| Submission Date |
Project Number |
Project Name |
Contractor |
Base Bid |
Alternates |
Awarded |
| 12-28-06 | 07237 | Replace Chiller, Oboler Library, Idaho State University, Pocatello, Idaho | Bingham Mechanical | $225,000 | 1. $16,000 2. $8,100 |
|
| Economy Heating | $214,400 | 1. $14,910 2. $7,700 |
01-08-07 | |||
| 12-12-06 | 04206 BP27R | Audio Visual Systems, Interactive Learning Center, Boise State University, Boise, Idaho | Nimbus 360 | $908,169.60 | 10. $172,345.99 11. $174,582.66 12. $14,278.77 13. $14,278.77 14. $7,560 15. $8,527 16. $64,346.75 17. $21,639.64 |
03-02-07 |
| 10-26-06 | 04540 | Remodel Office/Shop, Winchester State Park, Winchester, Idaho | Arnzen Building Construction | $336,500 | 1. $52,625 2. $10,998 3. $11,595 4. $10,514 5a. $12,788 5b. $11,657 5c. $13,970 5d. $10,165 6. $1,867 7. $5,023 8. $520 |
|
| RRACO Inc | $419,212 | 1. $28,510 2. $9,690 3. $4,517 4. $11,875 5a. $13,827 5b. $10,208 5c. $13,098 5d. $7,350 6. $1,700 7. $4,756 8. $1,940 |
||||
| Wimer Corporation | $321,629 | 1. $39,337 2.$8,617 3. $7,326 4. $12,380 5a. $11,760 5b. $11,160 5c. $10,120 5d. $11,380 6. $3,438 7. $5,180 8. $1,580 |
12-11-2006 | |||
| 11-30-06 | 03351 | Replace Water/Gas/Vacuum Lines, LAB, Department of Health & Welfare, Boise, Idaho | Drake Mechanical | $123,763 | ||
| Ridgeway Industrial | $83,517 | 12-05-06 | ||||
| 11-28-06 | 07540 | Remodel Dressing Rooms, Olympic Pool, Lava Hot Springs Foundation, Lava Hot Springs, Idaho | DeWall Construction | $585,304 | 12-05-06 | |
| J&S Construction | $602,800 | |||||
| SE/Z Construction | $648,158 | |||||
| Rivers West Construction | $663,200 | |||||
| Vern Clark & Sons Construction | $594,620 | |||||
| Bailey Construction | $711,884 | |||||
| Harris Inc | $617,604 | |||||
| 11-28-06 | 06063A | Reconstruction/Testing,Water Supply Well #4-A, ISCI, Department of Correction, Boise, Idaho | McLearan Well Drilling | $99,895 | 12-05-06 | |
| George Post Well Drilling | $116,405 | |||||
| Treasure Valley Drilling & Pump | $110,900 | |||||
| 11-21-06 | 07010 | Replace Boiler, 954 Jefferson, Department of Administration, Boise, Idaho | Drake Mechanical | $122,256 | ||
| Drake Plumbing & Heating | $116,912 | |||||
| Ridgeway Industrial | $87,287 | 11-27-06 | ||||
| 11-16-06 | 07250 | Academic Suites, Teaching & Learning Center, University of Idaho, Moscow, Idaho | RRaco Inc. | $517,900 | 1. $49,647 | |
| Brown Construction | $567,000 | 1. $57,000 | ||||
| A&R Construction | $666,300 | 1. $64,000 | ||||
| Reiber Construction | $507,000 | 1. $41,000 | 11-22-06 | |||
| Contractors Northwest | $634,000 | 1. $52,000 | ||||
| KOP Construction | $537,730 | 1. $48,958 | ||||
| TW Clark Construction | $559,850 | 1. $45,400 | ||||
| 11-16-06 | 05068 | Remodel Main Facility, SAWC, Phase 2, Department of Correction, St. Anthony, Idaho | Larry Chapple Construction | $113,415 | ||
| Vern Clark & Sons Construction | $157,000 | |||||
| SE/Z Construction | $93,640 | 12-05-06 | ||||
| 11-16-06 | 06193 | Code Compliance Modifications, Education Building, Boise State University, Boise, Idaho | C-2 Construction | $114,780 | Unit Price: $30.58 1. $55,140 2. $38,698 |
11-27-06 |
| Perkins Construction | $131,500 | Unit Price: $32.00 1. $38,912 2. $54,444 |
||||
| Hobson Fabricating | $128,196 | Unit Price: $100.00 1. $61,030 2. $41,471 |
||||
| Excelsior Construction | $116,750 | Unit Price: $34.00 1. $55,200 2. $37,400 |
||||
| 11-15-06 | 07531 | Renovate Sawtooth Cottage, Juvenile Corrections Center, St. Anthony DJC, St. Anthony, Idaho | SE/Z Construction | $194,524 | ||
| J&S Construction | $163,000 | 11-27-06 | ||||
| K&A Construction | $221,300 | |||||
| Rivers West Construction | $221,000 | |||||
| Vern Clark & Sons | $188,369 | |||||
| 11-7-06 | 07132 | HVAC Improvements, Kitchen, Christofferson Building #3, Eastern Idaho Technical College, Idaho Falls, Idaho | Rivers West Construction | $116,600 | 1: $11,600 | 11-13-06 |
| 10-31-06 | 07837 and 07838 |
Electrical Service Contract, Department of Administration | Electric Authority | $215,000 | ||
| Quality Electric | $189,900 | |||||
| 10-31-06 | 07843 and 07844 |
Plumbing Service Contract, Department of Administration | RM Mechanical | $184,300 | ||
| Idaho Pump & Plumbing | $212,875 | |||||
| Ridgeway Industrial | $352,050 | |||||
| 10-31-06 | 07841 and 07842 |
HVAC Service Contract Project, Department of Administration | RM Mechanical | $205,500 | ||
| Trane | $381,725 | |||||
| HVAC Controls & Specialties | $237,100 | |||||
| 10-31-06 | 07837 and 07838 |
Electrical Service Contract, Department of Administration | Electric Authority | $215,000 | ||
| Quality Electric | $189,900 | |||||
| 10-31-06 | 07843 and 07844 |
Plumbing Service Contract, Department of Administration | RM Mechanical | $184,300 | ||
| Idaho Pump & Plumbing | $212,875 | |||||
| Ridgeway Industrial | $352,050 | |||||
| 10-31-06 | 07841 and 07842 |
HVAC Service Contract Project, Department of Administration | RM Mechanical | $205,500 | ||
| Trane | $381,725 | |||||
| HVAC Controls & Specialties | $237,100 | |||||
| 10-24-06 | 01194A | West Campus Site Drainage Repair, Boise State University, Nampa, Idaho | TJ Odiaga Inc | $36,540 | 10-26-06 | |
| Paul Construction | $43,000 | |||||
| 10-19-06 | 07835 and 07836 |
Light Construction Service Contract | Hellman Construction | $214,575 | ||
| Alpine Construction | $167,900 | |||||
| Northwest Interiors | $166,200 | |||||
| PacWest Interiors | $173,950 | |||||
| 10-19-06 | 06380 | Repair Patient Showers, Remodel Non-Patient Rooms, SHN, Department of Health & Welfare, Orofino, Idaho | Arnzen Building Construction | $466,254 | 1. $82,943 2. $97,574 3. $111,719 4. $85,494 5. $79,462 |
|
| Riverview Construction | $326,394 | 1. $61,431.30 2. $75,439.90 3. $91,105.90 4. $63,510 5. $52,060 |
10-25-06 | |||
| 10-10-06 | 07231 | Repair Exterior Walls, Frazier Hall, Idaho State University, Pocatello, Idaho | C-2 Construction | $63,000 | 1. $23,688 | |
| Rivers West Construction | $56,000 | 1. $23,000 | ||||
| Vern Clark & Sons | $50,500 | 1. 18,365 | 10-13-06 | |||
| 10-4-06 | 07512 | Install Generator & UPS Units, Idaho State Police, Meridian, Idaho * ALL BIDS REJECTED * |
Tri-State Electric | $364,038 | N/A | |
| Challenger Companies | $347,833 | N/A | ||||
| 9-26-06 | 05241 | Frazier Hall Third Floor Renovation, ISU, Pocatello, Idaho | Rivers West Construction | $231,000 | ||
| J&S Construction | $187,900 | |||||
| SE/Z Construction | $182,911 | |||||
| Vern Clark & Sons Construction | $176,900 | 10-10-06 | ||||
| C-2 Construction | $201,418 | |||||
| 9-21-06 | 06011 | Fire Monitoring System, Len B. Jordan Building, Department of Administration, Boise, Idaho | Quality Electric | $438,818 | ||
| Allied General Fire & Security | $177,489 | 9-27-06 | ||||
| Explorer Technologies Non-Responsive |
$212,217 | |||||
| Alarmco | $246,000 | |||||
| 9-21-06 | 06011 | Fire Monitoring System, Len B. Jordan Building, Department of Administration, Boise, Idaho | Quality Electric | $438,818 | ||
| Allied General Fire & Security | $177,489 | 9-27-06 | ||||
| Explorer Technologies Non-Responsive |
$212,217 | |||||
| Alarmco | $246,000 | |||||
| 9-27-06 | 07256 | Demolition 840 University Ave, University of Idaho, Moscow, Idaho | Ace Elliott | $29,307 | 10-4-06 | |
| Motley-Motley | $32,900 | |||||
| 9-26-06 | 05241 | Frazier Hall Third Floor Renovation, ISU, Pocatello, Idaho | Rivers West Construction | $231,000 | ||
| J&S Construction | $187,900 | |||||
| SE/Z Construction | $182,911 | |||||
| Vern Clark & Sons Construction | $176,900 | 10-10-06 | ||||
| C-2 Construction | $201,418 | |||||
| 9-19-06 | 06152 | Rebid Upgrade Irrigation Water System, Lewis Clark State College, Lewiston, Idaho | Living Waters | $327,000 | 1. $10,000 2. $9,115 3. $10,150 4. $-17,000 |
10-2-06 |
| 9-18-06 | 07226 | Repair Refractory and Conveyor System, Boiler #2, Phase 2, Idaho State University, Pocatello, Idaho | Lewis Corporation | $33,650 | 9-25-06 | |
| Superior Boiler | $50,765 | |||||
| 8-24-06 | 06233 | Mechanical System Upgrage, Phase 3, CHE Building, University Place, Idaho Falls, Idaho | Thurgood Mechanical | $237,500 |
$79,625 |
|
| B & S Boiler | $258,834 |
$89,477 | 9-19-06 | |||
| 8-17-06 | 05504 | Office Addition/Re-Pave Parking Lot Dept. of Lands, McCall, Idaho | Valley Paving |
$101,750 |
N/A |
8-30-06 |
| 8-15-06 | 07090 | Replace Roof, Burley Center, College of Southern Idaho, Burley, Idaho *RE-BID* | Wilson Roofing |
$65,200 |
9-27-06 | |
| 8-8-06 | 01222 | ISU Multi-Use Complex, Pocatello, ID -Bid Package #38 Site Concrete Walks, Walls, Ramps, Stairs and Railings *NO BIDS RECIEVED |
||||
| 8-8-06 | 01222 | ISU Multi-Use Complex, Pocatello, ID -Bid Package #39 - Asphalt Paving and Curbs/Gutters | JB Parsons |
$10,500 |
8-11-06 | |
| 8-8-06 | 01222 | ISU Multi-Use Complex, Pocatello, ID -Bid Package #40 - Landscaping | Angle & Associates |
$84,823 |
8-11-06 | |
All American Yards |
$101,200 |
|||||
| 8-8-06 | 01222 | ISU Multi-Use Complex, Pocatello, ID -Bid Package #41 - Kitchenetts - Casework | Johnson Brothers | $199,365 | ||
| Snake River Case and Mill | $138,539 | 8-11-06 | ||||
| 8-8-06 | 01222 | ISU Multi-Use Complex, Pocatello, ID -Bid Package #42 - Data Cabling and Racks | Systems Tech |
$408,000 |
3. $62,000 |
8-11-06 |
| 8-8-06 | 01222 | ISU Multi-Use Complex, Pocatello, ID -Bid Package #43 - Concrete Floor Finish | Western States Waterproof |
$121,551 |
4. $ 5,264 |
|
| 8-8-06 | 06361 | Repair/Sealcoat, Parking/Roadways, ISSH, Department of Health and Welfare, Nampa, Idaho | Curtis Clean Sweep |
$188,394.28 |
$1,814.76 |
8-23-06 |
| 8-1-06 | 07226 | Repair Refractory and Conveyor System, Boiler #2, Idaho State University, Pocatello, Idaho | Superior Boiler |
$69,178 |
08-24-06 | |
| 7-19-06 | 06224 | Campus Fire Alarm Renovation, Idaho State University, Pocatello, Idaho | Mountain West Electrical |
$383,800 |
1 $ 84,800 2 $ 76,800 3 $ 34,400 4 $ 39,800 5 $ 62,300 6 $ 89,600 7 $ 4,800 |
8-07-06 |
Portneuf Electrical |
$551,626 |
1 $144,997 2 $129,000 3 $ 64,402 4 $ 40,477 5 $ 79,820 6 $134,977 7 $ 21,029 |
||||
War Bonnet Electrical |
$443,000 |
1 $ 121,000 2 $ 102,000 3 $ 49,000 4 $ 49,400 5 $ 69,500 6 $ 114,000 7 $ 6,000 |
||||
| 7-19-06 | 07091 | Replace Roof, Scotts Classroom Bldg, College of Southern Idaho, Twin Falls, Idaho | Wilson Roofing | $58,691 | ||
| Roman Roofs | $63,416 | |||||
| Quality Tile Roofing | $69,533 | |||||
| Robison Roofing | $51,460 | |||||
| Upson Company | $47,980 | 7-31-06 | ||||
| Pro-Tech Roofing | $66,741 | |||||
| 7-19-06 | 07090 | Replace Roof, Burley Center, College of Southern Idaho, Burley, Idaho ALL BIDS REJECTED |
Wilson Roofing | $65,993 |
|
|
| Robison Roofing | $52,400 | |||||
| Quality Tile Roofing | $92,853 | |||||
| Upson Company | $80,145 | |||||
| Pro-Tech Roofing | $74,279 | |||||
| 7-6-06 | 06152 | Upgrade Irrigation Water System, Lewis-Clark State College, Lewiston, Idaho NO BIDS RECIEVED |
||||
| 7-6-06 | 06532 | Cooling System, Administration Building, JCC-STA, Department of Juvenile Corrections, St. Anthony, Idaho | Heyrend Enterprises | $64,835 | 7-31-06 | |
| B & S Boiler | $82,300 | |||||
| Commercial Metal Works | $73,300 | |||||
| 6-30-06 | 06601 | Extend Physical Therapy Rooms 108 & 109, VETP, Division of Veterans Services, Pocatello, Idaho | C-2 Construction | $265,507 | 1: $9,214 | |
| Rivers West Construction | $264,000 | 1: $11,000 | ||||
| Vern Clark & Sons | $231,500 | 1: $11,500 | 7-25-06 | |||
| 6-27-06 | 02261B | Teaching & Learning Center, Classrooms 050 & 051, University of Idaho, Moscow, Idaho | Kenaston Corp. | $239,500 | ||
| Associated Const. | $239,073 | |||||
| KOP | $231,000 | 08-25-06 |
||||
| 6-27-06 | 06217 | Remodel Chaffee Hall "B" Wing, Boise State University, Boise, Idaho | C-2 Construction | $464,001 | 6-30-06 | |
| 6-27-06 | 01082 | Miscellaneous Drainage Site Work, Idaho History Center, Idaho State Historical Society, Boise, Idaho | Ruschman Sand & Gravel | $74,745 | 1. $-5,750 | 7-6-06 |
| 6-27-06 | 07190 | Partial Reroof, Library Bldg., Boise State University, Boise, Idaho | Modern Roofing | $116,899 | 1. $16,000 | 7-12-06 |
| 2. $115,920 | ||||||
| Pro Tech Roofing | $153,703 | 1. $30,718 | ||||
| 2. $148,356 | ||||||
| 6-22-06 | 06151 | Smoke Filtration System, Welding Lab, Lewis Clark State College, Lewiston , Idaho | Hobson Fabricating | $262,945 | 6-26-06 | |
| 4-J Electric | $263,000 | |||||
| Kenaston | $318,074 | |||||
| 6-20-06 | 06217 | Chaffe Hall Remodel Carpet Replacement, Boise State University, Boise, Idaho | Great Floors | $72,947 | 1. $5,000 | 7-14-06 |
| Designer Floors | $67,700 | 1. $7,000 | ||||
| 6-20-06 | 06213 | Remodel Former Shari's Restaurant, Capitol Village, BSU, Boise, Idaho | C-2 Construction | $444,440 | 1. $24,054 | |
| 2. $3,751 | ||||||
| Perkins Construction | $467,546 | 1. $22,627.78 | ||||
| 2. $36,520 | ||||||
| Gafford Construction | $442,316 | 1. $26,727 | 6-30-06 | |||
| 2. $4,684 | ||||||
| CCMG | $470,936 | 1. $25,691 | ||||
| 2. $1,373 | ||||||
| 6-20-06 | 06218 | Resurface Running Track, Bronco Stadium, Boise State University, Boise Idaho | Athletic Poly mer Systems | $286,500 | ||
| Benyon Sports Surface | $208,000 | 6-27-06 | ||||
| Atlas Track & Tennis | $241,808 | |||||
| 6-15-06 | 06602 | Air Conditioning Modifications, VETP, Division of Veterans Services, Pocatello, Idaho | Economy Heating | $26,721 | ||
| 6-13-06 | 07220 | Replace Roof, Physical Science Bldg., Idaho State University, Pocatello | Modern Roofing | $95,118 | ||
| Smith Roofing | $89,349 | 6-16-06 | ||||
| Robison Roofing | $90,000 | |||||
| Wilson Roofing | $100,109 | |||||
| 6-6-06 | 06211 | TEM Lab Remodel, Micron Engineering Center, BSU, Boise, Idaho | Hobson Fabricating | $318, 101 | 6-19-06 | |
| Gafford Construction | $336,043 | |||||
| SE/Z Construction | $424,770 | |||||
| C-2 Construction | $349,784 | |||||
| 6-1-06 | 05064 * Rebid * |
Refurbish Showers, A Block, ICIO, Department of Correction, Orofino, Idaho | Wimer Conporation | $98,510 | 6-26-06 | |
| 6-1-06 | 06650 | Facility Renovation, Commission for the Blind/Visually Impaired, Boise, Idaho | Guho Corp. | $3,879,544 | 1: $295,783
2: $-77,961 |
8-17-06 |
| 5-31-06 | 06194 | Information Technology Infrastructure, Phase II, Boise State University, Boise, Idaho | C-2 Construction | $270,860 | 1: $132,740 2: $136,448 3: $72,097 4: $113,225 5: $103,833 |
6-26-06 |
| 5-24-06 | 06541 | ADA Campsite/Restroom Upgrades, Lake Cascade, Parks & Rec. | Gafford Construction | $335,876 | 1. $58,019 2. $24,713 3. $12,583 |
|
| Brice Construction | $123,860 | 1. $26,400 2. $13,800 3. $8,700 |
||||
| CCMG | $132,561 | 1. $18,894 2. $9,303 3. $6,610 |
5-25-06 | |||
| 5-24-06 | 05013 | Elevator Refurbishment, JRW Bldg., Dept. of Admin., Boise, Idaho | Schindler Elevator | $587,968 | 1: $44,180 2: $23,820 3: $56,000 4: $56,400 |
|
| K-J Corporation | $631,300 | 1: $23,500 2: $23,400 3: $25,700 4: $22,800 |
6-8-06 | |||
| Golis Construction | $664,682 | 1: $25,706 2: $25,560 3: $29,047 4: $24,944 |
||||
| 5-23-06 | 05222 | Repair Exterior Walls, Eli Oboler Library, Idaho State University, Pocatello, Idaho | Rivers West Construction | $590,500 | ||
| C-2 Construction | $624,837 | |||||
| DeWall Construction | $578,500 | |||||
| SE/Z Construction | $541,368 | 6-16-06 | ||||
| 5-16-06 | 06197 | HVAC Upgrade, Kinesiology Building, Boise State University, Boise, Idaho | Hobson Fabricating | $148,299 | 6-13-06 | |
| 5-11-06 | 05068 | Remodel Main Facility, SAWC, Department of Correction, St. Anthony, Idaho | Larry Chapple Co. | $299,000 | 1: $9,000 2: $40,000 |
5-26-06 |
| Thompson Construction | $390,300 | 1: $32,800 2: $109,600 |
||||
| 5-10-06 | 02134 | Maintenance Building Expansion, Eastern Idaho Technical College, Idaho Falls, Idaho | J & S Construction | $356,600 | 5-25-06 | |
| Vern Clark & Sons | $371,900 | |||||
| McAlvain Constr. | $357,000 | |||||
| C-2 Construction | $424,370 | |||||
| 5-9-06 | 06501 | Addition, East Idaho Area Office, Dept. of Lands, Idaho Falls, Idaho | J & S Construction Co. | $196,580 | 1. $750 |
|
| K & A Construction Co. | $204,000 | 1. $2,500 2. $17,800 3. $9,020 4. $5,250 |
||||
| Vern Clark & Sons | $185,788 | 1. $1,000 2. $16,500 3. $10,900 4. $5,500 |
||||
| Shook Construction | $181,179 | 1. $989 2. $15,566 3. $9,555 4. $4,290 |
6-8-06 | |||
| 5-4-06 | 05064 | Refurbish Showers, A Block, ICIO, Department of Corrections, Orofino, Idaho | NO BIDS RECEIVED | |||
| 5-4-06 | 03070 | Rebid Repair/Replace Water Tank, ISCI, Department of Correction, Boise, Idaho | Pittsburg Tank & Tower | $71,000 | 5-22-06 | |
| Sletten Construction | $276,000 | |||||
| 5-4-06 | 06207 | Block 6 Demolition, Boise State University, Boise, Idaho | Eagle Rock Timber | $360,968 | ||
| C & C Salvage and Demolition | $151,265 | |||||
| C-2 Construction | $99,930 | |||||
| Northwest Technologies | $153,522 | |||||
| Magnum Demolition | $77,126 | 5-24-06 | ||||
| 4-27-06 | 06400 | Lights to Emergency Power, Patient Bathrooms, SHS, Department of Health and Welfare, Blackfoot, Idaho | Idaho Electric | $25,300 | ||
| Nash Electric | $19,100 | 5-16-06 | ||||
| Arco Electric | $45,911 | |||||
| Lou Ricks Electric | $20,252 | |||||
| 4-26-06 | 05219 | Geology Research Lab, Math/Geosciences Building, Boise State University, Boise, Idaho | C-2 Construction | $418,426 | 1: $69,742
2: $20,040
3: $16,331
4: $6,694 |
|
| K-J Corporation | $389,100 | 1: $68,500
2: $16,400
3: $8,200
4: $6,660 |
||||
| Perkins Construction | $387,665 | 1: $49,721
2: $16,517
3: $7,958
4: $6,400 |
||||
| Luekenga Construction | $383,516 | 1: $69,205
2: $14,905
3: $9,569
4: $5,760 |
||||
| Excelsior Construction | $367,300 | 1: $59,900
2: $15,200
3: $7,900
4: $5,900 |
5-4-06 | |||
| 4-26-06 | 06229 | Auditorium Renovation College of Education, ISU, Pocatello, Idaho | J&S Construction | $266,100 | ||
| Rivers West Construction | $236,000 | |||||
| CCMG Inc. | $230,094 | |||||
| DeWall Construction | $221,700 | |||||
| C-2 Construction | $212,165 | 5-5-06 | ||||
| 4-25-06 | 04221 | Remove PCBs, Reed Gym, Phase II, Idaho State University, Pocatello, Idaho | PSC | $146,000 | 5-1-06 | |
| 4-25-06 | 06133 | Renovate Four Lecture Halls, Creek Bldg. #5, EITC, Idaho Falls Idaho | J & S Construction Company | $195,275 | 1: $7,500 | |
| K & A Construction Co. | $220,000 | 1: $7,200 | ||||
| Rivers West Construction | $178,000 | 1: $7,240 | 5-5-06 | |||
| Vern Clark & Sons Construction | $179,600 | 1: $7,500 | ||||
| 4-19-06 | 06351 | Parking Lot Repairs, Region VI & VII, Departments of Health and Welfare, Pocatello, Blackfoot & Idaho Falls, Idaho | Curtis Clean Sweep | $35,653.62 | 1:$4,948.16 2:$40,982 3:$17,756 |
|
| Imperial Asphalt | $32,400 | 1: $5,117 2: $20,402 3: $2,418 |
||||
| Klingler Asphalt Maintenance | $22,431 | 1: $4,977 2: $14,847 3: $1,503 |
5-8-06 | |||
| 4-14-06 | 04351 | Standby Generators, Phase II, Direct Digital Controls, Bureau of Laboratories, Department of Health and Welfare, Boise, Idaho | ATS Inland NW | $185,540 | 6-26-06 |
|
| 4-6-06 | 02260 | Life Safety Upgrade, Phase II, Brink/Phinney Hall, University of Idaho, Moscow, Idaho | Associated Construction | $331,946 | 1: $65,597 2: $26,976 3: $4,603 4: $59,846 |
4-12-06 |
| 3-21-06 | 05600 | Remodel North Area, VETL, Division of Veterans Services, Lewiston, Idaho | S & W Construction Teel Construction |
$98,429 $90,787 |
3-31-06 |
|
| 3-16-06 | 06060 | Reroof Medical Building/Housing Units 8 and 9, ISCI, Boise, Idaho | Quality Tile | $261,029 | 1: $11,803 2: $11,803 3: $55,305 4: $83,547 5: $-6,000 6: $-2,000 7: $-1,500 |
3-20-06 |
| Upson Company | $282,240 | 1: $10,520 2: $10,520 3: $74,450 4: $88,970 5: $-12,700 6: $-6,500 7: $-4,900 |
||||
| Hobson Fabircation | $264,140 | 1: $20,388 2: $20,388 3: $50,930 4: $82,188 5: $-5,750 6: $-8,051 7: $-2,300 |
||||
| Pro Tech | $375,500 | 1: $19,275 2: $19,275 3: $74,527 4: $85,424 5: $-1,500 6: $-1,500 7: $-1,500 |
||||
| Madison Roofing | $272,678 | 1: $19,250 2: $19,250 3: 109,000 4: 122,000 5: $-3,600 6: $-3,600 7: $-3,600 |
||||
| 3-13-06 | 06234 | Renovate HVAC System, Phase II, Rooftop Unit, RFC Building, Idaho State University, Pocatello, Idaho | Economy Heating | $14,700 | ||
| Lewis Corporation | $15,000 | 3-30-06 | ||||
| B & S Boiler | $18,250 | |||||
| Vogts Heating & Air | $16,900 | |||||
| Johnson Controls | $9,192 | |||||
| 4-12-06 | 05225 | Repair Steam Tunnel, Near Fine Arts Bldg., ISU, Pocatello, Idaho | Rivers West Construction | $ 395,400 | 1: $19,700
2: $ 9,450 |
4-14-06 |
| SE/Z | $418,667 | 1: $20,459 2: $29,227 |
|
|||
| 4-12-06 | 06111 | Replace Walk-in Freezer/Coolers, Idaho State School for the Deaf & the Blind, Gooding, Idaho | Sawtooth Sheet Metal | $69,535 |
|
4-28-06 |
| 4-12-06 | 06542 | Rebid, 25-Yard Pool Enclosure, Lava Hot Springs Foundation, Lava Hot Springs, Idaho | Baily Construction | $394,730 | 1: $90,555 2: $11,651 |
|
| C-2 Construction | $339,680 | 1: $93,509 2: $12,119 |
||||
| DeWall Construction | $314,200 | 1: $90,100 2: $11,600 |
4-19-06 | |||
| MW Construction | $343,700 | 1: $91,316 2: $11,749 |
||||
| Rivers West Construction | $351,700 | 1: $92,000 2: $13,880 |
||||
| SE/Z Construction | $391,121 | 1: $95,568 2: $12,157 |
||||
| 4-5-06 | 05214 | Rebid West Campus Parking Lots, Boise State University, Nampa, Idaho ALL BIDS REJECTED - PROJECT CANCELLED |
King Excavation | $426,500 | 1: $18,700 2: $12,500 |
|
| Idaho Sand & Gravel | $601,000 | 1: $24,000 2: $20,000 |
||||
| Paul Construction | $494,179 | 1: $45,335 2: $19,600 |
||||
| C-2 Construction Inc. | $419,399 | 1: $36,468 2: $36,040 |
||||
| 4-4-06 | 05331 | Renovate Grangeville Armory, Phase II, Division of Military, Grangeville, Idaho | Citadel Construction | $349,075 | 1: $20,695 2: $11,190 3: $86,145 |
|
| Idaho Stage, LLC | $379,350 | 1: $27,357 2: $10,007 3: $74,040 |
||||
| S & W Construction | $314,012 | 1: $29,750 2: $11,390 3: 120,278 |
4-27-06 | |||
| 3-30-06 | 04206 | Interactive Learning Center, Phase II, Boise State University, Boise, Idaho
Bid Package 25R2 |
Stafford-Smith, Inc. | $415,726 | ||
| Spokane Restaurant Equipment Company | $499,972 | 4-19-06 | ||||
| Gill Marketing | $530,956 | |||||
| Great Lakes Hotel Supply Company | $503,436 | |||||
| Smith & Greene | $509,000 | |||||
| Bargeene/Ellingson | $572,000 | |||||
| 3-28-06 | 06190 | Reroof Morrison Center, Phase II, Boise State University, Boise Idaho | Upson Company | $165,450 | 1: $18,900 | |
| Quality Tile Roofing | $237,353 | 1: $11,500 | ||||
| Pro-Tech Roofing | $154,768 | 1: $17,734 | ||||
| Hobson Fabricating | $134,556 | 1: $ 9,295 | 4-3-06 | |||
| 3-23-06 | 06091 | Gas Heat Retrofit and Lighting Upgrade, Expo Building, College of Southern Idaho, Twin Falls, Idaho | Hobson Fabricating | $273,000 | 1: $6,090
2: $3,150 |
|
| Wheeler Electric | $238,560 | 1: $11,120
2: $3,340 |
||||
| Portneuf Electric | $244,409 | 1: $7,932 2: $4,457 |
||||
| Sawtooth Sheet Metal | $235,749 | 1: $6,936 2: $3,458 |
4-20-06 | |||
| 3-8-06 | 06090 | Rebid HVAC Conversion, Shields Building, College of Southern Idaho, Twin Falls, Idaho | R & M | $200,200 | 1: $7,000 2: $9,500 3: $8,800 4: $9,800 |
|
| Cloverdale | $179,323 | 1: $5,486 2: $6,476 3: $5,596 4: $6,717 |
3-14-06 | |||
| RSCI | $198,146 | 1: $3,634 2: $5,564 3: $5,372 4: $6,449 |
||||
| 3-8-06 | 06531 | HVAC Renovation, Owyhee Cottage, JCC-STA, Department of Juvenile Corrections, St. Anthony, Idaho | B & S Boiler | $85,651 | 3-14-06 | |
| 2-28-06 | 05170 | Mechanical Upgrade, Sherman Administration Building, North Idaho College, Coeur d'Alene, Idaho | CNI | $503,000 | ||
| NW Construction | $492,713 | 3-8-06 | ||||
| 2-28-06 | 04206 | Interactive Learning Center, Bid Package 25R - Food Service Equipment, Phase II, Boise State University, Boise, Idaho ALL BIDS REJECTED |
Bargreen/Ellingson | $572,000 | ||
| Gill Group | $522,950 | |||||
| Spokane Restaraunt Supply | $514,889 | |||||
| Smith & Green | $525,000 | |||||
| 2-23-06 | 06257 | Reroof Hartung Theater, University of Idaho, Moscow, Idaho | Missoula Sheet Metal | $259,463 | 1: $-99,000 | |
| Arrow Roofing & Sheet Metal | $192,500 | 1: $-55,500 | 3-16-06 | |||
| Cobra | $250,421 | 1: $-96,820 | ||||
| Kruger Sheet Metal | $199,530 | NA | ||||
| Icon Corporation | $400,000 | 1: $234,800 | ||||
| 2-14-06 (gs) | 05132 | ADA Restroom Improvements, Tech Bldg., Eastern Idaho Technical College, Idaho Falls, Idaho | RE Beck Construction | $58,658 | ||
| Eagle Rock Timber, Inc. | $58,349 | |||||
| Rivers West Construction | $58,370 | |||||
| Vern Clark & Sons Construction | $57,582 | |||||
| J & S Construction | $47,890 | |||||
| Larry Chapple Co. | $58,470 | |||||
| C-2 Construction | $60,205 | 3-8-06 | ||||
| 1-31-06 | 99362 | Therapy Pool/Pool House Repair/Addition, ISSH, Nampa, Idaho ALL BIDS REJECTED | Guho Corporation | $306,981 | 1: $24,645 2: $23,949 |
|
| Golis Construction | $321,473 | 1:$48,830 2: $23,785 |
||||
| Kepha Construction | $348,340 | 1: $52,257 2: $21,636 |
||||
| Excelsior Construction | $336,000 | 1: $46,000 2: $20,650 |
||||
| 1-31-06 | 06090 | HVAC Conversion, Shields Building, CSI, Twin Falls, Idaho
ALL BIDS REJECTED |
RM Mechanical, Inc. | $200,800 | 1: $7,800 |
|
| 1-26-06 | 04082 | Rebid Rock Creek Interpretive Center, ISHS, Hansen, Idaho | Stanley Associates | $208,700 | 1: $12,950 | |
| Gary D. Jones | $173,500 | 1: $13,136 | 2-1-06 |
|||
| Starr Corporation | $203,573 | 1: $14,323 | ||||
| Eagle Rock Timber | $190,051 | 1: $11,426 | ||||
| 1-26-06 | 05227 | Rebid Install New Water Line, Barton Road/Bartz Field, ISU, Pocatello, Idaho | Accelerated Paving | $125,831.88 | 1: $39,833.94 | 2-9-06 |
| JB Parson Co. | $132,900 | 1: $59,000 | ||||
| Eagle Rock Timber | $207,563 | 1: $50,710 | ||||
| 1-12-06 (gs) | Asbestos Abatement Service Contract, North Region | Summit Environmental |
$19,151.80 | |||
| IRS Environmental of Washington | $18,290.24 | 2-22-06 | ||||
| 1-12-06 (gs) | Asbestos Abatement Service Contract, Southeast Region | Idaho Abatement | $15,986 | 2-22-06 | ||
| 1-12-06 (gs) | Asbestos Abatement Service Contract , Southwest Region | IRS Environmental of Washington | $22,021.44 | |||
| Pacific Technologies | $16,980 | |||||
| Intermountain Construction & Abatement | $16,784 | 2-22-06 | ||||
| Northwest Technologies | $16,496 | 2-22-06 | ||||
| 1-5-06 (gs) | 04351 | Rebid, Standby Generators, Bureau of Laboratories, Dept. of Health & Welfare, Boise, Idaho | Apex Enterprises | $536,500 | ||
| Romar Electric | $604,553.76 | |||||
| Electric Service & Contracting | $617,439 | |||||
| Anderson & Wood | $589,887 | |||||
| Guho Corp. | $537,000 | |||||
| Ellsworth Kincaid | $514,309 | 1-9-06 | ||||
| 1-4-06 (gs) | 05093 | Fine Arts HVAC Retrofit, College of Southern Idaho, Twin Falls, Idaho | Sawtooth Sheetmetal | $91,500 | 1: $2,425 | 1-10-06 |
| Hobson Fabrication | $91,300 | 1: $2,781 |
For more information regarding this page, please email Construction Management at 208.332.1900.