 1. $1,614 2. $8,195 |
||||
| Petra Construction | $37,320 | 1. $1,467 2.$5,769 |
||||
| Richard L Jordan | $48,453 | 1. $2,800 2.$5,343 |
||||
| 05-06-09 | 08261 | Exterior Envelope Repairs, Memorial Gym, University of Idaho, Moscow, Idaho | Pioneer Masonry | $317,000 | 1. $19,000 | 05-18-09 |
| Hydro Tech | $422,000 | 1. $11,640 | ||||
| Anderson Masonry | $663,378 | 1. $41,760 | ||||
| Talisman Construction Services | $428,234 | 1. $16,311 | ||||
| Pioneer Waterproofing | $529,000 | 1. $25,000 | ||||
| Kenaston Corporation | $498,868 | 1. $48,989 | ||||
| RRACO Inc. | $461,395 | 1. $29,929 | ||||
| 05-04-09 | 09196 | Replace Fire Alarm, Morrison Center, Boise State University, Boise, Idaho | Simplex Grinnell | $171,960 | 1. $25,675 | |
| Alarmco, Inc. | $269,580 | 1. $45,820 | ||||
| Allied General | $198,919 | 1. $38,880 | ||||
| 04-30-09 | 08245 | Renovate, Dental Arts Building, Idaho State University, Pocatello, Idaho | DeWall Construction | $51,000 | 1. $1,000 2. $6,700 |
|
| DP Construction | $98,400 | 1. $4,510 2. $10,100 |
||||
| Rivers West Construction | $83,700 | 1. $1,800 2. $11,600 |
||||
| Harris Inc | $48,000 | 1. $800 2. $7,500 |
06-09-09 | |||
| 04-30-09 | 08095 Rebid | Lighting, Physical Education Building, College of Southern Idaho, Twin Falls, Idaho | Skyview Electric *NON-RESPONSIVE* |
|||
| Wheeler Electric | $158,050 | |||||
| Argus Electric *NON-RESPONSIVE* |
||||||
| Portneuf Electric | $133,757 | |||||
| Campbell Electric | $81,916 | 05-13-09 | ||||
| Anderson & Wood | $93,200 | |||||
| Freedom Electric *NON-RESPONSIVE* |
||||||
| Idaho Electric Contracting | $99,800 | |||||
| 04-28-09 | 09361 | Replace One Boiler, ISSH, Department of Health & Welfare, Nampa, Idaho | Buss Mechanical Services | $189,000 | 1. $12,000 | |
| West-Tech Boiler Works, Inc. | $184,345 | 1. $12,000 | ||||
| Drake Mechanical, Inc. | $269,490 | 1. $16,627 | ||||
| Alloway Electric *NON-RESPONSIVE* |
||||||
| Ridgeway Industrial, Inc. | $146,739.87 | 1. $12,585.59 | 05-04-09 | |||
| 04-23-09 | 08258 | Exterior Envelope Repairs, Life Science South, University of Idaho, Moscow, Idaho | Hydro Tech | $622,000 | ||
| Pioneer Waterproofing | $412,000 | |||||
| Pioneer Masonry Restoration | $547,000 | |||||
| Talisman Construction Services | $494,147 | |||||
| RRACO Inc | $477,859 | |||||
| Kenaston Corporation | $620,500 | |||||
| 04-16-09 | 08068 Rebid | Replace Rooftop Units, PWCC, Department of Correction, Pocatello, Idaho | Heyrend Enterprises | $211,816 | 1. $14,267 2. $11,097 3. $11,165 4. $18,707 5. $13,670 |
04-27-09 |
| Young Electric Heating & Air | $239,700 | 1. $13,144 2. $9,472 3. $9,397 4. $16,648 5. $13,300 |
||||
| Hobson Fabricating | $233,000 | 1. $15,000 2. $11,700 3. $11,700 4. $19,300 5. $15,000 |
||||
| TVR | $218,710 | 1. $13,024 2. $10,017 3. $9,945 4. $18,078 5. $13,100 |
||||
| Economy Heating & Refrigeration | $248,000 | 1. $15,590 2. $12,735 3. $12,735 4. $19,700 5. $16,220 |
||||
| Lewis Corporation | $226,100 | 1. $14,000 2. $11,800 3. $11,800 4. $17,650 5. $14,750 |
||||
| 04-16-09 | 09603 | Install New Lighting Fixtures, VETB, Division of Veterans Services, Boise, Idaho | Rundle Electric | $119,500 | 04-29-09 | |
| Quality Electric | $156,908 | |||||
| Tri-State Electric | $153,975 | |||||
| Anderson & Wood | $172,500 | |||||
| Alloway Electric | $142,750 | |||||
| Benchmark | $163,900 | |||||
| Bowman's Inc. | $256,492 | |||||
| Mountain Power | $136,586 | |||||
| A.M.E. Electric | $171,000 | |||||
| Challenger Companies | $192,527 | |||||
| Northwest Electrical | $170,387 | |||||
| Idaho Electric | $136,529 | |||||
| 04-15-09 | 08268 | Replace Roof/Clerestory Modification, JW Martin Lab, University of Idaho, Moscow, Idaho | Gillespie Roofing | $489,770 | 1. $2.90 2. $6.00 |
|
| Golis Construction | $569,000 | 1. $1.00 2. $4.00 |
||||
| Icon | $476,000 | 1. $2.90 2. $6.90 |
||||
| RMR Construction | $427,000 | 1. $2.00 2. $6.50 |
||||
| Granite Enterprises | $399,578 | 1. $3.20 2. $10.30 |
||||
| Summit Roofs | $576,400 | 1. $4.47 2. $14.62 |
||||
| Reiber Construction | $367,000 | 1. $6.00 2. $9.00 |
04-27-09 | |||
| RRACO | $425,896 | 1. $2.55 2. $8.95 |
||||
| Kenaston | $428,854 | 1. $2.40 2. $7.20 |
||||
| 04-14-09 | 08615 REBID | Repair Asphalt/Sealcoat Parking Lot, VETL, Division of Veterans Services, Lewiston, Idaho | Herco | $79,435 | 1. $12,714 2. $34,840 3. $21,369 4. $5,741 |
|
| McCall's Classic Construction | $72,500 | 1. $12,767.05 2. $32,121.71 3. $26,627.79 4. $5,282.23 |
||||
| Giese Paving & Excavation | $80,644 | 1. $15,280 2. $38,953 3. $24,746 4. $5,000 |
||||
| Poe Asphalt Paving | $76,968.44 | 1. $11,850.06 2. $32,309.00 3. $26,813.63 4. $6,067.38 |
||||
| M.L. Albright | $62,210 | 1. $12,810 2. $36,910 3. $25,230 4. $5,690 |
04-22-09 | |||
| R.L. Young Paving | $70,747.51 | 1. $14,558.86 2. $31,482.00 3. $26,584.58 4. $7,665.38 |
For more information regarding this page, please email Construction Management or call 208.332.1900.