Skip navigation

Bid Results 2005

Bid Date
Project Number and Name
Contractor
Base Bid
Alternates
Awarded
12-27-05 06255 HVAC Controls/Upgrade, Phase II, Renfrew Hall, University of Idaho RM Mechanical $467,000 1: $27,000
2: $30,000
3: $76,000
4: $43,000
5: $88,000
2-8-06
12-21-05 04206 Interactive Learning Center Phase II, Boise State University, Boise, Idaho Sommer Builders Inc. $708,600    
  Bid Package #6R TMC, Inc. $678,800   12-22-05
  Bid Package #22R SBI Contracting   $78,500  
Partition Specialties   $46,048 12-22-05
12-13-05 03532 Renovate Caribou Cottage, Juvenile Corrections Center, St. Anthony, Idaho Larry Chapple Co. $693,806    
Vern Clark & Sons $685,000   12-29-05
DeWall Construction $711,300    
Eagle Rock Timber $765,436    
J & S Construction $734,400    
Rivers West $732,850    
DePatco $745,537    
12-01-05 03401 Life Safety Renovation "A" Building Remodel-SHS, Department of Health and Welfare, Blackfoot, Idaho Vern Clark & Sons Construction $266,000 1: $75,000
2: $26,500
3: $33,600
4: $28,000
5: $28,300
6: $5,500
7: $10,600
12-14-05
Rivers West Construction $280,000 1: $75,190
2: $26,500
3: $33, 650
4: $28,000
5: $28,875
6: $6,688
7: $10,900
 
Chapple Construction $271,500 1: $75,885
2: $26,705
3: $33,953
4: $28,258
5: $28,612
6: $6,681
7: $10,905
 
DL Beck Construction $276,659 1: $77,785
2: $30,166.88
3: $35,122
4: $29,231
5: $31,853
6: $4,961
7: $12,241
 
           
12-14-05 05063 Install Lightning and Surge Protection Systems-PWCC, Department of Correction, Pocatello, Idaho B & J Electric $35,200 1:$11,400 12-20-05
    Nash Electric $78,252 1:$11,500  
    Portneuf Electric $33,960 1:$14,226  
    Wheeler Electric $34,080 1:$13,995  
12-01-05 05227 Install New Water Line, Barton Road/Bartz Field, ISU, Pocatello, Idaho EagleRock Timber Inc.   $305,036.21  
 

3-H Construction   $196,747.00  
    J.B. Parsons   $190,100.00  
11-3-05 (ak)

04206 Rebid, Interactive Learning Center, Phase II, BSU, Boise, Idaho

Bid Package 7R

Steel West $559,158 2.5 $13,650 11-16-05
Outland Steel $718,580 2.5 $29,940
Bid Package 9R Johnson Brothers $300,000 2.5 $118,178 11-16-05
Sletten Construction $366,600 2.5 $86,200
Bid Package 10R Sletten Construction $39,250 11-16-05
Bid Package 13R Architectural Building Supply $161,650 2.5 $8,850 11-16-05
Bid Package 20R SBI Contracting $125,000 11-16-05
Bid Package 21R Office Equipment Company $18,059 11-16-05
Business Interiors, Inc. $27,927
Bid Package 22R Partition Specialties 2.5 $40,248 11-16-05
SBI Contracting 2.5 $77,000
Bid Package 23R Pac West Interiors $11,000 11-16-05
Bid Package 24R Allied Handling $9,251 11-16-05
Bid Package 30R Treasure Valley Fire Protection, Inc. $178,000 2.5 $6,000 11-16-05
Shilo Automatic Sprinklers, Inc. $180,722 2.5 $6,600
DeBest Fire Protection, Inc. $249,745 2.5 $9,740
Bid Package 32R Siemens $399,486 2.5 $5,630
2.5A $2,117
11-16-05
Johnson Controls $415,100 2.5 $5,826
2.5A $2,537
11-3-05 (ak) 03081 Renovate Electrical Wiring, Admin Bldg.,ISHS, Boise, Idaho Doherty Electric $59,110 1. $45,961
2. $27,795
3. $21,165
11-18-05
11-3-05 (gs) 05601 Renovate South Wing, Replace Tile & Nurses Station, Idaho State Veterans Home, Idaho Division of Veterans Services, Pocatello, Idaho Dewall Construction $178,600 1: $24,100
2: $4,200
J  & S Construction $175,200 1: $28,900
2: $4,300
Larry Chapple $157,000 1: $25,000
2: $3,500
11-15-05
Vern Clark & Sons $161,000 1: $26,100
2: $4,500
10-26-05 (ak) 06062 100-Bed Unit, Dept. of Correction, ISCI, Boise, Idaho Contractors Northwest $1,234,000 11-9-05
Valley Design & Construction $1,456,000
Scott Hedrick Construction $1,263,000
Sletten Construction $1,283,000
10-25-05 (ak) 02134 Maintenance Bldg. Expansion, EITC, Idaho Falls, Idaho Vern Clark & Sons Construction $626,800
Harris Brothers Construction $639,000
Century Construction $554,171
RE Beck Construction $442,714
10-19-05 (gs)

03070 Repair/Replace Water Tower Tank-SICI, Department of Correction, Boise, Idaho


Sletten Construction $330,000 1: $61,000
2: $32,000
3: $15,500
4: $10,500
5: $0
8-25-05 (ak) 06250 Reroof Brink/Phinney Hall, University of Idaho, Moscow, Idaho Cobra $633,225
Gillespie $627,875 7-12-05
11-1-05(gs) 99008 Chiller Replacement, Industrial Administration Building, Department of Administration, Boise, Idaho Cloverdale Plumbing $366,050
RM Mechanical $290,231 11-4-05
Drake Heating & Plumbing $352,000
10-26-05(gs) 04252 Storm Water Treatment Center, University Place, Idaho Falls, Idaho TMC Contractors $128,370 - Baysaver 3K 
$125,670 - Vortechs4000 


10-27-05
10-25-05(gs) 06061 Renovate Showers, Units 9, 10, 11, 13-ISCI, Department of Correction, Boise, Idaho Guho Corp $746,500 1: $76,000
2: $76,000
3: $76,000
C2 Construction $683,226 1: $61,152
2: $61,152
3: $61,152
SE/Z Construction $543,533 1: $64,969
2: $64,969
3: $64,969
10-28-05
10-20-05 (ak) 05213 Reroof Student Union Bldg., Boise State University, Boise, Idaho Contract West A. $967,100
B. $1,315,300
1. $146,200
Upson Co. A. $642,200
B. $972,270
1. $107,270 11-3-05
Quality Tile Roofing A. $698,053
B. $887,553
1. $75,016
Hobson Fabricating A. $833,103
B. No Bid
1. $99,467
10-19-05 (ak) 06542 25-Yard Pool Enclosure, LHSF, Lava Hot Springs, Idaho

ALL BIDS REJECTED - OVER BUDGET

Harris Construction $494,000
Rivers West Construction $452,000
DeWall Construction $463,200
MW Construction $429,850
10-14-05 (gs) 06132 HVAC Upgrade, Christofferson Bldg. #3, EITC, Idaho Falls, Idaho Johnson Controls $67,506 10-17-05
10-6-05 (gs) 02256 Boiler #01 Remodel, Steam Plant, University of Idaho, Moscow, Idaho 3-H Mechanical $152,886 10-11-05
RM Mechanical $164,000
10-6-05 (gs) 05065 Expand Kitchen/Dry Food Storage-SICI, Department of Correction, Boise, Idaho BMI Construction $420,536

1: $9,557
2: $23,225
3: $39,755
4: $7,890
5: $17,191
6: $13,910
7: $17,774
8: $7,416
9: $12,413

10-13-05
C2 Construction $475,537 1: $10,427
2: $25,071
3: $43,104
4: $16,834
5: $18,564
6: $15,175
7: $19,200
8: $7,824
9: $28,471
KEPHA Construction $424,349 1: $27,205
2: $22,653
3: $38,776
4: $7,696
5: $16,768
6: $13,568
7: $17,336
8: $7,233
9: $12,107
10-4-05 (gs) 01217 Barnes Towers Window Replacement, Boise State University, Boise, Idaho Gafford Construction $214,994 1: $23,832   
2: $8,290
10-27-05
BMI Construction $237,808 1: $24,439  
2: $8,685
Perkins Construction $225,696 1: $23,100  
 2: $8,100
9-29-05 (ak) 04206 Interactive Learning Center, Phase II, BSU, Boise, Idaho

Bid Package #5

Hillside Nursery $68,780 6. $36,785 11-1-05
ILS $90,600 6. $38,700
Bid Package #6
BIDS REJECTED - OVER BUDGET
TMC, Inc. $727,400
Bid Package #7

BIDS REJECTED - OVER BUDGET

Steel West, Inc. $559,159 2.5. $10,600
7. $5,720
8. $24,500
11-16-05
Bid Package #9
BIDS REJECTED - OVER BUDGET
Johnson Brothers $353,130 2.5. $132,375
5. $9,188
7. $266,000
11-16-05
Bid Package #11 Upson Company $342,500 2.5. $2,360
2.5A. $1,900
3. $580
4. $670
Modern Roofing $246,553 2.5. $0
2.5A. $0
3. $0
4. $0
Hobson Fabricating $192,034 2.5. $0
2.5A. $350
3. $350
4. $0
11-1-05
Bid Package #12 Cobra Roofing $387,100
Upson Company $314,830
Modern Roofing $301,995
Hobson Fabricating $240,000 11-1-05
Bid Package #13
BIDS REJECTED - OVER BUDGET
Architectural Building Supply $160,130 2.5 $8,930
5. $10,840
11-16-05
Bid Package #14 Overhead Door Company $9,240
Crawford Door $8,135 11-1-05
Bid Package #15 Custom Glass $896,700 2.5. $20,200
5. $1,140
7. ($4,180)
11-1-05
Inland Auto Glass $1,139,634 2.5. $11,200
5. $2,475
7. ($2,500)
Bid Package #16 Pac-West Interiors $962,550 2.5. $76,603
4. $18,047
5. $32,501
9. $200
11-1-05
Interior Systems, Inc. $1,016,526 2.5. $55,050
4. $13,820
5. $31,470
9. $0
Bid Package #17 Creechley Tile $24,995 2.5. $19,702
4. $8,019
11-1-05
Mesa Tile & Stone $32,050 2.5 $41,687
4.$9,250
Bid Package #18 Great Floors $147,047 2.5. $18,130
5. $34,587
Designer Floors, Inc. $129,000 2.5. $17,713
4. $204
5. $18,453
Dillabaugh Floor Covering $131,085 2.5. $16,519
4. $402
5. $19,607
Wall 2 Wall Floor Covering $96,900 2.5. $13,148
4. $342
5. $18,343
11-1-05
Bid Package #19 DPC, Inc. $111,286.29 2.5. $12,986.44
4. $2,067.83
5. $4,707.72
7. $0
8. $4,412.52
Color Craft Painting $74,800 2.5. $6,700
4. $1,200
5. $2,600
7. $900
8. $980
11-1-05
Bid Package #20
BIDS REJECTED - OVER BUDGET
SBI Contracting $125,000 4. $10,000
5. $22,000
11-16-05
Bid Package #24
BIDS REJECTED - OVER BUDGET
Overhead Door of Idaho $11,745
Bid Package #25
BIDS REJECTED - OVER BUDGET
BarGreen Ellington 2.5A. $711,321
Bid Package #26 Northwest Sales & Distributing $56,290 5. $11,428
Commercial Window Covering, Inc. $35,703 5. $7,137 11-1-05
Bid Package #27
BIDS REJECTED - OVER BUDGET
Nimbus 360 $852,691.93 5. $147,257.82
Bid Package #28 Thyssenkrup Elevator $163,847 9. $156,724
Schindler Elevator $122,700 9. $109,800 11-1-05
Bid Package #29 TML $1,667,000 2.5. $161,000
2.5A. $64,100
3. $56,100
4. $43,000
5. $60,400
RM Mechanical $1,575,000 2.5. $163,900
2.5A. $58,000
3. $48,500
4. $48,850
5. $48,200
11-1-05
Hobson Fabricating $1,581,000 2.5. $171,000
2.5A. $57,000
3. $49,000
4. $53,000
5. $48,000
DeBest Plumbing $1,763,184 2.5. $204,598
2.5A. $61,400
3. $53,600
4. $61,160
5. $50,774
Bid Package #30
BIDS REJECTED - OVER BUDGET
Shilo Ssprinkler $170,000
($12,000)
2.5. $6,600
4. $1,200
5. $6,250
Bid Package #31 EsCo $855,676
($475)
2.5. $76,645
2.5A $1,003
3. $1,154
4. $11,254
5. $48,310
7. $9,261
9. $2,830
Tri-State $774,774
($0)
2.5. $42,219
2.5A $17,318
3. $1,439
4. $7,592
5. $44,362
7. $8,457
9. $23,331
Lea Electric $1,005,001
($500)
2. $17,446
2.5. $83,497
2.5A $1,196
3. $2,405
4. $13,567
5. $32,744
7. $9,891
9. $2,170
Northwest Electrical $694,910
($500)
2.5. $34,928
2.5A $0
3. $1,213
4. $9,374
5. $49,569
7. $9,490
9. $8,786
11-1-05
Anderson & Wood Construction $857,829
($766)
2.5. $57,025
2.5A $820
3. $1,706
4. $7,122
5. $56,613
7. $9,226
9. $935
Bid Package #32
BIDS REJECTED - OVER BUDGET
Siemens $421,852 2.5. $5,800
2.5A. $2,745
3. $7,283.
4. $0
5. $14,749
9. $1,100
11-16-05
Johnson Controls $433,478 2.5. $6,880
2.5A. $2,537
3. $7,608
4. $4,324
5. $23,714
9. $913

9-29-05 (gs)

05032 Remodel Lower Level Offices, Admin. Building, Dept of Agriculture, Boise, Idaho Kepha Construction $92,216
Perkins Construction $89,500 10-7-05
CC Management Group $98,231
9-28-05 (ak) 05285 Advancement Tenant Finish-Out, Capitol Village, BSU, Boise, Idaho Contractors Northwest, Inc. $625,950 1. $10,800
2. $1,925
3. $1,000
4. $1,200
Kepha Construction $608,461 1. $11,602
2. $2,076
3. $1,114
4. $1,904
K-J Corporation $560,900 1. $10,400
2. $1,900
3. $950
4. $800
Jordan/Wilcomb $605,555 1. $11,200
2. $2,000
3. $1,000
4. $1,800
Guho Corp. $617,000 1. $11,680
2. $2,079
3. $1,116
4. $1,907
Perkins Construction $552,900 1. $11,393
2. $2,028
3. $1,088
4. $1,861
10-5-05
9-22-05 (ak) 05209 Stadium Structural Repairs, BSU, Boise, Idaho Restruction, Corp. $1,767,517.15 1. $57,094.24
2. $39,231.30
3. $13,863
4. $80,410
5. $23,694
Tatley & Grund, Inc. $1,599,990 1. $28,081.50
2. $44,455
3. $9,414
4. $70,650
5. $6,765
CDC Restoration & Construction $2,113,616.25 1. $52,618.02
2. $37,287.20
3. $9,391
4. $145,200
5. $19,339.65
RSCI $1,365,199.58 1. $37,660.24
2. $41,755.05
3. $5,485
4. $37,794.55
5. $-0-
Western Waterproofing $1,403,080 1. $50,188
2. $32,650
3. $4,959
4. $52,000
5. $9,030
11-2-05
9-14-05 (ak) 06500 Asphalt Pavement Repair, Overlay/New Surfacing, IDL, Cataldo, Idaho Coeur d'Alene Paving $30,350 9-19-05
Poe Asphalt $32,343.68
9-13-05 (gs) 05286 Lab Remodel, Room 241, Science & Nursing Bldg, Boise State University, Boise, Idaho K-J Corporation $241,381 $5,900
Perkins Construction $221,000 $6,200 9-13-05
9-8-05 (gs) 04150 Storm Drainage System, Lewis-Clark State College, Lewiston, Idaho Atlas Sand & Rock, Inc. $141,712 A. $55,397
B. $16183
9-8-05
A&R Construction $205,500 A. $59,000
B. $23,200
M.L. Albright & Sons, Inc. $257,015 A. $63,240
B. $21,487
9-1-05 (ak) 02541 Dressing Rooms, Lava Hot Springs Foundation, Lava Hot Springs, Idaho Harris Construction  $789,000 1. $9,700
2. $10,500
3. $11,000
9-8-05
SE/Z Construction $889,187 1. $10,452
2. $7,709
3. $13,246
Rivers West Construction $830,500 1. $14,700
2. $9,800
3. $11,500
DeWall Construction $949,000 1. $14,990
2. $10,550
3. $11,100
8-31-05 (ak) 06170 Reroof Boswell Hall, North Idaho College, Coeur d'Alene, Idaho Arrow Roofing $497,000 1. $359,000 9-8-05
Krueger Sheet Metal $521,802 1. $430,750
8-30-05 (ak) 06300 Reroof Job Service Bldg., Dept of Commerce & Labor, Pocatello, Idaho Briggs Roofing $69,435
Modern Roofing & Insulation, Inc. $78,500
Smith Roofing $43,800 9-7-05
Thomas D. Roofing, Inc. $65,690
8-24-05 (ak)

06220 Reroof Leonard Hall Pharmacy Bldg., Idaho State University, Pocatello, Idaho Robison Roofing $89,612 8-30-05
Smith Roofing $132,698
8-18-05 (ak) 06360 Reroof Commissary/Dietary Bldg., ISSH, Nampa, Idaho Pro Tech Roofing $114,702 1. $3,994
2. $7,830
3. $2,628
Modern Roofing $81,350 1. $1,800
2. $3,600
3. $1,300
8-29-05
8-18-05 (ak) 06252 Reroof Mines Bldg., University of Idaho, Moscow, Idaho Gillespie $113,250 8-30-05
Icon Corp. $157,000
Missoula Sheet Metal $125,760
8-16-05 (ak) 05504 Office Addition, Dept. of Lands, McCall, Idaho CC Management Group $239,440
W.T. Seufert, Inc. $212,500 8-29-05
8-4-05 05152 Expansion, Industirial Ag Complex, LCSC, Lewiston, Idaho A & R Construction $407,448
Kenaston Corporation $415,910
Leone & Keeble $519,000
S & W Construction $398,600 8-16-05
Teel Construction $470,693
8-3-05 04351 Standby Generators, H & W Labs, Boise, Idaho

ALL BIDS REJECTED
Romar Electric $709,850 #1 $12,790
#2 $11,975
Perkins Construction $840,668 #1 $15,834
#2 $131,883
Hobson Fabricating $662,227 #1 $16,500
#2 $44,946 
8-3-05 04301 New Job Service Center, Commerce & Labor, Idaho Falls, ID Bateman-Hall $1,750,000 #1 $12,500
#2 $ 5,000
#3 $32,500
#4 $15,000
#5 $90,000
#6 $ 3,000
#7 $ 6,000
#8 $22,000
8-18-05
8-2-05 (ak) 04206 Interactive Learning Center, BSU, Boise, Idaho

Bid Package #1

MJ's Backhoe $434,423 1. $147,901
Paul Construction $367,190 1. $122,793
IRA-MAC $312,748 1. $104,800 9-12-05
Bid Package #2 Cascade Fence Company $13,300 9-12-05
Bid Package #3 RSCI $3,054,021
Contractors Northwest $2,355,970
McAlvain Construction $1,861,100 9-12-05
Bid Package #4 Romar Electric $10,676 2. $25,440 9-12-05
Northwest Electrical $16,454 2. $27,732
Electric Service & Contracting $19,744 2. $53,796
Tri-State Electric $42,670 2. $34,280
Commercial Electric $25,000 2. $35,858
7-26-05 (ak) 05218 Remodel Art Dept, Bldg. #5, Capitol Village, BSU, Boise, Idaho SE/Z $367,962 1. $28,192
2. $7,603
3. $26,833
4. $24,377
5. $2,095
9-12-05

Guho Corp. $393,652 1. $29,287
2. $7,224
3. $26,654
4. $22,954
5. $2,231
K-J Corp. $381,500 1. $28,700
2. $8,900
3. $42,800
4. $27,800
5. $1,900
Perkins Construction $375,800 1. $28,400
2. $7,000
3. $20,900
4. $25,900
5. $1,800
Excelsior Construction $383,000 1. $27,800
2. $6,900
3. $23,900
4. $25,600
5. $1,100
       
       
       
7-26-05 (ak) 06110 Reroof Lower Roof, Old Administration Building, ISDB, Gooding, Idaho Modern Roofing $120,542
Wilson Rooifng $120,827
Smith Roofing $105,818
Robison Roofing $91,500 8-1-05
Summit $99,700
7-28-05 05284 Varsity Center Infill, BSU, Boise, Idaho Excelsior Construciton $219,000
SE/Z Construction $198,892
McAlvain Construction $193,711 8-3-05
Perkins Construction $202,000
7-22-05 03400 Replace Heat Pumps, Phase I, PTF, State Hospital South, Blackfoot, Idaho Bingham Mechanical $388,000 1. $95,000
2. $87,000
3. $92,000
4. $99,000
7-26-05
Lewis Mechanical $391,500 1. $97,200
2. $88,100
3. $92,800
4. $101,500
7-18-05 (ak) 05330 Renovate Armory, Division of Military, Emmett, Idaho Excelsior Construction $439,000 1. $51,200
2. $11,918
3. $13,900
4. $15,300
5. $  8,600
Gafford Construction $453,216 1. $20,913
2. $12,321
3. $15,571
4. $17,875
5. $  8,001
7-26-05
RSCI $456,541 1. $52,470
2. $12,989
3. $13,395
4. $17,050
5. $  9,923
SE/Z $477,810 1. $23,122
2. $11,520
3. $12,594
4. $16,504
5. $  7,950
7-12-05 (ak) 05253 Renovate Renfrew Hall, Phase VI, UI, Moscow, Idaho Contractors Northwest $729,000 1. $22,830
2. $19,960
3. $21,120
4. $11,120
5. $12,722
7-21-05
KOP Construction $762,166 1. $23,399
2. $20,495
3. $21,668
4. $11,938
5. $13,490
Teel Construction $763,953 1. $24,444
2. $20,771
3. $21,979
4. $11,424
5. $13,038
7-7-05 (ak) 06251 Reroof Ridenbaugh Hall, University of Idaho, Moscow, Idaho Kenaston Corp. $189,506
Contractors NW $117,175
RMR Construction, LLC $100,000 7-12-05
7-7-05 05061 Domestic Water Storage System Upgrade, Dept. of Correction, Boise, Idaho Star Construction $140,635 1. $14,238
2. $14,238
3. $10,344
7-8-05
Challenger Co. $159,745 1. $18,040
2. $18,040
3. $10,295
7-6-05
03500 Parking Lot Overlay, Mica Forest Protective Dist., Coeur d'Alene, Idaho Poe Asphalt $50,000
Coeur d'Alene Paving $40,408.87 7-18-05
Interstate Asphalt $50,974
7-1-05 (ak) 05214 West Campus Parking Lots, BSU, Nampa, Idaho Paul Construction $98,300 1. $29,000
2. $25,000
3. a. $12,136
    b. $3,280
    c. $2,624
4. a. $3,900
    b. $1,500
    c. $1,200
5. $4,500
7-8-05
6-28-05 (ak) 05255 Mechanical System Upgrade, Phase II, ISU / UI, University Place, Idaho Falls, Idaho Siemens $77,851 1. $  9,972
2. $30,257
3. $  4,350
7-20-05
5-31-05 (ak) 05504 Rebid Office , Addition/Parking Lots, Dept. of Lands, McCall, Idaho

Bids Rejected - Over Budget

W.T. Seufert $299,500
6-29-05 04082 Rock Creek Interpretive Center, ISHS, Hansen, Idaho

ALL BIDS REJECTED - OVER BUDGET

Ralph Thornton Construction $268,320 1. $4,970
2. $6,800
3. $3,682
4. $1,290
6-23-05 05212 Site Demolition, Block 7 & 10, Boise State University, Boise, Idaho Ideal Demolition Services, Inc. $309,700
C & C Salvage & Demolition $337,571
Magnum Demolition $271,500 6-23-05
6-21-05 (ak) 05253 Renovate Renfrew Hall, Ph VI, Universityof Idaho, Moscow, Idaho

ALL BIDS REJECTED - OVER BUDGET

T.W. Clark Construction $798,600 1. $23, 700
2. $21,600
3. $22,000
4. $13,000
5. $15,000
Contractors Northwest $697,000 1. $22,000
2. $21,300
3. $18,000
4. $22,000
5. $15,000
KOP Construction $753,276 1. $24,411
2. $22,617
3. $23,413
4. $13,723
5. $15,778
Teel Construction $756,862 1. $25,294
$  $22,531
3. $23,334
4. $16,904
5. $14,999
6-15-05 (ak) 02261 Teaching & Learning Center, Bid Package #3, Signage Package, UI, Moscow, Idaho Doty $66,000 1. $2,500
2. $9,000
3. $7,500
4. $15,000
7-6-05
NW Engraving $32,729 1. $3,032
2. $5,940
3. $ - 0 -
4. $17,115
6-15-05 (ak) 01222 Rebid Multi-Use Complex, Ph IV, ISU, Pocatello, Idaho
BP #28
Intermountain Design $108,969 6-22-05
Saxton Bradley $118,767
Partition Specialties $123,700
PB #31
All Bids Rejected - Over Budget
Bargreen-Ellingson $1,531,475
Bintz $1,392,389
J & V Restaurant Supply $1,498,000
6-14-05 (ak) 05214 West Campus Parking Lots, Boise State University, Nampa, Idaho

All Bids Rejected - Over Budget
Paul Construction, Inc. $615,521 1. $21,000
2. $13,650
3. $9,900
4. a. $30,000
    b. $15,000
5. a. $49,600
    b. $19,000
Guho Corporation $683,321 1. $21,256
2. $21,178
3. $10,416
4. a. $13,414
    b. $10,122
5. a. $26,085
    b. $19,231
6-7-05 05223 Repair Terra Cotta, 2 Buildings, ISU, Pocatello, Idaho Hydro Tech, Inc. $139,500 6-16-05
Rivers West Construction $147,500
6-7-05 (ak) 05222 Repair Exterior Wall, Eli Oboler Library, ISU, Pocatello, Idaho

All Bids Rejected - Over Budget

Hydro Tech, Inc. $542,000
Rivers West Construction $497,000
06-01-05 05091 Campus Firelane, CSI, Twin Falls, Idaho Durham  N/A 1. $49,376.50
2. $25,558.42
3. $47,035.98
4. $55,093.67
7-7-05
5-26-05 (ak) 05252 Renovate Library Elevator, University of Idaho, Moscow, Idaho Kenaston Corp $215,720 1. $ 4,494
2. $17,891
A&R Construction $203,485 1. $ 4,614
2. $16,600
6-17-05
Teel Construction $221,947 1. $ 4,500
2. $17,259
5-25-05 (ak) 04331 Renovation, St. Anthony Armory, Military Division, St. Anthony, Idaho Vern Clark $829,000 1. $ 40,500
2. $153,000
3. $ 30,000
4. $ 24,000
Double E $742,000 1. $ 38,045
2. $149,640
3. $  55,750
4. $ 26,145
6-15-05
SE/Z Construction $829,168 1. $ 49,425
2. $115,586
3. $  1,647
4. $ 23,605
5-23-05 (ak) 05231 Audio/Visual Equipment, Performing Arts Center, ISU, Pocatello, Idaho General Communication $426,926 1. $81,850 5-26-05
5-18-05 (ak) 04200 Rebid Door Access/Security System, Ph I, BSU, boise, Idaho Perkins Construction $177,550 1.  $ 2,885
2.  $19,080
3.  $17,164
4.  $29,216
5.  $25,197
6.  $22,770
7.  $26,972
8.  $26,260
9.  $29,313
10. $24,090
5-27-05
5-17-05 (ak) 04320 New Computer/Server Rm., 2nd Floor Office/Warehouse, ISLD, Boise, Idaho Guho Corp. $98,905 5-25-05
Gafford Construction $99,399
CC Management Group $116,943
Perkins Construction $103,400
5-17-05 (ak) 04320 New Computer/Server Rm., 2nd Floor Office/Warehouse, ISLD, Boise, Idaho Guho Corp. $98,905 5-25-05
Gafford Construction $99,399
CC Management Group $116,943
Perkins Construction $103,400
5-26-05 (ak) 05252 Renovate Library Elevator, University of Idaho, Moscow, Idaho Kenaston Corp $215,720 1. $ 4,494
2. $17,891
A&R Construction $203,485 1. $ 4,614
2. $16,600
6-17-05
Teel Construction $221,947 1. $ 4,500
2. $17,259
5-25-05 (ak) 04331 Renovation, St. Anthony Armory, Military Division, St. Anthony, Idaho Vern Clark $829,000 1. $ 40,500
2. $153,000
3. $ 30,000
4. $ 24,000
Double E $742,000 1. $ 38,045
2. $149,640
3. $  55,750
4. $ 26,145
6-15-05
SE/Z Construction $829,168 1. $ 49,425
2. $115,586
3. $  1,647
4. $ 23,605

5-23-05(ak)

05231 Audio/Visual Equipment, Performing Arts Center, ISU, Pocatello, Idaho General Communication $426,926 1. $81,850 5-26-05
5-18-05 (ak) 04200 Rebid Door Access/Security System, Ph I, BSU, boise, Idaho Perkins Construction $177,550 1.  $ 2,885
2.  $19,080
3.  $17,164
4.  $29,216
5.  $25,197
6.  $22,770
7.  $26,972
8.  $26,260
9.  $29,313
10. $24,090
5-27-05
5-17-05 (ak) 04320 New Computer/Server Rm., 2nd Floor Office/Warehouse, ISLD, Boise, Idaho Guho Corp. $98,905 5-25-05
Gafford Construction $99,399
CC Management Group $116,943
Perkins Construction $103,400
5-17-05 (ak) 04532 Rebid Security Fence, Juvenile Corrections Center, Lewiston, Idaho Kenaston Corp. $123,609 1. $10,403
NW Fence $125,394 1. $3,400 6-16-05
4-29-05 03223  Increase Steam Capacity, Central Heating Plant, ISU, Pocatello, Idaho Atlas $739,390 1. $11,180
2. $99,528
3. $78,330
4. $40,880
Lewis $540,000 1. $7,200
2. $95,965
3. $75,380
4. $43,700
5-24-05
Bingham $495,000 1. $7,800
2. $92,800
3. $78,600
4. $42,000
4-29-05 (ak) 05224 Repair External Ledges, Garrion Hall, ISU, Pocatello, Idaho R.E. Beck Construction $141,545 1. $3,810
2. $1,270
3. $1,385
4. $   897
Rivers West $88,165 1. $10,890
2. $  3,630
3. $  7,005
4. $  1,579
5-2-05
4-28-05 (ak) 05400 Re-bid Reroof "A" Building, State Hospital South, Blackfoot, Idaho Robison Roofing $183,843 1. $53,460 5-9-05
Modern Roofing $218,309 1. $57,743
Smith Roofing $184,100 1. $64,200
Contract West Roofing $226,100 1. $61,000
Wilson Roofing $227,315 1. $64,054
4-14-05 (ak) 04206 Interactive Learning Center, Sattellite Dish Relocation, BSU, Boise, Idaho

Bid Package #1

 

 

 

Asbestos Abatement

 

 

 

$21,777

4-18-05

Bid Package #2

Precision Finish $4,300 4-18-05

Bid Package #3

K B Fabrication $29,300 4-18-05
Bid Package #4 Quality Tile Roofing $44,623
Upson Company $31,931 4-18-05

Bid Package #5

Precision Finish $1,600 4-18-05

Bid Package #6

RM Mechanical $17,864
Hobson Fabricating #13,000 4-18-05

Bid Package #7

Electric Service $141,702 4-18-05
Romar Electric $148,860
4-13-05 (ak) 04541 New Storage Building, Dept. of Parks & Rec, Boise, Idaho Gafford Construction $229,137 1. $ 2, 632
2. $14,985
SE/Z Construction $223,773 1. $ 2,475
2. $13,601
K-J Corporation, Inc. $224,000 1. $ 3,225
2. $9,200
Perkins Construction $210,745 1. $ 2,300
2, $15,000
4-22-05
4-6-05(ak) BID REJECTED 05362 Install New HVAC System, Dietary/Commissary, ISSH, Nampa, Idaho
Drake Mechanical $169,809 1. $22,927
4-7-05 05229 Replacement of Two Rooftop Air Conditioners, Museum of Natural History Building, ISU, Pocatello, Idaho
Lewis $80,500 4-22-05
B & S Boiler $76,875
Economy $87,000
4-1-05 (ak)
ALL BIDS WERE REJECTED

 

 

02541 New Dressing Rooms, Lava Hot Springs Foundation, Lave Hot Springs, Idaho

DeWall Construction

 

$1,027,000

 

 

1.  $49,600
2.  $5,050
3.  $3,333
4.  $39,540
5.  $1,590
6.  $7,220
7.  $13,300
SE/Z Construction

 

 

$1,143,443

 

1.  $48,118
2.  $5,352
3.  $3,200
4.  $52,103
5.  $1,280
6.  $8,851
7.  $13,971
3-29-05 (ak) 04332 Rebid Renovate Armory, Phase III, Division of Military, Gooding, Idaho Perkins $424,900 1. $105,192
2. $  41,438
3. $  12,931
4. $  32,329
5. $  19,309
Hayes $336,525 1. $133,275
2. $  27,464
3. $  10,432
4. $  29,816
5. $  19,117
4-12-05
WCI $349,702 1. $156,555
2. $  40,444
3. $  11,739
4. $  32,462
5. $  21,106
Walton, Inc.

 

 

$406,187

 

 

1. $111,870
2. $  35,980
3. $  10,780
4. $  26,760
5. $  18,188
3-24-05 (ak)

05111 HVAC, Old Admin. Bldg., ISDB, Gooding, Idaho
Sawtooth Sheet Metal

$190,857


1. $15,925


4-19-05
Bowmans, Inc. $205,267 1. $16,093
Hobson Fabricating $202,500 1. $11,300
3-23-05 (ak)

 

04213 Remodel Math/Geosciences Rm 207, BSU, Boise, Idaho Luekenga Construction

 

$633,964

 

1. $4,116
2. $4,201
3. $4,000
4-26-05
Gafford Construction

 

$691,189

 

1. $ 9,348
2. $13,463
3. $ 2,945
Perkins Construction
$638,000

 

1. $4,100
2. $4,600
3. $1,921
SE/Z Construction

 

$629,752

 

1. $ 8,775
2. $13,071
3. $ 8,000
K-J Corporation

 

$659,200

 

1. $ 9,200
2. $12,400
3. $ 3,000
3-10-05 (ak)
ALL BIDS
REJECTED!

 

05231 Audio/Visual Equipment, Performing Arts Center, ISU Pocatello, Idaho AATronics



$549,900



AIC Solutions
$412,542
General Communications
$493,249

SPL
$680,737.90
4-20-05 03193 HVAC Upgrade and Chiller Replacement, Science and Nursing Building #072, BSU, Boise, Idaho Hobson $740,000 1. $10,163
2. $27,148
3. 0
4. $82,901

YMC, Inc. $742,468 1. $20,786
2. $22,056
3. 0
4. $81,528
Perkins $752,262 1. $16,774
2. $20,000
3. 0
4. $57,200
4-19-05 04301 I New Job Service Center, Idaho Falls, Idaho Arrington Construction $1,922,180 1. $66,678
2. $11,247
3. $8,764
4. $7,564
5. $7,965

Bateman Hall $1,898,000 1. $72,500
2. $12,500
3. $5,700
4. $4,500
5. $9,000
Double E Construction $1,850,985 1. $68,155
2. $18,871
3. $10,380
4. $2,110
5. $14,771
Ormond Builders $1,811,438 1. $64,713
2. $11,804
3. $4,604
4. $3,806
5. $8,104
SE-Z Construction $1,789,487 1. $62,885
2. $10,531
3. $4,641
4. $3,675
5. $8,153
Harris, Inc. $1,823,000 1. $67,000
2. $11,000
3. $4,600
4. $3,900
5. $14,000
4-14-05 02262 University of Idaho, Continuing Education Building Elevator Addition, Moscow, Idaho Arnzen Construction $469,400 1.  $24,000
4-5-05 05228 Replace Heating Coils, College of Business Building - ISU, Pocatello, Idaho Lewis Corporation $85,000 4-7-05
B & S Boiler Inc. $71,709
3-29-05

 

04201 Stand-By Generator, Telecomm Room, Heat Plant, BSU, Boise, Idaho Town and Country Electric


$49,044



4-21-05
Power Electric $42,575
3-24-05

 

05094 Replace Air Handler, Canyon Building,  CSI, Twin Falls, Idaho Reis Plumbing & Heating, Inc.

 

$56,682

 

1. $34,660
2. $1,415

 

4-1-05

 

Hobson Fabricating
$57,400

1. $36,500
2. $2,200
RM Mechanical
$61,500
1. $37,300
2. $4,915
Sawtooth Sheet Metal
$55,535

 

1. $33,980
2. $1,260
3-18-05

 

 

05131 Boiler Replacement/Direct Digital Control-Sessions Building, EITC, Idaho Falls, Idaho
Atlas

 

 

$69,960

 

 

3-25-05

 

 

B &  S Boiler $53,945
Bingham Mechanical
$53,350
3-17-05

 

05380 Replace Water/Sewer/Fire Lanes, DHW, SHN, Orofino, Idaho Curry, Inc.

 

 $82,615

 

1. $50,934
2. $48,424
3. $56,822
4-29-05
Crea Construction

 

$65,370

 

1. $21,350
2. $17,210
3. $17,475
River View

 

$65,681

 

1. $18,600
2. $14,000
3. $13,800
S & L Underground

 

$95,000

 

1. $38,000
2. $32,000
3. $33,000
A & R Construction

 

$89,000

 

1. $26,100
2. $18,500
3. $21,000
3-17-05

 

03400 Replace Heat Pumps, Phase I , DHW, PTF, SHS, Blackfoot, Idaho
Bingham Mechanical


$543,000



1. $84,000
2. $94,000

3-9-05

 

05510 Carpet Replacement, Dorm/Cafeteria, ISP, Meridian, Idaho
Great Floors

 

$13,777

 

1. $15,700
2. $15,700
3. $2,500
4. $2,500
May 10, 2005
Contract Floors

 

$12,720

 

1. $16,845
2. $18,703
3. $2,012
4. $2,012
Master Craft Contractors

 

$16,600

 

1. $20,300
2. $20,900
3. $20,950
4. $20,900
Designer Floors

 

$15,745

 

1. $16,745
2. $17,333
3. $1,748
4. $1,748
3-9-05

 

05510 Carpet Replacement, Dorm/Cafeteria, ISP, Meridian, Idaho
Great Floors

 

$13,777

 

1. $15,700
2. $15,700
3. $2,500
4. $2,500
Contract Floors

 

$12,720

 

1. $16,845
2. $18,703
3. $2,012
4. $2,012
Master Craft Contractors

 

$16,600

 

1. $20,300
2. $20,900
3. $20,950
4. $20,900
Designer Floors

 

$15,745

 

1. $16,745
2. $17,333
3. $1,748
4. $1,748
3-2-05

 

 

02208 Lecture Hall Renovation, RM 112, Education Building, BSU, Boise, Idaho

 

CCMG

 

 

$118,446.00

 

 

1. $44,421
2. $3,858
3. $10,118
4. $1,607
5. $4,045
3-16-05

 

 

Gafford

 

$140,938

 

1. $45,247
2. $3,903
3. $8,165
4. $4,110
5. $8,051
KJ


 

$148,265


 

1. $53,062
2. $4,295
3. $11,256
4. $4,750
5. $8,855
Luekenga

 

 

$138,153

 

 

1. $42,253
2. $3,808
3. $7,920
4. $4,865
5. $11,300
KEPHA

 

 

127,252

 

 

1. $47,050
2. $3,760
3. $6,870
4. $3,710
5. $7,753
3-1-05

 

02402 Replacement Sewer Line, SHS, DHW, Blackfoot, Idaho Accelerated Paving

 

$24,990

 

Rising River
$22,932
4-1-05
2-23-05

 

04204 Air Handling System, Liberal Arts Photo Lab, BSU, Boise, Idaho  Hobson

 

$54,000

 

4-1-05
Perkins

$62,100

2-22-05

 

 

05012 Computer Room Cooling System Upgrade, ADM, LBJ Building, Boise, Idaho R M 

 

 

$27,210

 

 

Ridgeway
$22,602
TML
$33,900
Hobson
$23,800
1-19-05


01194 West Campus First Academic Building, Bid Package #36 Power Plus, Inc.

 

32,948

 

Lea Electric

 

$34,600

 

3-2-05

 

 

02208 Lecture Hall Renovation, RM 112, Education Building, BSU, Boise, Idaho

 

CCMG

 

 

$118,446.00

 

 

1. $44,421
2. $3,858
3. $10,118
4. $1,607
5. $4,045
3-16-05

 

 

Gafford

 

$140,938

 

1. $45,247
2. $3,903
3. $8,165
4. $4,110
5. $8,051
KJ


 

$148,265


 

1. $53,062
2. $4,295
3. $11,256
4. $4,750
5. $8,855
Luekenga

 

 

$138,153

 

 

1. $42,253
2. $3,808
3. $7,920
4. $4,865
5. $11,300
KEPHA

 

 

127,252

 

 

1. $47,050
2. $3,760
3. $6,870
4. $3,710
5. $7,753
3-1-05

 

02402 Replacement Sewer Line, SHS, DHW, Blackfoot, Idaho Accelerated Paving

 

$24,990

 

Rising River
$22,932
4-1-05
2-23-05

 

04204 Air Handling System, Liberal Arts Photo Lab, BSU, Boise, Idaho  Hobson

 

$54,000

 

Perkins

$62,100

2-22-05

 

 

05012 Computer Room Cooling System Upgrade, ADM, LBJ Building, Boise, Idaho R M 

 

 

$27,210

 

 

Ridgeway
$22,602
TML
$33,900
Hobson
$23,800
1-19-05


01194 West Campus First Academic Building, Bid Package #36 Power Plus, Inc.

 

32,948

 

Lea Electric

 

$34,600

 

4-7-05 (ak) 04200 Door Access/Security, Phase I, BSU, Boise, Idaho Integrated Security Resources $279,500 0. $9,360
1. ($4,400)
2a. $29,572
2b. ($430)
3a. $26,535
3b. ($380)
4a. $31,973
4b.($460)
5a. $29,046
5b. ($360)
6a. $32,199
6b. ($420)
7a. $22,750
7b. ($380)
AIC Solutions $97,059 0. $3,239
1. $0
2a. $15,367
2b. $0
3a. $13,126
3b. $0
4a. $12,621
4b. $0
5a. $13,667
5b. $0
6a. $12,642
6b. $0
7a. $8,454
7b. $0 
2-23-05 (ak) 04310 Interior/Exterior Finishes, IDFG, Coeur d'Alene, Idaho Northcon, Inc. $18,480 1. $2,340
S & S Coatings, Inc. $25,992 1. $2,910
Stockwell Painting $27,398 1. $4,360
Spectrum Coating, Inc. $17,887 $1,900 2-28-05
2-23-05  (ak) ALL BIDS REJECTED: Being combined with 04206 05281 Relocate Satellite Dishes, BSU, Boise, Idaho CM Company, Inc. $275,937
Ellsworth Kinkaid $321,601
Perkins Construction $281,100
2-22-05 (ak) 05067 Rebid, Repair/Replace Sallyport Gates, PWCC, Dept. of Correction, Pocatello, Idaho Walton, Inc. $164,900
R.E. Beck Construction $127,539 3-18-05
Brennan Construction $162,800
2-9-05(ak)
ALL BIDS REJECTED: Will rebid at a later date.
04332 Renovate Armory, Phase III, Div. of Military, Gooding, Idaho Hayes Construction $392,334 1. $142,855
2. $  26,719
3. $  10,432
4. $  29,816
5. $  19,692
Walton, Inc. $532,712 1. $  82,056
2. $  36,522
3. $  10,780
4. $  27,097
5. $  19,127
Perkins Construction, Inc. $475,900 1. $105,000
2. $  41,400
3. $  12,900
4. $  31,700
5. $  19,800
WCI Construction Specialties $415,369 1. $198,106
2. $  40,318
3. $  11,702
4. $  32,361
5. $  21,673
Starr Corporation $465,200 1. $180,000
2. $  28,500
3. $  10,300
4. $  30,900
5. $  19,100
2-8-05 (ak) 03110 Fire Sprinkler Upgrades/System Improvements, IDBS, Gooding, Idaho Treasure Valley Fire Protection $355,000 1. $12,800
2. $17,900
Shilo Automatic Sprinkler, Inc. $340,000 1. $18,200
2. $16,400
3-10-05

For more information regarding this page, please email Construction Management at 208.332.1900.