| Submission Date |
Project Number |
Project Name |
Contractor |
Base Bid |
Alternates |
Awarded |
| 09-08-09 | 09236 | Conveyor/Dust Collection System, Heat Plant, Idaho State University, Pocatello, Idaho | Industrial Metal | $310,000 | ||
| Rivers West Construction | $350,000 | |||||
| Vern Clark & Sons Construction | $225,000 | 09-25-09 | ||||
| Hobson Fabricating | $226,.800 | |||||
| Economy Heating & Refrigeration | $295,000 | |||||
| Barry Hayes Construction | $227,522 | |||||
| 09-03-09 | 08280 | Paint Broadcast Towers, Idaho Public Television, Moscow & Jerome, Idaho | S & S Coatings | $137,790 | 1. $135,500 | |
| National Coatings | $56,900 | 1. $29,700 | ||||
| Preferred Tank & Tower | $9,950 | 1. $8,500 | ||||
| Base Painters | $17,403 | $13,278 | ||||
| Adam Roe Painting | $342,000 | 1. $236,000 | ||||
| Abhe & Svoboda | $32,000 | 1. $18,000 | ||||
| DePaolo Painting | $25,000 | 1. $24,000 | ||||
| 09-03-09 | 09252 | Lagoon Repair & Improvements, Reclaimed Water System, University of Idaho, Moscow, Idaho | S & L Underground | $670,000 | 1. $2,500 2. $7,200 3. $6,500 4. $7,000 |
|
| McAlvain Civil | $777,900 | 1. $1,900 2. $13,200 3. $11,298.17 4. $9,998.98 |
||||
| Atlas Sand & Gravel | $708,000 | 1. $6,250 2. $10,000 3. $7,000 4. $6,500 |
||||
| B.F. Builders | $665,300 | 1. $1,650 2. $3,200 3. $7,315 4. $7,000 |
||||
| Brown Contracting | $720,000 | 1. $5,750 2. $12,400 3. $5,500 4. $6,800 |
||||
| TML Construction | $659,928 | 1. $3,500 2. $9,200 3. $8,500 4. $7,100 |
||||
| Clearwater Construction | $767,848 | 1. $2,500 2. $7,200 3. $7,200 4. $6,200 |
||||
| Debco Construction | $800,000 | 1. $3,000 2. $12,800 3. $5,200 4. $7,126 |
||||
| Wright Brothers | $650,647 | 1. $1,547.50 2. $12,475 3. $6,757 4. $6,064 |
||||
| Graham Construction | $786,000 | 1. $11,288 2. $10,500 3. $7,600 4. $6,400 |
||||
| ML Albright & Sons | $774,602 | 1. $3,750 2. $12,800 3. $9,500 4. $8,450 |
||||
| Citadel Construction | $748,000 | 1. $11,400 2. $10,600 3. $7,685 4. $7,145 |
||||
| 09-01-09 | 10220 | Re-Roof Law Enforcement Education Building, Idaho State University, Pocatello, Idaho | Modern Roofing | $65,140 | 09-22-09 | |
| Robison Roofing | $73,461 | |||||
| 08-25-09 | 08267 | Extension, Stadium Drive, University of Idaho, Moscow, Idaho | Atlas Sand & Rock | $1,644,000 $134,000 Unit Price $6,500 |
1. $-79,000 2. $16,000 |
|
| ML Albright & Sons | $1,430,805 $134,350 Unit Price $15,000 |
1. $-83,110 2. $26,400 |
||||
| Motley-Motley | $1,434,700 $135,700 Unit Price $5,000 |
1. $-82,600 2. $22,260 |
09-16-09 | |||
| 08-20-09 | 08070 Rebid | Replace HVAC Units, McKellway Hall, ICIO, Department of Correction, Orofino, Idaho | Hobson Fabricating | $408,400 | 1. $103,800 | 08-27-09 |
| Arnzen Building Construction | $489,281 | 1. $134,916 | ||||
| 3H Mechanical | $431,905 | 1. $107,932 | ||||
| 08-12-09 | 08176 | Wireless Acess System, Phase 2, Campuswide, North Idaho College, Coeur d'Alene, Idaho | System Tech | $163,554 | 1. $19,141.02 2. $6,832.49 3. $11,113.18 4. $10,372.24 5. $6,832.49 6. $7,713.43 |
|
| Colvico, Inc. | $174,008 | 1. $20,151.00 2. $11,259.00 3. $16,486.00 4. $14,265.00 5. $10,807.00 6. $8,138.00 |
||||
| CMP | $154,868 | 1. $6,395.00 2. $4,430.00 3. $6,395.00 4. $6,410.00 5. $3,775.00 6. $2,465.00 |
08-27-09 | |||
| Orion Integration *NON-RESPONSIVE* |
||||||
| Shannon Electric | $128,795 | 1. $20,062.00 2. $5,744.00 3. $17,592.00 4. $17,086.00 5. $5,691.00 6. $4,270.00 |
||||
| Thorco, Inc. | $152,500.00 | 1. $17,500.00 2. $11,750.00 3. $24,500.00 4. $27,500.00 5. $11,500.00 6. $8,500.00 |
||||
| 08-06-09 | 09330 | Remodel, Nampa Readiness Center, Division of Military, Nampa, Idaho | Dave Allen Construction | $760,000 | 1. $43,571 2. $13,365 3. $14,157 4. $37,237 5. $113,994 6. $1,733 Item Cost $8,777 |
|
| Gafford Construction | $768,258 | 1. $42,125 2. $13,122 3. $8,932 4. $16,176 5. $88,232 6. $1,694 Item Cost $8,019 |
||||
| The Ewing Co. | $ 784,500 | 1. $41,590 2. $10,338 3. $8,684 4. $14,780 5. $76,654 6. $1,875 Item Cost $10,000 |
||||
| KEPHA Construction | $739,484 | 1. $39,578 2. $12,474 3. $9,035 4. $11,315 5. $72,786 6. $1,617 Item Cost $6,500 |
||||
| Ovard Construction | $707,300 | 1. $42,400 2. $12,000 3. $13,000 4. $15,300 5. $88,400 6. $1,900 Item Cost $7,500 |
||||
| Perkins Construction | $751,000 | 1. $42,000 2. $12,800 3. $7,000 4. $9,700 5. $52,600 6. $3,300 Item Cost $8,000 |
08-19-09 | |||
| Bricon | $767,000 | 1. $43,000 2. $13,300 3. $8,000 4. $9,700 5. $68,000 6. $2,300 Item Cost $11,000 |
||||
| Alpine Construction | $739,000 | 1. $41,000 2. $12,900 3. $25,500 4. $17,100 5. $96,000 6. $2,100 Item Cost $1,400 |
||||
| Ellsworth Kincaid Construction | $713,300 | 1. $41,084 2. $9,150 3. $11,730 4. $16,140 5. $88,700 6. $1,926 Item Cost $8,570 |
||||
| Stock Construction Management Services | $727,000 | 1. $41,040 2. $864 3. $7,884 4. $17,612 5. $88,700 6. $1,625 Item Cost $10,370 |
||||
| Guho Corporation | $755,525 | 1. $40,477 2. $12,757 3. $8,634 4. $18,612 5. $82,882 6. $3,283 Item Cost $6,727 |
||||
| 08-06-09 | 07196 | Fire Alarm Replacement, Phase 3, Selected Buildings, Boise State University, Boise, Idaho | Simplex Grinell | $98,125 | 1. $20,245 2. $10,985 3. $14,525 |
08-19-09 |
| Doherty Electric | $154,345 | 1. $31,776 2. $17,963 3. $12,330 |
||||
| 07-31-09 | 08340 | Site Preparation, Phase 2, Sandpoint RC, Division of Military, Sandpoint Idaho | Lippert Equipment | $64,986 | 08-07-09 | |
| Earthworks | $71,590 | |||||
| J&M Excavation | $66,959 | |||||
| Robert B Goebel, General Contractor, Inc. | $78,735 | |||||
| Northwest Fence Company | $86,635 | |||||
| J.H. Landworks | $87,030 | |||||
| 07-28-09 | 09150 REBID | 4th Street Parking Project, Phase 2, Lewis Clark State College, Lewiston, Idaho | McCall Classic Construction | $458,455.27 | 1. $55,620 2. $43,620 3. $48,250.31 4. $133,706.77 5. $43,445.40 6. $23,072 |
08-06-09 |
| M.L. Albright & Sons | $540,690 | 1. $56,175 2. $43,575 3. $53,200 4. $138,555 5. $43,050 6. $31,750 |
||||
| Paul Construction | $629,663 | 1. $64,000 2. $50,177 3. $101,823 4. $158,157 5. $50,000 6. $28,500 |
||||
| 07-21-09 | 08074 | Replace Joints in Hydronic Piping, IMSI, Department of Correction, Boise, Idaho | Buss Mechanical | $58,044 | Base + Unit Prices $216,406 |
|
| RM Mechanical | $78,374 | Base + Unit Prices $230,700 |
||||
| Lacy Mechancial | $177,700 | Base + Unit Prices $203,103.09 |
07-23-09 | |||
| Paige Mechanical Group | $85,000 | Base + Unit Prices $220,385 |
||||
| 07-21-09 | 09332 | Remodel Readiness Center, Caldwell, Division of Military, Caldwell, Idaho | R Squared Construction | $1,067,827 | 1. $67,400 2. $24,200 |
|
| Perkins Construction | $985,000 | 1. $127,500 2. $24,000 |
||||
| Wright Brothers | $903,848 | 1. $58,451 2. $21,098 |
07-30-09 | |||
| CMEC | $1,089,305 | 1. $225,948 2. $34,443 |
||||
| Alpine Construction | $986,200 | 1. $120,140 2. $27,090 |
||||
| Gafford Construction | $1,021,394 | 1. $131,859 2. $24,085 |
||||
| Scott Hedrick Construction | $1,336,000 | 1. $99,000 2. $35,000 |
||||
| SE/Z Construction | $993,783 | 1. $129,848 2. $23,659 |
||||
| KEPHA Construction | $1,000,866 | 1. $64,886 2. $23,124 |
||||
| Ovard Construction | $993,630 | 1. $127,580 2. $24,050 |
||||
| The Ewing Company | $1,018,750 | 1. $123,420 2. $26,832 |
||||
| Datum Construction Management | $1,130,164 | 1. $169,338 2. $29,968 |
||||
| 07-09-09 | 09206 | Replace Retractable Platform Seating, Taco Bell Arena, Boise State University, Boise, Idaho | Irwin Seating Company | $ 628,180.00 | 1. $7,066.76 2. $52,766.00 3. $52,766.00 |
|
| R.A. Ridges Company, Inc. | $ 416,302.00 | 1. $ 7,091.00 2. $ 32,905.00 3. $ 32,905.00 |
||||
| 07-01-09 | 07062 | Additional Fence and Sallyport, SICI, Department of Correction, Boise, Idaho | Anderson & Wood Construction | $1,481,600 | 1. $44,175 2. $24,581 |
|
| Ewing Company | $1,164,800 | 1. $26,068 2. $16,613 |
||||
| Scott Hedrick Construction | $1,127,000 | 1. $15,000 2. $32,000 |
||||
| KEPHA Construction | $1,124,000 | 1. $14,182 2. $30,907 |
||||
| Stock Construction Management | $1,143,000 | 1. $24,150 2. $22,488 |
||||
| Guho Corporation | $1,227,000 | 1. $13,900 2. $38,485 |
||||
| Engineered Structures, Inc. | $1,098,800 | 1. $17,350 2. $20,800 |
||||
| Ovard Construction | $1,328,290 | 1. $19,290 2. $23,140 |
||||
| Wright Brothers | $1,052,010 | 1. $13,466 2. $28,345 |
07-16-09 | |||
| Sletten Construction | $1,224,000 | 1. $15,500 2. $29,500 |
||||
| 06-23-09 | 08336 | Renovate Hailey RC, Division of Military, Boise, Idaho | Perkins Construction | $643,000 | ||
| DeWall Construction | $672,500 | |||||
| Hayes Construction Company | $632,287 | |||||
| Valley Design & Construction | $728,000 | |||||
| Kepha Construction | $657,700 | |||||
| EKC | $652,000 | |||||
| CSDI | $629,800 | |||||
| K-J Corporation | $712,000 | |||||
| Wright Brothers Construction | $668,594 | |||||
| Stock Construction Management Services | $603,000 | 06-26-09 | ||||
| Steed Construction | $615,800 | |||||
| Ovard Construction | $621,450 | |||||
| Beniton Construction | $719,837 | |||||
| SE/Z Construction | $624,324 | |||||
| Century Contractors | $726,272 | |||||
| 06-18-09 | 09150 | 4th Street Parking, Phase 2, Lewis & Clark State College, Lewiston, Idaho ALL BIDS REJECTED |
McCall Classic Construction *NON-RESPONSIVE* |
|||
| Western Construction & Excavation *BID RELIEF GRANTED* |
||||||
| M. L. Albright & Sons | $571,872 | 1. $66,126 2. $46,600 3. $53,200 4. $141,380 5. $46,545 6. $33,325 |
||||
| Paul Construction | $612,600 | 1. $72,300 2. $52,250 3. $104,700 4. $156,000 5. $52,200 6. $28,500 |
||||
| 06-18-09 | 09400 | Upgrade Elevators, SHS, Department of Health & Welfare, Blackfoot, Idaho | DeWall Construction | $219,000 | 1. $42,800 2. $98,500 3. $4,600 |
|
| Harris, Inc. | $233,000 | 1. $47,000 2. $104,000 3. $4,800 |
||||
| J&S Construction | $260,800 | 1. $45,000 2. $96,000 3. $5,400 |
||||
| Ovard Construction | $270,694 | 1. $46,220 2. $95,440 3. $5,110 |
||||
| Rivers West Construction | $264,000 | 1. $51,500 2. $113,600 3. $5,500 |
||||
| Vern Clark & Sons Construction | $243,000 | 1. $45,000 2. $93,000 3. $3,700 |
||||
| 06-17-09 | 09220 | Renovate Measurement and Control, Engineering Research Center, Phase 2, Idaho State University, Pocatello, Idaho | Barry Hayes Construction | $394,630 | 1. $15,339 2. $19,457 3. $18,000 |
|
| Century Contractors | $454,542 | 1. $19,681 2. $23,507 3. $16,774 |
||||
| DeWall Construction | $428,900 | 1. $18,100 2. $21,600 3. $18,300 |
||||
| Harper Construction | $484,900 | 1. $20,800 2. $18,300 3. $18,770 |
||||
| Harris, Inc. | $444,500 | 1. $17,500 2. $23,000 3. $16,000 |
||||
| Ovard Construction | $461,650 | 1. $19,720 2. $27,120 3. $15,890 |
||||
| SE/Z Construction | $448,432 | 1. $15,334 2. $23,904 3. $13,895 |
||||
| Valley Design & Construction | $848,000 | 1. $19,000 2. $41,400 3. $18,700 |
||||
| Vern Clark & Sons Construction | $447,000 | 1. $9,400 2. $24,000 3. $16,000 |
||||
| 06-11-09 | 08263 | HVAC Improvements, Swim Center, University of Idaho, Moscow, Idaho | Hobson Fabricating, Inc | $490,963 | 1. $11,200 2. $34,200 3. $19,866 |
|
| 3-H Mechanical | $483,590 | 1. $10,080 2. $30,218 3. $17,768 |
06-24-09 | |||
| RM Mechanical | $476,813 | 1. $11,114 2. $33,152 3. $21,515 |
||||
| 05-11-09 | 08271 | New Elevator, Alumni Residence Center, University of Idaho, Moscow, Idaho | ||||
| Wright Brothers Construction | $442,989 | 1. $94,831 2. $2,500 |
||||
| Golis Construction | $478,500 | 1. $112,000 2. $3,500 |
||||
| Wimer Corporation | $428,094 | 1. $70,544 2. $3,450 |
07-07-09 | |||
| RRACO Inc | $449,000 | 1. $106,000 2. $3,000 |
||||
| Brown Contracting | $517,000 | 1. $128,000 2. $3,300 |
||||
| Citadel Construction | $474,950 | 1. $105,375 2. $3,200 |
||||
| Kenaston Corporation | $528,000 | 1. $130,000 2. $3,600 |
||||
| 06-09-09 | 08406 | Emergency Preparedness Isolation Room, SHS, Department of Health & Welfare, Blackfoot, Idaho | Barry Hayes Construction | $124,790 | ||
| Century Contractors | $136,633 | |||||
| DeWall Construction | $114,000 | 06-17-09 | ||||
| Harper Construction | $159,600 | |||||
| Harris, Inc. | $119,500 | |||||
| J & S Construction | $151,950 | |||||
| Rivers West Construction | $118,570 | |||||
| SE/Z Construction | $129,929 | |||||
| Vern Clark & Sons Construction | $129,500 | |||||
| 06-04-09 | 09223 | Exterior Emergency Notification, System, Campus Wide, Idaho State University, Pocatello, Idaho | Rivers West | $108,000 | 1. $24,000 | |
| Bear River Electric | $104,520 | 1. $22,965 | 06-11-09 | |||
| Portneuf Electric | $112,470 | 1. $19,170 | ||||
| DeWall Construction | $108,900 | 1. $26,200 | ||||
| Wheeler Electric | $140,100 | 1. $21,300 | ||||
| Anderson & Wood Construction | $108,160 | 1. $24,700 | ||||
| 06-03-09 | 10190 | Steam & Condensate Line Replacement, Boise State University, Boise, Idaho | Buss Mechanical Services | $205,800 | 1. $89,200 2. $24,000 |
|
| Cloverdale Plumbing Co. | $240,000 | 1. $102,800 2. $28,280 |
||||
| DeBest Plumbing & Mechanical | $226,638 | 1. $96,970 2. $30,889 |
||||
| Lacy Mechanical | $234,000 | 1. $96,000 2. $25,900 |
||||
| RM Mechanical | $160,187 | 1. $70,693 2. $53,132 |
06-12-09 | |||
| Ridgeway Industrial | $278,000 | 1. $99,500 2. $31,000 |
||||
| Paige Mechanical Group | $268,000 | 1. $92,000 2. $39,100 |
||||
| 06-01-09 | 08213 | Lab/Classroom Remodel, Engineering-Technology Building, Boise State University, Boise, Idaho | Lukenga Construction | $370,983 | 1. $6,375 2. $41,112 3. $39,346 4. $15,060 |
|
| Commerical Remodeling | $349,995 | 1. $5,356 2. $18,976 3. $17,724 4. $10,076 |
||||
| Gafford Construction | $398,490 | 1. $2,778 2. $41,994 3. $25,167 4. $11,427 |
||||
| Kepha Construction | $371,851 | 1. $5,761 2. $30,046 3. $21,593 4. $9,765 |
||||
| Alpine Construction | $353,600 | 1. $1,900 2. $39,500 3. $27,500 4. $19,300 |
||||
| Wright Brothers | $311,000 | 1. $4,491 2. $28,740 3. $22,604 4. $7,943 |
||||
| Steed Construction | $299,600 | 1. $4,283 2. $35,150 3. $24,870 4. $9,214 |
06-09-09 | |||
| Ellsworth Kincaid Construction | $320,750 | 1. $4,300 2. $39,400 3. $26,100 4. $10,900 |
||||
| Ovard Construction | $363,867 | 1. $4,716 2. $42,192 3. $35,496 4. $12,147 |
||||
| Perkins Construction | $329,000 | 1. $5,400 2. $40,700 3. $26,750 4. $11,840 |
||||
| Excelsior Construction | $304,000 | 1. $4,500 2. $37,800 3. $27,500 4. $10,300 |
||||
| 05-28-09 | 09852 | Floor Covering Service Contract, Greater Lewiston Area | A&R Construction | $103,350 | ||
| Skelton's Carpet One | $75,130 | |||||
| 05-28-09 | 08571 | Replace HVAC, District 1 Headquarters, Idaho Transportation Department, Coeur d’Alene, Idaho | Air Tech | $958,960 | ||
| 3-H Mechanical | $733,490 | |||||
| Tyko Mechanical | $659,200 | 06-12-09 | ||||
| 05-28-09 | 09060 | Replace Fire Alarms, Selected Support Buildings, ISCI, Department of Correction, Boise, Idaho | Anderson & Wood Construction | $109,445 | 1. $64,930 | |
| Alarmco/Romar Electric | $86,800 | 1. $67,200 | ||||
| Doherty Electric | $77,900 | 1. $44,000 | 06-09-09 | |||
| Quality Electric | $81,350 | 1. $50,600 | ||||
| 05-27-09 | 08260 | Deck Repair, Paradise Street Bridge, University of Idaho, Moscow, Idaho | Westway Construction | $172,140 | 1. $72,000 2. $37,000 |
|
| A&R Construction | $121,000 | 1. $62,000 2. $30,000 |
06-09-09 | |||
| S&L Underground | $169,000 | 1. $64,000 2. $20,000 |
||||
| Brown Contracting | $166,200 | 1. $49,000 2. $38,200 |
||||
| 05-27-09 | 08252 | Re-Roof, Life Science South, University of Idaho, Moscow, Idaho | CMR Construction and Roofing | $649,424 | 1. $518,231 2. $33,469 |
06-10-09 |
| Upson Company | $697,000 | 1. $556,000 2. $26,000 |
||||
| Quality Tile Roofing | $950,000 | 1. $16,000 2. $42,000 |
||||
| Cobra Roofing | $807,175 | 1. $115,000 2. $19,200 |
||||
| Gillespie Roofing | $1,109,206 | 1. $130,000 2. $22,825 |
||||
| 05-26-09 | 09541 | Replace Existing Maintenance Building, Lava Hot Springs Foundation, Lava Hot Springs, Idaho | Bailey Construction | $278,555 | 1. $23,183 2. $17,114 3. $726 4. $11,512 5. $4,347 6. $48,053 |
|
| Bear Lake Construction | $237,459 | 1. $17,140 2. $11,411 3. $1,142 4. $7,200 5. $2,500 6. $6,000 |
||||
| Brennan Construction | $209,819 | 1. $14,880 2. $13,863 3. $1,185 4. $6,480 5. $4,779 6. $4,502 |
||||
| Bricon, Inc. | $217,900 | 1. $16,000 2. $17,800 3. $1,000 4. $6,900 5. $9,500 6. $5,400 |
||||
| DeWall Construction | $196,700 | 1. $14,700 2. $14,000 3. $177 4. $6,300 5. $7,100 6. $4,600 |
06-02-09 | |||
| Harris, Inc. | $209,000 | 1. $14,500 2. $15,000 3. $850 4. $7,400 5. $4,400 6. $4,300 |
||||
| Ovard Construction | $247,000 | 1. $25,500 2. $15,560 3. $620 4. $6,930 5. $10,730 6. $5,050 |
||||
| SE/Z Construction | $258,193 | 1. $22,108 2. $14,876 3. $550 4. $6,537 5. $9,968 6. $5,712 |
||||
| Western Builders *NON-RESPONSIVE* |
||||||
| K&T Excavation | $252,756 | 1. $14,835 2. $22,270 3. $990 4. $12,437 5. $3,945 6. $4,727 |
||||
| Kiggins Concrete & Construction | $210,000 | 1. $14,930 2. $17,500 3. $2,500 4. $6,800 5. $6,000 6. $5,000 |
||||
| 05-21-09 | 09858 | Floor Covering Service Contract, Capitol Mall | Wall-2-Wall | $60,530 | ||
| Designer Floors | $68,850 | |||||
| 05-21-09 | 10280 | Legislature Live/Idaho Reports Studio, JRW, Idaho Public Television, Boise Idaho | Ovard Construction | $211,460 | 1. $10,894 | |
| Bricon, Inc. | $199,600 | 1. $5,800 | ||||
| Ellsworth Kincaid Construction | $183,500 | 1. $8,960 | ||||
| Commercial Remodeling | $182,893 | 1. $5,097 | 06-02-09 | |||
| KEPHA Construction | $182,000 | 1. $7,736 | ||||
| Alpine Construction | $206,858 | 1. $5,607 | ||||
| Wright Brothers Construction | $183,839 | 1. $7,400 | ||||
| K-J Corporation | $185,000 | 1. $7,600 | ||||
| 05-14-09 | 08016 | Replace Ceiling Systems/Install Fire Sprinklers, JRW Building, Department of Administration, Boise, Idaho | Ellsworth Kincaid Construction | $719,770 | 1. $90,500 2. $83,500 3.$18,765 |
|
| KEPHA Construction | $740,256 | 1. $106,771 2. $89,181 3.$18,150 |
||||
| Wright Brothers Construction | $778,842 | 1. $90,022 2. $79,786 3. $18,501 |
||||
| Ovard Construction | $786,690 | 1. $102,727 2. $85,107 3. $18,873 |
||||
| Hobson Fabricating, Inc. | $768,000 | 1. $108,897 2. $86,395 3. $19,000 |
||||
| Perkins Construction | $716,000 | 1. $99,000 2. $87,000 3. $19,000 |
||||
| K-J Corporation | $698,700 | 1. $96,800 2. $81,600 3. $19,000 |
06-02-09 | |||
| Steed Construction | $796,500 | 1. $125,350 2. $114,250 3. $37,750 |
||||
| 05-14-09 | 09285 | Compact Mobile Shelving, Phase 2, Idaho History Center, Idaho State Historical Society, Boise, Idaho | SpaceSaver | $223,661 | 1. $17,635 2. $34,607 3. $1,765 4. $46,799 D1. -$49,449 D2. -$5,234 |
06-02-09 |
| Radix Construction | $314,900 | 1. $16,700 2. $43,800 3. $2,500 4. $62,000 D1. -$76,076 D2. -$8,354 |
||||
| K-J Corporation | $285,000 | 1. $15,000 2. $46,200 3. $2,500 4. $67,200 D1. -$59,600 D2. -$6,700 |
||||
| 05-14-09 | 08380 | Remodel Bathrooms, Phase 2, SHN, Department of Health & Welfare, Orofino, Idaho | S & W Construction | $208,754 | 1. $49,793 | 06-16-09 |
| Idaho Stage | $237,000 | 1. $47,000 | ||||
| Kenaston Corp. | $255,600 | 1. $64,891 | ||||
| Holcomb General Contracting | $299,300 | 1. $56,000 | ||||
| Wimer Corp. | $401,913 | 1. $118,000 | ||||
| 05-13-09 | 08091B | Parking Lot Expansion, College of Southern Idaho, Twin Falls, Idaho | KD Excavation | $88,000 | 05-28-09 | |
| Gordon Paving | $88,993.84 | |||||
| Stutzman, Inc. | $118,500 | |||||
| Burks Excavation | $95,000 | |||||
| Idaho Sand & Gravel | $113,676 | |||||
| Lakeside Industries | $96,622.53 | |||||
| Extreme Excavation | $89,760 | |||||
| Kiggins Concrete & Construction | $103,600 | |||||
| Robert Durham Excavating | $105,573.20 | |||||
| 05-12-09 | 08401 | HVAC Retrofit, Administration Building, SHS, Department of Health & Welfare, Blackfoot, Idaho | B&G Plumbing | $310,000 | 05-26-09 | |
| Capitol City Plumbing | $314,000 | |||||
| Rivers West Construction | $325,000 | |||||
| 05-12-09 | 08183 | Classroom Addition, Lakeside Center, North Idaho College, Coeur d'Alene, Idaho | Smalls Construction | $154,000 | ||
| CMEC | $123,696 | 06-02-09 | ||||
| Dardan Enterprises *NON-RESPONSIVE* |
||||||
| James Construction | $139,300 | |||||
| Ginno Construction | $125,650 | |||||
| Beck Construction | $141,000 | |||||
| Associated Construction | $152,997 | |||||
| 05-07-09 | 08342 | Renovate Idaho Falls Readiness Center, Division of Military, Idaho Falls, Idaho | Bailey Construction | $1,140,000 | 1. $23,819 2. $12,934 3. $42,590 4. $5,252 |
|
| Barry Hayes Construction | $1,096,316 | 1. $17,561 2. $13,863 3. $37,173 4. $4,223 |
||||
| Bateman-Hall General Contractors | $1,163,000 | 1. $24,000 2. $12,500 3. $36,000 4. $4,000 |
||||
| DeWall Construction | $999,900 | 1. $16,500 2. $12,100 3. $29,200 4. $3,990 |
||||
| D. L. Beck Construction | $1,038,950 | 1. $17,700 2. $14,700 3. $51,000 4. $7,900 |
||||
| Double E Construction | $972,967 | 1. $18,130 2. $13,262 3. $42,565 4. $4,369 |
05-20-09 | |||
| Ellsworth Kincaid Construction | $1,217,000 | 1. $24,400 2. $12,750 3. $43,000 4. $5,000 |
||||
| Harris, Inc. | $1,043,000 | 1. $25,400 2. $13,000 3. $36,500 4. $5,400 |
||||
| Interwest Corporation | $1,285,000 | 1. $23,900 2. $12,500 3. $31,600 4. $5,100 |
||||
| J&S Construction | $1,119,200 | 1. $18,000 2. $14,000 3. $48,000 4. $19,200 |
||||
| Ovard Construction | $1,063,040 | 1. $24,860 2. $14,960 3. $25,360 4. $9,130 |
||||
| Rivers West Construction | $1,163,000 | 1. $18,400 2. $13,000 3. $35,000 4. $4,900 |
||||
| SE/Z Construction | $976,606 | 1. $17,495 2. $12,800 3. $33,603 4. $18,359 |
||||
| Shook Construction | $1,075,392 | 1. $17,386 2. $14,650 3. $29,101 4. $4,336 |
||||
| Valley Design & Construction | $1,271,000 | 1. $25,300 2. $13,200 3. $42,500 4. $14,200 |
||||
| Vern Clark & Sons Construction | $1,127,000 | 1. $19,200 2. $13,500 3. $30,000 4. $6,000 |
||||
| 05-07-09 | 09310 | Remodel, Sub-Regional Office, McCall, Department of Fish and Game, McCall Idaho | Bricon, Inc. | $30,600 | 1. $2,150 2. $6,018 |
05-21-09 |
| Hellmann Construction, Inc. | $54,422 | 1. $1,201 2. $5,156 |
||||
| Ellsworth Kincaid Construction | $43,575 | 1. $1,092 2. $5,776 |
||||
| Gafford Construction | $53,893 | 1. $1,166 2. $4,612 |
||||
| Caliber Construction | $53,125 | 1. $4,943 2. $1,340 |
||||
| Alpine Construction | $53,700 | 1. $1,800 2.$1,950 |
||||
| Northwest Technologies | $54,850 | 1. $1,614 2. $8,195 |
||||
| Petra Construction | $37,320 | 1. $1,467 2.$5,769 |
||||
| Richard L Jordan | $48,453 | 1. $2,800 2.$5,343 |
||||
| 05-06-09 | 08261 | Exterior Envelope Repairs, Memorial Gym, University of Idaho, Moscow, Idaho | Pioneer Masonry | $317,000 | 1. $19,000 | 05-18-09 |
| Hydro Tech | $422,000 | 1. $11,640 | ||||
| Anderson Masonry | $663,378 | 1. $41,760 | ||||
| Talisman Construction Services | $428,234 | 1. $16,311 | ||||
| Pioneer Waterproofing | $529,000 | 1. $25,000 | ||||
| Kenaston Corporation | $498,868 | 1. $48,989 | ||||
| RRACO Inc. | $461,395 | 1. $29,929 | ||||
| 05-04-09 | 09196 | Replace Fire Alarm, Morrison Center, Boise State University, Boise, Idaho | Simplex Grinnell | $171,960 | 1. $25,675 | 05-20-09 |
| Alarmco, Inc. | $269,580 | 1. $45,820 | ||||
| Allied General | $198,919 | 1. $38,880 | ||||
| 04-30-09 | 08245 | Renovate, Dental Arts Building, Idaho State University, Pocatello, Idaho | DeWall Construction | $51,000 | 1. $1,000 2. $6,700 |
|
| DP Construction | $98,400 | 1. $4,510 2. $10,100 |
||||
| Rivers West Construction | $83,700 | 1. $1,800 2. $11,600 |
||||
| Harris Inc | $48,000 | 1. $800 2. $7,500 |
06-09-09 | |||
| 04-30-09 | 08095 Rebid | Lighting, Physical Education Building, College of Southern Idaho, Twin Falls, Idaho | Skyview Electric *NON-RESPONSIVE* |
|||
| Wheeler Electric | $158,050 | |||||
| Argus Electric *NON-RESPONSIVE* |
||||||
| Portneuf Electric | $133,757 | |||||
| Campbell Electric | $81,916 | 05-13-09 | ||||
| Anderson & Wood | $93,200 | |||||
| Freedom Electric *NON-RESPONSIVE* |
||||||
| Idaho Electric Contracting | $99,800 | |||||
| 04-28-09 | 09361 | Replace One Boiler, ISSH, Department of Health & Welfare, Nampa, Idaho | Buss Mechanical Services | $189,000 | 1. $12,000 | |
| West-Tech Boiler Works, Inc. | $184,345 | 1. $12,000 | ||||
| Drake Mechanical, Inc. | $269,490 | 1. $16,627 | ||||
| Alloway Electric *NON-RESPONSIVE* |
||||||
| Ridgeway Industrial, Inc. | $146,739.87 | 1. $12,585.59 | 05-04-09 | |||
| 04-23-09 | 08258 | Exterior Envelope Repairs, Life Science South, University of Idaho, Moscow, Idaho | Hydro Tech | $622,000 | ||
| Pioneer Waterproofing | $412,000 | 05-04-09 | ||||
| Pioneer Masonry Restoration | $547,000 | |||||
| Talisman Construction Services | $494,147 | |||||
| RRACO Inc | $477,859 | |||||
| Kenaston Corporation | $620,500 | |||||
| 04-16-09 | 08068 Rebid | Replace Rooftop Units, PWCC, Department of Correction, Pocatello, Idaho | Heyrend Enterprises | $211,816 | 1. $14,267 2. $11,097 3. $11,165 4. $18,707 5. $13,670 |
04-27-09 |
| Young Electric Heating & Air | $239,700 | 1. $13,144 2. $9,472 3. $9,397 4. $16,648 5. $13,300 |
||||
| Hobson Fabricating | $233,000 | 1. $15,000 2. $11,700 3. $11,700 4. $19,300 5. $15,000 |
||||
| TVR | $218,710 | 1. $13,024 2. $10,017 3. $9,945 4. $18,078 5. $13,100 |
||||
| Economy Heating & Refrigeration | $248,000 | 1. $15,590 2. $12,735 3. $12,735 4. $19,700 5. $16,220 |
||||
| Lewis Corporation | $226,100 | 1. $14,000 2. $11,800 3. $11,800 4. $17,650 5. $14,750 |
||||
| 04-16-09 | 09603 | Install New Lighting Fixtures, VETB, Division of Veterans Services, Boise, Idaho | Rundle Electric | $119,500 | 04-29-09 | |
| Quality Electric | $156,908 | |||||
| Tri-State Electric | $153,975 | |||||
| Anderson & Wood | $172,500 | |||||
| Alloway Electric | $142,750 | |||||
| Benchmark | $163,900 | |||||
| Bowman's Inc. | $256,492 | |||||
| Mountain Power | $136,586 | |||||
| A.M.E. Electric | $171,000 | |||||
| Challenger Companies | $192,527 | |||||
| Northwest Electrical | $170,387 | |||||
| Idaho Electric | $136,529 | |||||
| 04-15-09 | 08268 | Replace Roof/Clerestory Modification, JW Martin Lab, University of Idaho, Moscow, Idaho | Gillespie Roofing | $489,770 | 1. $2.90 2. $6.00 |
|
| Golis Construction | $569,000 | 1. $1.00 2. $4.00 |
||||
| Icon | $476,000 | 1. $2.90 2. $6.90 |
||||
| RMR Construction | $427,000 | 1. $2.00 2. $6.50 |
||||
| Granite Enterprises | $399,578 | 1. $3.20 2. $10.30 |
||||
| Summit Roofs | $576,400 | 1. $4.47 2. $14.62 |
||||
| Reiber Construction | $367,000 | 1. $6.00 2. $9.00 |
04-27-09 | |||
| RRACO | $425,896 | 1. $2.55 2. $8.95 |
||||
| Kenaston | $428,854 | 1. $2.40 2. $7.20 |
||||
| 04-14-09 | 08615 REBID | Repair Asphalt/Sealcoat Parking Lot, VETL, Division of Veterans Services, Lewiston, Idaho | Herco | $79,435 | 1. $12,714 2. $34,840 3. $21,369 4. $5,741 |
|
| McCall's Classic Construction | $72,500 | 1. $12,767.05 2. $32,121.71 3. $26,627.79 4. $5,282.23 |
||||
| Giese Paving & Excavation | $80,644 | 1. $15,280 2. $38,953 3. $24,746 4. $5,000 |
||||
| Poe Asphalt Paving | $76,968.44 | 1. $11,850.06 2. $32,309.00 3. $26,813.63 4. $6,067.38 |
||||
| M.L. Albright | $62,210 | 1. $12,810 2. $36,910 3. $25,230 4. $5,690 |
04-22-09 | |||
| R.L. Young Paving | $70,747.51 | 1. $14,558.86 2. $31,482.00 3. $26,584.58 4. $7,665.38 |
||||
| 04-09-09 | 08617 | ADA Ramp Rails, Back Loading Dock, VETB, Division of Veterans Services, Boise, Idaho | Panorama Construction | $37,509 | 1. $10,707 | |
| Bricon, Inc. | $29,900 | 1. $8,600 | ||||
| RADIX Construction | $39,600 | 1. $6,500 | ||||
| Hellmann Construction, Inc. | $40,995 | 1. $6,845 | ||||
| Commercial Remodeling | $27,059 | 1. $3,040 | ||||
| R Squared Construction | $35,772 | 1. $6,200 | ||||
| Perkins Construction | $24,400 | 1. $5,656 | ||||
| KEPHA Construction | $28,766 | 1. $5,164 | ||||
| King Excavation | $60,533 | 1. $19,800 | ||||
| Alpine Construction | $27,900 | 1. $6,800 | ||||
| R.A. Schultz & Co., Inc. | $29,971 | 1. $7,995 | ||||
| Hillside Landscape | $47,500 | 1. $8,500 | ||||
| K-J Corporation | $30,800 | 1. $6,000 | ||||
| Wright Brothers Construction | $19,617 | 1. $5,246 | 04-27-09 | |||
| Excelsior Construction | $30,000 | 1. $7,000 | ||||
| Steed Construction | $27,600 | 1. $4,000 | ||||
| Ellsworth Kincaid Construction | $20,754 | 1. $5,925 | ||||
| Gafford Construction | $28,003 | 1. $7,530 | ||||
| 04-09-09 | 08610 | Parking and Bus Load/Unload Area, VETB, Division of Veterans Services, Boise, Idaho | Panorama Construction | $63,801 | ||
| Bricon, Inc. | $47,900 | |||||
| Durham Gravel | $89,000 | |||||
| Paradise Excavation | $117,250.20 | |||||
| RADIX Construction | $67,000 | |||||
| Hellmann Construction, Inc. | $96,992 | |||||
| Gafford Construction | $60,027 | |||||
| Commercial Remodeling | $60,371 | |||||
| Hillside Landscape | $72,000 | |||||
| R Squared Construction | $66,780 | |||||
| Wright Brothers Construction | $47,738 | 04-27-09 | ||||
| Steed Construction | $60,900 | |||||
| Alpine Construction | $53,826 | |||||
| Perkins Construction | $55,900 | |||||
| KEPHA Construction | $56,634 | |||||
| Ellsworth Kincaid Construction | $56,384 | |||||
| King Excavation | $99,900 | |||||
| Excelsior Construction | $57,600 | |||||
| K-J Corporation | $65,000 | |||||
| R.A. Schultz & Co., Inc. | $73,487 | |||||
| 04-02-09 | 09062 | Replace HVAC Units, Selected Buildings, ISCI/SICI/IMSI, Department of Correction, Boise, Idaho | YMC, Inc. | $230,000 | 1. $30,000 2. $28,000 |
|
| Advanced Heating & Cooling | $213,074 | 1. $18,941 2. $15,542 |
||||
| Nu Mechanical *NON-RESPONSIVE* |
||||||
| Ridgeway Industrial | $189,868 | 1. $28,227 2. $19,169 |
05-08-09 | |||
| Treasure Valley Refrigeration | $223,424 | 1. $29,969 2. $29,876 |
||||
| Hobson Fabricating, Inc. | $249,000 | 1. $23,500 2. $23,000 |
||||
| RM Mechanical | $217,400 | 1. $18,825 2. $13,588 |
||||
| 03-26-09 | 06210.E BP 1 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 1 - Building Demoltion |
Ideal Demolition Services | $9,200 | 03-31-09 | |
| AAI | $9,269 | |||||
| Intermountain | $10,810 | |||||
| 03-26-09 | 06210.E BP 2 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 2 - Steel Fabrication & Erection |
Mountain Steel | $13,656 | 03-31-09 | |
| Titus | $32,950 | |||||
| 03-26-09 | 06210.E BP 3 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 3 - Architectural Millwork |
Bledsoe | $535 | 03-31-09 | |
| Joslin | $3,736 | |||||
| 03-26-09 | 06210.E BP 4 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 4 - Roofing |
Upson | $13,550 | 03-31-09 | |
| Modern | $25,675 | |||||
| 03-26-09 | 06210.E BP 5 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 5 - Doors, Frames & Hardware |
Architectural Building Supply | $3,220 | 03-31-09 | |
| Lloyd | $8,120 | |||||
| 03-26-09 | 06210.E BP 6 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 6 - Gypsum Board Assemblies |
ISI | $22,400 | 03-31-09 | |
| Lombac | $24,000 | |||||
| American Wall | $26,877 | |||||
| NW Interiors | $42,050 | |||||
| 03-26-09 | 06210.E BP 7 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 7 - Painting |
Eccles | $2,100 | ||
| Commercial | $2,432 | 06-09-09 | ||||
| Color Craft | $3,890 | |||||
| 03-26-09 | 06210.E BP 8 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 8 - Fire Sprinkler Systems |
Absolute Fire Protection | $3,213 | 03-31-09 | |
| TVFP | $8,866 | |||||
| Shilo | $12,296 | |||||
| JBL | $17,022 | |||||
| 03-26-09 | 06210.E BP 9 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 9 - Plumbing Systems |
Evans | $97,100 | 1. $ 2. $ 3. $ 4. $6,900 5. $ |
03-31-09 |
| Paige | $103,500 | 1. $ 2. $800 3. $ 4. $10,500 5. $800 |
||||
| DeBest | $111,704 | 1. $ 2. $1,250 3. $ 4. $6,842 5. $1,250 |
||||
| Drake | $115,000 | 1. $ 2. $857 3. $ 4. $10,500 5. $857 |
||||
| RM | $121,080 | 1. $ 2. $425 3. $ 4. $6,154 5. $425 |
||||
| Buss | $124,300 | 1. $ 2. $ 3. $ 4. $7,000 5. $ |
||||
| Gem State | $145,600 | 1. $ 2. $2,900 3. $ 4. $11,700 5. $2,900 |
||||
| 03-26-09 | 06210.E BP 10 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 10 - HVAC Systems |
Hobson | $393,699 | 1. $21,600 2. $4,570 3. $1,846 4. $ 5. $4,000 |
03-31-09 |
| Paige | $409,000 | 1. $19,000 2. $5,000 3. $3,000 4. $ 5. $4,000 |
||||
| YMC | $442,051 | 1. $19,930 2. $6,000 3. $585 4. $ 5. $5,250 |
||||
| 03-26-09 | 06210.E BP 11 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 11 - Electrical Systems |
Anderson Wood | $10,225 | 1. $5,510 2. $ 3. $ 4. $14,360 5. $ |
|
| Power Plus | $14,560 | 1. $4,860 2. $ 3. $ 4. $1,600 5. $ |
03-31-09 | |||
| Mountain Power | $18,650 | 1. $6,046 2. $ 3. $ 4. $1,378 5. $ |
||||
| Tri State | $19,380 | 1. $9,190 2. $ 3. $ 4. $1,630 5. $ |
||||
| NEI | $42,857 | 1. $4,986 2. $ 3. $ 4. $1,620 5. $ |
||||
| 03-26-09 | 06210.E BP 12 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 12 - Control Systems |
Johnson Controls | $59,346 | 1. $ 2. $645 3. $ 4. $1,365 5. $731 |
03-31-09 |
| 03-26-09 | 06210.E BP 13 | Area E HVAC Upgrades, Student Union Building Expansion, Boise State University, Boise Idaho Bid Package 13 - Chain Link Fence |
Cascade Fence | $1,186 | 03-31-09 | |
| Anvil Fence | $2,600 | |||||
| 03-26-09 | 08542 | Reclaim Old Dressing Room Area, Hot Pools, Lava Hot Springs Foundation, Lava Hot Springs, Idaho | CK Construction & Services Corp. | $385,000 | 1. $25,220 2. $104,141 |
|
| DeWall Construction | $319,900 | 1. $25,300 2. $104,300 |
||||
| Golis Construction | $422,396 | 1. $25,484 2. $76,884 |
||||
| Harris, Inc. | $319,000 | 1. $21,400 2. $60,000 |
04-14-09 | |||
| J&S Construction | $439,200 | 1. $28,000 2. $37,500 |
||||
| Ovard Construction | $413,336 | 1. $25,950 2. $88,610 |
||||
| Raymond Construction Co. | $384,023 | 1. $20,419 2. $59,823 |
||||
| SE/Z Construction | $388,015 | 1. $24,977 2. $76,037 |
||||
| Vern Clark & Sons Construction | $388,800 | 1. $20,700 2. $60,800 |
||||
| Wright Brothers Construction | $367,893 | 1. $21,140 2. $61,935 |
||||
| Heauiker Construction | $410,000 | 1. $19,218 2. $56,305 |
||||
| 03-24-09 | 09204 | Replace Two Elevators, Barnes Towers, Boise State University, Boise, Idaho | Ellsworth Kincaid Construction | $284,400 | ||
| Gafford Construction | $275,906 | 03-30-09 |
||||
| Alpine Construction | $289,450 | |||||
| K-J Corporation | $296,000 | |||||
| CSDI Construction | $298,600 | |||||
| Wright Brothers Construction | $283,535 | |||||
| 03-19-09 | 08180 | Automated Logic Controls Upgrade, Phase 1, Campuswide, North Idaho College, Coeur d'Alene, Idaho | 3H Mechanical | $281,990 | 1. $36,845 2. $20,989 3. $24,386 |
04-08-09 |
| Ramsey Plumbing & Heating | $324,740 | 1. $37,000 2. $20,800 3. $25,000 |
||||
| 03-17-09 | 09530 | Renovate HVAC, Phase 2, Education Building, JCC-STA, Department of Juvenile Corrections, St. Anthony, Idaho | All State Mechanical | $285,000 | ||
| B & S Boiler | $237,465 | |||||
| Intermech | $229,980 | |||||
| J & S Construction | $230,460 | |||||
| Mountain West Mechanical | $219,859 | 03-24-09 | ||||
| Rivers West Construction | $284,000 | |||||
| RM Mechanical | $228,000 | |||||
| Thurgood Mechanical | $299,950 | |||||
| 03-12-09 | 08162 | New Lighting, Harris Field, Lewis Clark State College, Lewiston, Idaho | QC Electric, Inc. | $383,000 | 1. -$5,000 | |
| M & M Harrison Electric | $344,500 | 1. $0 | 03-16-09 | |||
| Ginno Construction Company | $409,900 | 1. -$2,250 | ||||
| Twin City Electricians, Inc. | $448,000 | 1. -$446,500 | ||||
| 4 J Electric, Inc. | $459,672 | 1. -$65,462 | ||||
| 03-12-09 | 08095 | Lighting, Physical Education Building, College of Southern Idaho, Twin Falls, Idaho *NO BIDS RECIEVED* |
||||
| 03-05-09 | 08256 | Patch & Overlay, Nez Perce Drive, University of Idaho, Moscow, Idaho | Poe Asphalt Paving | $203,144.21 | 03-12-09 | |
| Germer Construction | $211,161.00 | |||||
| 03-05-09 | 08351 | Rebuild Main Air Handlers, LAB, Department of Health & Welfare, Boise, Idaho | ACCO Air Conditioning Co. | $181,241 | 1. $220,784 2. 14,651 |
|
| YMC, Inc. | $149,447 | 1. $187,983 2. 18,536 |
||||
| RM Mechanical, Inc. | $127,153 | 1. $198,475 2. $16,534 |
03-12-09 | |||
| Hobson Fabricating Corp. | $138,000 | 1. $203,000 2. $17,000 |
||||
| Paige Mechanical Group, Inc. | $244,000 | 1. $218,000 2. $21,000 |
||||
| Owyhee Sheet Metal | $177,850 | 1. $291,000 2. $14,455 |
||||
| Ridgeway Industrial *NON-RESPONSIVE* |
||||||
| 03-03-09 | 09531 | Renovate Gym/Life Safety Improvements, JCC-STA, Department of Juvenile Corrections, St. Anthony, Idaho | Barry Hayes Construction | $154,536 | 1. $6,128 2. $9,646 3. $18,934 |
|
| Harris, Inc. | $151,500 | 1. $9,300 2. $12,100 3. $19,500 |
||||
| Ovard Construction | $154,865 | 1. $6,333 2. $9,988 3. $19,605 |
||||
| J&S Construction | $141,700 | 1. $6,000 2. $9,500 3. $18,750 |
03-12-09 | |||
| Century Contractors | $168,881 | 1. $6,750 2. $11,238 3. $24,819 |
||||
| Vern Clark & Sons Construction | $153,900 | 1. $6,400 2. $10,000 3. $19,500 |
||||
| Shook Construction | $126,694 | 1. $10,665 2. $13,505 3. $46,510 |
||||
| Rivers West Construction | $199,300 | 1. $9,840 2. $12,450 3. $17,900 |
||||
| Bailey Construction | $186,000 | 1. $6,326 2. $9,977 3. $19,583 |
||||
| DeWall Construction | $181,000 | 1. $6,075 2. $9,600 3. $18,800 |
||||
| MBA General Contracting | $153,800 | 1. $7,400 2. $11,200 3. $22,450 |
||||
| SE/Z Construction | $153,780 | 1. $6,144 2. $8,643 3. $19,057 |
||||
| 02-24-09 | 09130 | VAV Boxes/Cable Tray, Christofferson Bldg #3, Eastern Idaho Technical College, Idaho Falls, Idaho | YMC | $247,315 | ||
| Rivers West Construction | $156,000 | |||||
| Hobson Fabricating | $166,000 | |||||
| Treasure Valley Refrigeration | $296,199 | |||||
| Heyrend Enterprises | $158,406 | |||||
| B & S Boiler | $139,152 | 03-13-09 | ||||
| 02-19-09 | 09133 | Replace Lighting Fixtures, Christofferson & Sessions, Eastern Idaho Technical College, Idaho Falls, Idaho | Anderson & Wood Construction | $226,780 | 1. $5,290 2. $31,350 3. $6,270 4. $11,060 5. $23,520 |
|
| Arvco | $224,200 | 1. $5,900 2. $21,000 3. $8,600 4. $10,900 5. $23,400 |
||||
| Vern Clark & Sons Construction | $218,296 | 1. $500 2. $23,445 3. $7,452 4. $7,452 5. $20,000 |
||||
| Double E Construction | $205,900 | 1. $1,000 2. $28,650 3. $7,900 4. $7,900 5. $20,000 |
||||
| Barry Hayes Construction | $206,466 | 1. $858 2. $24,311 3. $7,403 4. $7,403 5. $19,850 |
||||
| J&S Construction | $200,180 | 1. $600 2. $21,500 3. $7,500 4. $7,500 5. $19,700 |
||||
| Portneuf Electric | $273,072 | 1. $8,026 2. $26,789 3. $9,678 4. $12,060 5. $27,369 |
||||
| UnRicks | $222,590 | 1. $10,180 2. $28,830 3. $7,650 4. $9,100 5. $22,230 |
||||
| Skyview Electric | $224,000 | 1. $12,900 2. $17,900 3. $8,300 4. $9,500 5. $20,500 |
||||
| Rivers West Construction | $210,700 | 1. $1,010 2. $24,460 3. $7,000 4. $7,000 5. $18,770 |
||||
| Shook Construction | $207,104 | 1. $550 2. $26,434 3. $7,452 4. $7,452 5. $19,980 |
||||
| Wheeler Electric | $190,165 | 1. $3,900 2. $21,355 3. $4,750 4. $7,700 5. $20,270 |
03-18-09 | |||
| Young Electric | $249,787 | 1. $5,160 2. $27,490 3. $6,588 4. $11,961 5. $25,834 |
||||
| 02-19-09 | 08615 | Repair Asphalt/Sealcoat Parking Lot, VETL, Division of Veterans Services, Lewiston, Idaho ALL BIDS REJECTED |
Germer Construction | $33,473.31 | 1. $14,326 2. $6,620.20 3. $6,663.78 4. $3,445.65 |
|
| Herco Asphalt & Paving | $26,457.49 | 1. $8,086 2. $5,819.37 3. $5,532.87 4. $2,842.08 |
||||
| McCall's Classic Construction | $32,022.03 | 1. $12,038.50 2. $8,697.53 3. $7,290.02 4. $2,032.05 |
||||
| R.L. Young Paving | $34,968 | 1. $11,484 2. $5,791 3. $5,820 4. $2,640 |
||||
| Giese Paving & Excavation | $46,781.67 | 1. $14,250 2. $8,179 3. $7,290 4. $3,580 |
||||
| Poe Asphalt Paving | $34,391 | 1. $10,519 2. $7,253.40 3. $6,507 4. $2,139 |
||||
| 02-19-09 | 04203 | Center for Environmental Science & Economic Development, Boise State University, Boise, Idaho | Petra | $21,470,000 | 1. $5,183 2. $23,484 3. $256,241 4. $516,570 5. $333,985 Unit Price 1 $1.50 QA $1,500 Unit Price 2 $16.00 QA $1,600 Unit Price 3 $7.00 QA $7,000 |
|
| McAlvain Construction | $20,397,000 | 1. $5,291 2. $23,975 3. $267,770 4. $924,881 5. $320,966 Unit Price 1 $0.40 QA $400 Unit Price 2 $7.50 QA $7,500 Unit Price 3 $6.00 QA $6,000 |
||||
| Engineered Structures Inc | $18,599,000 | 1. $4,400 2. $24,900 3. $263,000 4. $829,000 5. $249,000 Unit Price 1 $0.95 QA $950 Unit Price 2 $10.00 QA $10,000 Unit Price 3 $7.00 QA $7,000 |
03-04-09 | |||
| Layton Construction | $21,253,600 | 1. $5,366 2. $24,316 3. $293,867 4. $963,494 5. $326,167 Unit Price 1 $0.75 QA $750 Unit Price 2 $10.00 QA $10,000 Unit Price 3 $7.00 QA $7,000 |
||||
| Kreizenbeck Constructors | $20,956,000 | 1. $5,400 2. $24,480 3. $261,700 4. $930,260 5. $307,000 Unit Price 1 $1.00 QA $1,000 Unit Price 2 $10.00 QA $10,000 Unit Price 3 $6.00 QA $6,000 |
||||
| Ormond Builders | $22,624,900 | 1. $5,493 2. $24,793 3. $303,056 4. $1,090,218 5. $338,259 Unit Price 1 $1.75 QA $1,750 Unit Price 2 $17.00 QA $17,000 Unit Price 3 $7.50 QA $7,500 |
||||
| CM Company | $21,629,000 | 1. $5,368 2. $24,326 3. $268,450 4. $924,300 5. $293,500 Unit Price 1 $2.50 QA $2,500 Unit Price 2 $15.00 QA $15,000 Unit Price 3 $13.00 QA $13,000 |
||||
| The Ewing Company | $20,990,000 | 1. $5,472 2. $24,794 3. $264,465 4. $972,369 5. $297,970 Unit Price 1 $1.00 QA $1,000 Unit Price 2 $13.00 QA $13,000 Unit Price 3 $14.00 QA $14,000 |
||||
| Sletten Construction | $21,450,000 | 1. $5,600 2. $25,200 3. $330,000 4. $988,000 5. $331,000 Unit Price 1 $1.50 QA $1,500 Unit Price 2 $15.00 QA $15,000 Unit Price 3 $10.00 QA $10,000 |
||||
| Steed Construction | $20,578,000 | 1. $5,400 2. $24,800 3. $266,000 4. $960,900 5. $336,500 Unit Price 1 $0.55 QA $550 Unit Price 2 $8.75 QA $8,750 Unit Price 3 $6.50 QA $6,500 |
||||
| Graham Construction & Management | $21,900,000 | 1. $5,400 2. $24,600 3. $274,200 4. $932,200 5. $324,700 Unit Price 1 $0.55 QA $550 Unit Price 2 $8.00 QA $8,000 Unit Price 3 $6.00 QA $6,000 |
||||
| 02-18-09 | 07350 REBID 2 | Install Fire Sprinkler System, LAB, Department of Health & Welfare, Boise, Idaho | Western States Fire Protection * NON-RESPONSIVE * |
|||
| Viking Auto Sprinkler Company | $241,000 | 1. $76,200 2. $27,800 3. $13,290 |
02-23-09 | |||
| Shilo Automatic Sprinkler, Inc. | $258,000 | 1. $85,700 2. $19,200 3. $12,775 |
||||
| Simplex Grinnell, LP * NON-RESPONSIVE * |
||||||
| 02-12-09 | 08255 | HVAC Upgrade, Gibb Hall, University of Idaho, Moscow, Idaho | Kenaston Corporation | $798,369 | 1. $99,000 2. $7,400 3. $29,960 4. $23,800 5. $96,410 6. $9,890 |
|
| Reiber Construction | $647,000 | 1. $82,000 2. $5,000 3. $26,000 4. $19,000 5. $85,000 6. $9,000 |
||||
| 3-H Mechanical | $595,600 | 1. $70,455 2. $7,205 3. $58,673 4. $24,400 5. $85,540 6. $9,453 |
02-25-09 | |||
| Hobson Fabricating | $664,000 | 1. $84,000 2. $105,000 3. $12,000 4. $8,000 5. $105,000 6. $10,000 |
||||
| RRACO | $736,800 | 1. $84,534 2. $4,787 3. $26,531 4. $22,948 5. $86,234 6. $9,186 |
||||
| 02-11-09 | 08500 | Repair/Expand Fire Cache Building, Coeur d’Alene Office, Department of Lands, Coeur d’Alene , Idaho | TML Construction | $232,777 | 1. $24,075 2. $7,819 3. $10,569 |
|
| CMEC, Inc. | $253,360 | 1. $31,190 2. $5,260 3. $2,940 |
||||
| James Elmer Construction | $279,800 | 1. $34,500 2. $7,250 3. $3,800 |
||||
| Beck Construction | $232,000 | 1. $27,070 2. $6,020 3. $7,846 |
||||
| Polin & Young Construction | $239,000 | 1. $28,855 2. $8,019 3. $4,090 |
||||
| Contractors Northwest, Inc. | $239,000 | 1. $33,400 2. $5,400 3. $10,000 |
||||
| Ginno Construction | $221,000 | 1. $22,877 2. $7,245 3. $4,110 |
02-18-09 | |||
| Small's Construction, Inc. | $270,000 | 1. $43,857 2. $7,805 3. $8,815 |
||||
| Shawn Cole Construction | $249,450 | 1. $32,500 2. $7,650 3. $6,200 |
||||
| DarDan, Inc. | $234,900 | 1. $27,900 2. $4,260 3. $600 |
||||
| Associated Construction | $246,045 | 1. $39,166 2. $5,594 3. $4,960 |
||||
| 02-10-09 | 08130 | Remodel Technical Bldg 2, Eastern Idaho Technical College, Idaho Falls, Idaho | Bailey Construction | $188,700 | 1. $235,996 2. $51,665 3. $10,627 4. $14,638 |
|
| Barry Hayes Construction | $147,174 | 1. $196,040 2. $33,305 3. $10,200 4. $14,000 |
||||
| Bateman Hall, Inc. | $155,700 | 1. $214,700 2. $35,000 3. $9,500 4. $13,000 |
||||
| D. L. Beck, Inc. | $148,387 | 1. $230,335 2. $41,718 3. $12,541 4. $16,799 |
||||
| DeWall Construction | $162,000 | 1. $229,000 2. $39,400 3. $9,580 4. $13,200 |
||||
| Double E Construction | $147,397 | 1. $214,658 2. $36,374 3. $10,639 4. $14,651 |
||||
| Harris, Inc. | $171,500 | 1. $215,000 2. $39,000 3. $9,700 4. $13,200 |
||||
| Headwaters | $199,000 | 1. $229,000 2. $53,000 3. $9,500 4. $13,400 |
||||
| J&S Construction | $186,300 | 1. $251,400 2. $49,800 3. $9,200 4. $14,400 |
||||
| Rivers West Construction | $172,000 | 1. $246,000 2. $36,000 3. $11,000 4. $15,000 |
||||
| SE/Z Construction | $160,665 | 1. $212,561 2. $31,785 3. $11,017 4. $16,476 |
||||
| Shook Construction | $141,155 | 1. $211,351 2. $36,910 3. $10,675 4. $14,687 |
||||
| Vern Clark & Sons Construction | $162,600 | 1. $168,800 2. $28,700 3. $9,600 4. $13,000 |
03-04-09 | |||
| 02-05-09 | 07195 | Information Technology Infrastructure, Generator, Micron Engineering Center; HVAC, Science/Nursing Building, Boise State University, Boise, Idaho | Park Center Plumbing * NON-RESPONSIVE * |
|||
| Excelsior Construction | $62,100 | |||||
| Hobson Fabricating | $71,000 | |||||
| Burns Construction | $65,047 | |||||
| Drake Mechanical | $83,881 | |||||
| RM Mechanical | $54,384 | 03-03-09 | ||||
| Alpine Construction | $59,890 | |||||
| 02-05-09 | 06063 | Test Well #3 Construction, ISCI, Department of Correction, Boise, Idaho | Treasure Valley Drilling & Pump | $112,165 | 02-17-09 | |
| 01-29-09 | 08501 | Remodel Fire Engine Bay to Office Space, Kootenai Area Office, Department of Lands, Bonners Ferry, Idaho | DarDan, Inc. | $291,475 | ||
| B.F. Builders | $239,500 | 02-10-09 | ||||
| Elmer Construction | $318,132 | |||||
| Shawn Cole Construction | $303,000 | |||||
| 01-27-09 | 08664 | Remodel Housing Office, Chaffee Hall, Boise State University, Boise, Idaho | Wright Brothers Construction | $238,661 | 1. $13,825 2. $9,830 3. $7,567 |
02-04-09 |
| Golis Construction | $246,400 | 1. $13,300 2. $15,800 3. $13,000 |
||||
| CSDI Construction | $274,300 | 1. $8,300 2. $15,400 3. $12,500 |
||||
| Ellsworth Kincaid Construction | $264,800 | 1. $7,266 2. $10,420 3. $8,100 |
||||
| Guho Construction | $279,000 | 1. $8,300 2. $14,800 3. $8,000 |
||||
| Perkins Construction | $251,000 | 1. $6,750 2. $11,750 3. $8,150 |
||||
| Burns Construction | $273,080 | 1. $12,663 2. $12,894 3. $9,080 |
||||
| Commercial Remodeling | $258,626 | 1. $12,651 2. $16,379 3. $13,001 |
||||
| CCMG, Inc. | $323,886 | 1. $19,000 2. $23,250 3. $8,400 |
||||
| Stock Construction Management | $250,000 | 1. $9,554 2. $19,649 3. $8,005 |
||||
| Gafford Construction | $265,428 | 1. $10,596 2. $19,760 3. $8,600 |
||||
| Ovard Construction * NON-RESPONSIVE * | ||||||
| KEPHA Construction | $200,205 | 1. $4,235 2. $13,401 3. $6,762 |
||||
| Alpine Construction | $249,480 | 1. $20,613 2. $11,128 3. $9,792 |
||||
| 01-22-09 | 08339 | Various Renovations, Readiness Center, Preston, Division of Military, Preston, Idaho | Bailey Construction | $238,651 | 1. $2,382 2. $17,685 3. $1,336 4. $1,509 |
|
| Barry Hayes Construction | $207,296 | 1. $2,101 2. $13,120 3. $1,765 4. $2,942 |
01-29-09 | |||
| Century Contractors | $256,844 | 1. $2,783 2. $21,729 3. $2,464 4. $1,795 |
||||
| Darrell W. Anderson Construction | $248,000 | 1. $2,500 2. $18,000 3. $1,400 4. $3,200 |
||||
| DeWall Construction | $226,800 | 1. $2,073 2. $21,200 3. $1,790 4. $3,200 |
||||
| Ovard Construction | $231,000 | 1. $2,400 2. $30,800 3. $1,830 4. $3,100 |
||||
| Raymond Construction | $225,223 | 1. $2,900 2. $19,300 3. $1,400 4. $2,800 |
||||
| Rivers West Construction | $257,400 | 1. $4,000 2. $28,500 3. $2,180 4. $3,532 |
||||
| SE/Z Construction | $242,249 | 1. $2,434 2. $20,419 3. $1,847 4. $3,163 |
||||
| Wright Brothers | $226,883 | 1. $2,211 2. $28,629 3. $2,307 4. $1,400 |
||||
| 01-20-09 | 07255-REBID | Life Safety Improvements, Art & Architecture South, University of Idaho, Moscow, Idaho | A & R Construction | $854,110 | 1. $15,889 2. $46,958 3. $62,345 4. $52,488 |
|
| Arnzen Building Construction | $987,889 | 1. $24,887 2. $54,133 3. $69,999 4. $47,096 |
||||
| Associated Construction * NON-RESPONSIVE * |
||||||
| Citadel Construction * NON-RESPONSIVE * |
||||||
| Golis Construction | $528,200 | 1. $23,800 2. $48,100 3. $42,500 4. $48,500 |
02-06-09 | |||
| Kenaston Corporation | $774,500 | 1. $41,800 2. $66,900 3. $41,500 4. $54,200 |
||||
| KOP Construction | $702,045 | 1. $22,881 2. $43,624 3. $39,694 4. $22,942 |
||||
| Leone & Keeble | $563,000 | 1. $15,450 2. $45,500 3. $52,500 4. $19,800 |
||||
| Panco Construction | $569,000 | 1. $8,766 2. $46,900 3. $28,700 4. $46,900 |
||||
| Reiber Construction *NON-RESPONSIVE* |
||||||
| Wright Brothers | $573,630 | 1. $16,231 2. $57,379 3. $43,513 4. $43,525 |
||||
| 01-15-09 | 09172 | Replace Chiller, Molstead Library, North Idaho College, Coeur d’Alene, Idaho | 3-H Mechanical | $104,980 | ||
| RM Mechanical | $125,800 | |||||
| Goebel Construction, Inc. | $94,973 | 01-28-09 | ||||
| 01-14-09 | 08442 | Facility Renovation, Ph. 2, Idaho Commission for the Blind and Visually Impaired (ICBVI), Boise, Idaho | Luekenga Construction | $412,244 | 1. $24,035 2. $24,823 3. $7,917 4. $12,619 5. $16,532 |
|
| CCMG, Inc. | $461,266 | 1. $17,422 2. $26,000 3. $8,200 4. $11,000 5. $12,500 |
||||
| Wright Brothers Construction | $348,821 | 1. $24,819 2. $19,843 3. $5,369 4. $8,992 5. $6,868 |
||||
| Alpine Construction | $424,753 | 1. $45,269 2. $29,442 3. $7,920 4. $14,840 5. $18,865 |
||||
| Gafford Construction | $356,618 | 1. $38,590 2. $22,579 3. $6,443 4. $10,502 5. $7,993 |
||||
| Ovard Construction | $412,800 | 1. $39,000 2. $21,940 3. $7,335 4. $10,280 5. $13,850 |
||||
| KEPHA Construction | $386,000 | 1. $36,765 2. $22,564 3. $5,858 4. $8,411 5. $7,418 |
||||
| Perkins Construction | $369,499 | 1. $24,850 2. $22,000 3. $7,950 4. $10,397 5. $12,000 |
||||
| Guho Construction | $374,000 | 1. $29,500 2. $22,500 3. $5,700 4. $10,900 5. $8,000 |
||||
| K-J Corporation | $382,000 | 1. $28,300 2. $27,900 3. $7,350 4. $10,500 5. $11,000 |
||||
| Stock Construction Management | $376,028 | 1. $14,339 2. $20,694 3. $6,399 4. $10,311 5. $11,085 |
||||
| Northwest Technologies | $535,450 | 1. $46,487 2. $27,728 3. $5,925 4. $13,251 5. $14,847 |
||||
| Excelsior Construction | $334,600 | 1. $30,900 2. $17,750 3. $6,675 4. $9,200 5. $7,450 |
02-04-09 | |||
| Ellsworth Kincaid Construction | $402,350 | 1. $28,760 2. $20,430 3. $7,800 4. $11,220 5. $8,150 |
||||
| 01-13-09 | 07202 | South Electrical Loop Expansion, Boise State University, Boise, Idaho | Track Utilities | $632,510 | 1. $119,747 2. $24,533 3. $64,273 |
|
| Power Plus | $556,174 | 1. $117,230 2. $31,655 3. $84,731 |
01-27-09 | |||
| Anderson & Wood Construction *BID RELIEF GRANTED* |
||||||
| Tuffy Excavation | $819,782 | 1. $104,364 2. $34,272 3. $80,112 |
||||
| Probst Electric *NON-RESPONSIVE* |
||||||
| Quality Electric | $709,134 | 1. $153,530 2. $56,225 3. $125,370 |
For more information regarding this page, please email Construction Management at 208.332.1900.