Bid Date |
Project
Number and Name |
Contractor
|
Base
Bid
|
Alternates
|
Awarded
|
| 12-27-05 | 06255 HVAC Controls/Upgrade, Phase II, Renfrew Hall, University of Idaho | RM Mechanical | $467,000 | 1: $27,000
2: $30,000
3: $76,000 4: $43,000 5: $88,000 |
2-8-06 |
| 12-21-05 | 04206 Interactive Learning Center Phase II, Boise State University, Boise, Idaho | Sommer Builders Inc. | $708,600 | ||
| Bid Package #6R | TMC, Inc. | $678,800 | 12-22-05 | ||
| Bid Package #22R | SBI Contracting | $78,500 | |||
| Partition Specialties | $46,048 | 12-22-05 | |||
| 12-13-05 | 03532 Renovate Caribou Cottage, Juvenile Corrections Center, St. Anthony, Idaho | Larry Chapple Co. | $693,806 | ||
| Vern Clark & Sons | $685,000 | 12-29-05 | |||
| DeWall Construction | $711,300 | ||||
| Eagle Rock Timber | $765,436 | ||||
| J & S Construction | $734,400 | ||||
| Rivers West | $732,850 | ||||
| DePatco | $745,537 | ||||
| 12-01-05 | 03401 Life Safety Renovation "A" Building Remodel-SHS, Department of Health and Welfare, Blackfoot, Idaho | Vern Clark & Sons Construction | $266,000 | 1: $75,000 2: $26,500 3: $33,600 4: $28,000 5: $28,300 6: $5,500 7: $10,600 |
12-14-05 |
| Rivers West Construction | $280,000 | 1: $75,190 2: $26,500 3: $33, 650 4: $28,000 5: $28,875 6: $6,688 7: $10,900 |
|||
| Chapple Construction | $271,500 | 1: $75,885 2: $26,705 3: $33,953 4: $28,258 5: $28,612 6: $6,681 7: $10,905 |
|||
| DL Beck Construction | $276,659 | 1: $77,785 2: $30,166.88 3: $35,122 4: $29,231 5: $31,853 6: $4,961 7: $12,241 |
|||
| 12-14-05 | 05063 Install Lightning and Surge Protection Systems-PWCC, Department of Correction, Pocatello, Idaho | B & J Electric | $35,200 | 1:$11,400 | 12-20-05 |
| Nash Electric | $78,252 | 1:$11,500 | |||
| Portneuf Electric | $33,960 | 1:$14,226 | |||
| Wheeler Electric | $34,080 | 1:$13,995 | |||
| 12-01-05 | 05227 Install New Water Line, Barton Road/Bartz Field, ISU, Pocatello, Idaho | EagleRock Timber Inc. | $305,036.21 | ||
|
3-H Construction | $196,747.00 | |||
| J.B. Parsons | $190,100.00 | ||||
| 11-3-05 (ak) | 04206 Rebid, Interactive Learning Center, Phase II, BSU, Boise, Idaho Bid Package 7R |
Steel West | $559,158 | 2.5 $13,650 | 11-16-05 |
| Outland Steel | $718,580 | 2.5 $29,940 | |||
| Bid Package 9R | Johnson Brothers | $300,000 | 2.5 $118,178 | 11-16-05 | |
| Sletten Construction | $366,600 | 2.5 $86,200 | |||
| Bid Package 10R | Sletten Construction | $39,250 | 11-16-05 | ||
| Bid Package 13R | Architectural Building Supply | $161,650 | 2.5 $8,850 | 11-16-05 | |
| Bid Package 20R | SBI Contracting | $125,000 | 11-16-05 | ||
| Bid Package 21R | Office Equipment Company | $18,059 | 11-16-05 | ||
| Business Interiors, Inc. | $27,927 | ||||
| Bid Package 22R | Partition Specialties | 2.5 $40,248 | 11-16-05 | ||
| SBI Contracting | 2.5 $77,000 | ||||
| Bid Package 23R | Pac West Interiors | $11,000 | 11-16-05 | ||
| Bid Package 24R | Allied Handling | $9,251 | 11-16-05 | ||
| Bid Package 30R | Treasure Valley Fire Protection, Inc. | $178,000 | 2.5 $6,000 | 11-16-05 | |
| Shilo Automatic Sprinklers, Inc. | $180,722 | 2.5 $6,600 | |||
| DeBest Fire Protection, Inc. | $249,745 | 2.5 $9,740 | |||
| Bid Package 32R | Siemens | $399,486 | 2.5
$5,630 2.5A $2,117 |
11-16-05 | |
| Johnson Controls | $415,100 | 2.5
$5,826 2.5A $2,537 |
|||
| 11-3-05 (ak) | 03081 Renovate Electrical Wiring, Admin Bldg.,ISHS, Boise, Idaho | Doherty Electric | $59,110 | 1.
$45,961 2. $27,795 3. $21,165 |
11-18-05 |
| 11-3-05 (gs) | 05601 Renovate South Wing, Replace Tile & Nurses Station, Idaho State Veterans Home, Idaho Division of Veterans Services, Pocatello, Idaho | Dewall Construction | $178,600 | 1: $24,100 2: $4,200 |
|
| J & S Construction | $175,200 | 1: $28,900 2: $4,300 |
|||
| Larry Chapple | $157,000 | 1: $25,000 2: $3,500 |
11-15-05 | ||
| Vern Clark & Sons | $161,000 | 1: $26,100 2: $4,500 |
|||
| 10-26-05 (ak) | 06062 100-Bed Unit, Dept. of Correction, ISCI, Boise, Idaho | Contractors Northwest | $1,234,000 | 11-9-05 | |
| Valley Design & Construction | $1,456,000 | ||||
| Scott Hedrick Construction | $1,263,000 | ||||
| Sletten Construction | $1,283,000 | ||||
| 10-25-05 (ak) | 02134 Maintenance Bldg. Expansion, EITC, Idaho Falls, Idaho | Vern Clark & Sons Construction | $626,800 | ||
| Harris Brothers Construction | $639,000 | ||||
| Century Construction | $554,171 | ||||
| RE Beck Construction | $442,714 | ||||
| 10-19-05 (gs) | 03070 Repair/Replace Water Tower Tank-SICI, Department of Correction, Boise, Idaho
|
Sletten Construction | $330,000 | 1: $61,000 2: $32,000 3: $15,500 4: $10,500 5: $0 |
|
| 8-25-05 (ak) | 06250 Reroof Brink/Phinney Hall, University of Idaho, Moscow, Idaho | Cobra | $633,225 | ||
| Gillespie | $627,875 | 7-12-05 | |||
| 11-1-05(gs) | 99008 Chiller Replacement, Industrial Administration Building, Department of Administration, Boise, Idaho | Cloverdale Plumbing | $366,050 | ||
| RM Mechanical | $290,231 | 11-4-05 | |||
| Drake Heating & Plumbing | $352,000 | ||||
| 10-26-05(gs) | 04252 Storm Water Treatment Center, University Place, Idaho Falls, Idaho | TMC Contractors | $128,370 - Baysaver 3K $125,670 - Vortechs4000 |
10-27-05 |
|
| 10-25-05(gs) | 06061 Renovate Showers, Units 9, 10, 11, 13-ISCI, Department of Correction, Boise, Idaho | Guho Corp | $746,500 | 1: $76,000 2: $76,000 3: $76,000 |
|
| C2 Construction | $683,226 | 1: $61,152 2: $61,152 3: $61,152 |
|||
| SE/Z Construction | $543,533 | 1: $64,969 2: $64,969 3: $64,969 |
10-28-05 | ||
| 10-20-05 (ak) | 05213 Reroof Student Union Bldg., Boise State University, Boise, Idaho | Contract West | A. $967,100 B. $1,315,300 |
1. $146,200 | |
| Upson Co. | A. $642,200 B. $972,270 |
1. $107,270 | 11-3-05 | ||
| Quality Tile Roofing | A. $698,053 B. $887,553 |
1. $75,016 | |||
| Hobson Fabricating | A. $833,103 B. No Bid |
1. $99,467 | |||
| 10-19-05 (ak) | 06542 25-Yard Pool
Enclosure, LHSF, Lava Hot Springs, Idaho
ALL BIDS REJECTED - OVER BUDGET |
Harris Construction | $494,000 | ||
| Rivers West Construction | $452,000 | ||||
| DeWall Construction | $463,200 | ||||
| MW Construction | $429,850 | ||||
| 10-14-05 (gs) | 06132 HVAC Upgrade, Christofferson Bldg. #3, EITC, Idaho Falls, Idaho | Johnson Controls | $67,506 | 10-17-05 | |
| 10-6-05 (gs) | 02256 Boiler #01 Remodel, Steam Plant, University of Idaho, Moscow, Idaho | 3-H Mechanical | $152,886 | 10-11-05 | |
| RM Mechanical | $164,000 | ||||
| 10-6-05 (gs) | 05065 Expand Kitchen/Dry Food Storage-SICI, Department of Correction, Boise, Idaho | BMI Construction | $420,536 | 1: $9,557 |
10-13-05 |
| C2 Construction | $475,537 | 1: $10,427 2: $25,071 3: $43,104 4: $16,834 5: $18,564 6: $15,175 7: $19,200 8: $7,824 9: $28,471 |
|||
| KEPHA Construction | $424,349 | 1: $27,205 2: $22,653 3: $38,776 4: $7,696 5: $16,768 6: $13,568 7: $17,336 8: $7,233 9: $12,107 |
|||
| 10-4-05 (gs) | 01217 Barnes Towers Window Replacement, Boise State University, Boise, Idaho | Gafford Construction | $214,994 | 1:
$23,832 2: $8,290 |
10-27-05 |
| BMI Construction | $237,808 | 1:
$24,439 2: $8,685 |
|||
| Perkins Construction | $225,696 | 1:
$23,100 2: $8,100 |
|||
| 9-29-05 (ak) | 04206 Interactive
Learning Center, Phase II, BSU, Boise, Idaho
Bid Package #5 |
Hillside Nursery | $68,780 | 6. $36,785 | 11-1-05 |
| ILS | $90,600 | 6. $38,700 | |||
| Bid Package #6 BIDS REJECTED - OVER BUDGET |
TMC, Inc. | $727,400 | |||
| Bid Package #7
BIDS REJECTED - OVER BUDGET |
Steel West, Inc. | $559,159 | 2.5. $10,600 7. $5,720 8. $24,500 |
11-16-05 | |
| Bid Package #9 BIDS REJECTED - OVER BUDGET |
Johnson Brothers | $353,130 | 2.5. $132,375 5. $9,188 7. $266,000 |
11-16-05 | |
| Bid Package #11 | Upson Company | $342,500 | 2.5. $2,360 2.5A. $1,900 3. $580 4. $670 |
||
| Modern Roofing | $246,553 | 2.5. $0 2.5A. $0 3. $0 4. $0 |
|||
| Hobson Fabricating | $192,034 | 2.5. $0 2.5A. $350 3. $350 4. $0 |
11-1-05 | ||
| Bid Package #12 | Cobra Roofing | $387,100 | |||
| Upson Company | $314,830 | ||||
| Modern Roofing | $301,995 | ||||
| Hobson Fabricating | $240,000 | 11-1-05 | |||
| Bid Package #13 BIDS REJECTED - OVER BUDGET |
Architectural Building Supply | $160,130 | 2.5 $8,930 5. $10,840 |
11-16-05 | |
| Bid Package #14 | Overhead Door Company | $9,240 | |||
| Crawford Door | $8,135 | 11-1-05 | |||
| Bid Package #15 | Custom Glass | $896,700 | 2.5. $20,200 5. $1,140 7. ($4,180) |
11-1-05 | |
| Inland Auto Glass | $1,139,634 | 2.5. $11,200 5. $2,475 7. ($2,500) |
|||
| Bid Package #16 | Pac-West Interiors | $962,550 | 2.5. $76,603 4. $18,047 5. $32,501 9. $200 |
11-1-05 | |
| Interior Systems, Inc. | $1,016,526 | 2.5. $55,050 4. $13,820 5. $31,470 9. $0 |
|||
| Bid Package #17 | Creechley Tile | $24,995 | 2.5. $19,702 4. $8,019 |
11-1-05 | |
| Mesa Tile & Stone | $32,050 | 2.5 $41,687 4.$9,250 |
|||
| Bid Package #18 | Great Floors | $147,047 | 2.5. $18,130 5. $34,587 |
||
| Designer Floors, Inc. | $129,000 | 2.5. $17,713 4. $204 5. $18,453 |
|||
| Dillabaugh Floor Covering | $131,085 | 2.5. $16,519 4. $402 5. $19,607 |
|||
| Wall 2 Wall Floor Covering | $96,900 | 2.5. $13,148 4. $342 5. $18,343 |
11-1-05 | ||
| Bid Package #19 | DPC, Inc. | $111,286.29 | 2.5. $12,986.44 4. $2,067.83 5. $4,707.72 7. $0 8. $4,412.52 |
||
| Color Craft Painting | $74,800 | 2.5. $6,700 4. $1,200 5. $2,600 7. $900 8. $980 |
11-1-05 | ||
| Bid Package #20 BIDS REJECTED - OVER BUDGET |
SBI Contracting | $125,000 | 4. $10,000 5. $22,000 |
11-16-05 | |
| Bid Package #24 BIDS REJECTED - OVER BUDGET |
Overhead Door of Idaho | $11,745 | |||
| Bid Package #25 BIDS REJECTED - OVER BUDGET |
BarGreen Ellington | 2.5A. $711,321 | |||
| Bid Package #26 | Northwest Sales & Distributing | $56,290 | 5. $11,428 | ||
| Commercial Window Covering, Inc. | $35,703 | 5. $7,137 | 11-1-05 | ||
| Bid Package #27 BIDS REJECTED - OVER BUDGET |
Nimbus 360 | $852,691.93 | 5. $147,257.82 | ||
| Bid Package #28 | Thyssenkrup Elevator | $163,847 | 9. $156,724 | ||
| Schindler Elevator | $122,700 | 9. $109,800 | 11-1-05 | ||
| Bid Package #29 | TML | $1,667,000 | 2.5. $161,000 2.5A. $64,100 3. $56,100 4. $43,000 5. $60,400 |
||
| RM Mechanical | $1,575,000 | 2.5. $163,900 2.5A. $58,000 3. $48,500 4. $48,850 5. $48,200 |
11-1-05 | ||
| Hobson Fabricating | $1,581,000 | 2.5. $171,000 2.5A. $57,000 3. $49,000 4. $53,000 5. $48,000 |
|||
| DeBest Plumbing | $1,763,184 | 2.5. $204,598 2.5A. $61,400 3. $53,600 4. $61,160 5. $50,774 |
|||
| Bid Package #30 BIDS REJECTED - OVER BUDGET |
Shilo Ssprinkler | $170,000 ($12,000) |
2.5. $6,600 4. $1,200 5. $6,250 |
||
| Bid Package #31 | EsCo | $855,676 ($475) |
2.5. $76,645 2.5A $1,003 3. $1,154 4. $11,254 5. $48,310 7. $9,261 9. $2,830 |
||
| Tri-State | $774,774 ($0) |
2.5. $42,219 2.5A $17,318 3. $1,439 4. $7,592 5. $44,362 7. $8,457 9. $23,331 |
|||
| Lea Electric | $1,005,001 ($500) |
2. $17,446 2.5. $83,497 2.5A $1,196 3. $2,405 4. $13,567 5. $32,744 7. $9,891 9. $2,170 |
|||
| Northwest Electrical | $694,910 ($500) |
2.5. $34,928 2.5A $0 3. $1,213 4. $9,374 5. $49,569 7. $9,490 9. $8,786 |
11-1-05 | ||
| Anderson & Wood Construction | $857,829 ($766) |
2.5. $57,025 2.5A $820 3. $1,706 4. $7,122 5. $56,613 7. $9,226 9. $935 |
|||
| Bid Package #32 BIDS REJECTED - OVER BUDGET |
Siemens | $421,852 | 2.5. $5,800 2.5A. $2,745 3. $7,283. 4. $0 5. $14,749 9. $1,100 |
11-16-05 | |
| Johnson Controls | $433,478 | 2.5. $6,880 2.5A. $2,537 3. $7,608 4. $4,324 5. $23,714 9. $913 |
|||
9-29-05 (gs) |
05032 Remodel Lower Level Offices, Admin. Building, Dept of Agriculture, Boise, Idaho | Kepha Construction | $92,216 | ||
| Perkins Construction | $89,500 | 10-7-05 | |||
| CC Management Group | $98,231 | ||||
| 9-28-05 (ak) | 05285 Advancement Tenant Finish-Out, Capitol Village, BSU, Boise, Idaho | Contractors Northwest, Inc. | $625,950 | 1. $10,800 2. $1,925 3. $1,000 4. $1,200 |
|
| Kepha Construction | $608,461 | 1. $11,602 2. $2,076 3. $1,114 4. $1,904 |
|||
| K-J Corporation | $560,900 | 1. $10,400 2. $1,900 3. $950 4. $800 |
|||
| Jordan/Wilcomb | $605,555 | 1. $11,200 2. $2,000 3. $1,000 4. $1,800 |
|||
| Guho Corp. | $617,000 | 1. $11,680 2. $2,079 3. $1,116 4. $1,907 |
|||
| Perkins Construction | $552,900 | 1. $11,393 2. $2,028 3. $1,088 4. $1,861 |
10-5-05 | ||
| 9-22-05 (ak) | 05209 Stadium Structural Repairs, BSU, Boise, Idaho | Restruction, Corp. | $1,767,517.15 | 1. $57,094.24 2. $39,231.30 3. $13,863 4. $80,410 5. $23,694 |
|
| Tatley & Grund, Inc. | $1,599,990 | 1. $28,081.50 2. $44,455 3. $9,414 4. $70,650 5. $6,765 |
|||
| CDC Restoration & Construction | $2,113,616.25 | 1. $52,618.02 2. $37,287.20 3. $9,391 4. $145,200 5. $19,339.65 |
|||
| RSCI | $1,365,199.58 | 1. $37,660.24 2. $41,755.05 3. $5,485 4. $37,794.55 5. $-0- |
|||
| Western Waterproofing | $1,403,080 | 1. $50,188 2. $32,650 3. $4,959 4. $52,000 5. $9,030 |
11-2-05 | ||
| 9-14-05 (ak) | 06500 Asphalt Pavement Repair, Overlay/New Surfacing, IDL, Cataldo, Idaho | Coeur d'Alene Paving | $30,350 | 9-19-05 | |
| Poe Asphalt | $32,343.68 | ||||
| 9-13-05 (gs) | 05286 Lab Remodel, Room 241, Science & Nursing Bldg, Boise State University, Boise, Idaho | K-J Corporation | $241,381 | $5,900 | |
| Perkins Construction | $221,000 | $6,200 | 9-13-05 | ||
| 9-8-05 (gs) | 04150 Storm Drainage System, Lewis-Clark State College, Lewiston, Idaho | Atlas Sand & Rock, Inc. | $141,712 | A. $55,397 B. $16183 |
9-8-05 |
| A&R Construction | $205,500 | A. $59,000 B. $23,200 |
|||
| M.L. Albright & Sons, Inc. | $257,015 | A. $63,240 B. $21,487 |
|||
| 9-1-05 (ak) | 02541 Dressing Rooms, Lava Hot Springs Foundation, Lava Hot Springs, Idaho | Harris Construction | $789,000 | 1. $9,700 2. $10,500 3. $11,000 |
9-8-05 |
| SE/Z Construction | $889,187 | 1. $10,452 2. $7,709 3. $13,246 |
|||
| Rivers West Construction | $830,500 | 1. $14,700 2. $9,800 3. $11,500 |
|||
| DeWall Construction | $949,000 | 1. $14,990 2. $10,550 3. $11,100 |
|||
| 8-31-05 (ak) | 06170 Reroof Boswell Hall, North Idaho College, Coeur d'Alene, Idaho | Arrow Roofing | $497,000 | 1. $359,000 | 9-8-05 |
| Krueger Sheet Metal | $521,802 | 1. $430,750 | |||
| 8-30-05 (ak) | 06300 Reroof Job Service Bldg., Dept of Commerce & Labor, Pocatello, Idaho | Briggs Roofing | $69,435 | ||
| Modern Roofing & Insulation, Inc. | $78,500 | ||||
| Smith Roofing | $43,800 | 9-7-05 | |||
| Thomas D. Roofing, Inc. | $65,690 | ||||
| 8-24-05 (ak) | 06220 Reroof Leonard Hall Pharmacy Bldg., Idaho State University, Pocatello, Idaho | Robison Roofing | $89,612 | 8-30-05 | |
| Smith Roofing | $132,698 | ||||
| 8-18-05 (ak) | 06360 Reroof Commissary/Dietary Bldg., ISSH, Nampa, Idaho | Pro Tech Roofing | $114,702 | 1. $3,994 2. $7,830 3. $2,628 |
|
| Modern Roofing | $81,350 | 1. $1,800 2. $3,600 3. $1,300 |
8-29-05 | ||
| 8-18-05 (ak) | 06252 Reroof Mines Bldg., University of Idaho, Moscow, Idaho | Gillespie | $113,250 | 8-30-05 | |
| Icon Corp. | $157,000 | ||||
| Missoula Sheet Metal | $125,760 | ||||
| 8-16-05 (ak) | 05504 Office Addition, Dept. of Lands, McCall, Idaho | CC Management Group | $239,440 | ||
| W.T. Seufert, Inc. | $212,500 | 8-29-05 | |||
| 8-4-05 | 05152 Expansion, Industirial Ag Complex, LCSC, Lewiston, Idaho | A & R Construction | $407,448 | ||
| Kenaston Corporation | $415,910 | ||||
| Leone & Keeble | $519,000 | ||||
| S & W Construction | $398,600 | 8-16-05 | |||
| Teel Construction | $470,693 | ||||
| 8-3-05 | 04351 Standby
Generators, H & W Labs, Boise, Idaho ALL BIDS REJECTED |
Romar Electric | $709,850 | #1 $12,790 #2 $11,975 |
|
| Perkins Construction | $840,668 | #1 $15,834 #2 $131,883 |
|||
| Hobson Fabricating | $662,227 | #1 $16,500 #2 $44,946 |
|||
| 8-3-05 | 04301 New Job Service Center, Commerce & Labor, Idaho Falls, ID | Bateman-Hall | $1,750,000 | #1 $12,500 #2 $ 5,000 #3 $32,500 #4 $15,000 #5 $90,000 #6 $ 3,000 #7 $ 6,000 #8 $22,000 |
8-18-05 |
| 8-2-05 (ak) | 04206 Interactive
Learning Center, BSU, Boise, Idaho
Bid Package #1 |
MJ's Backhoe | $434,423 | 1. $147,901 | |
| Paul Construction | $367,190 | 1. $122,793 | |||
| IRA-MAC | $312,748 | 1. $104,800 | 9-12-05 | ||
| Bid Package #2 | Cascade Fence Company | $13,300 | 9-12-05 | ||
| Bid Package #3 | RSCI | $3,054,021 | |||
| Contractors Northwest | $2,355,970 | ||||
| McAlvain Construction | $1,861,100 | 9-12-05 | |||
| Bid Package #4 | Romar Electric | $10,676 | 2. $25,440 | 9-12-05 | |
| Northwest Electrical | $16,454 | 2. $27,732 | |||
| Electric Service & Contracting | $19,744 | 2. $53,796 | |||
| Tri-State Electric | $42,670 | 2. $34,280 | |||
| Commercial Electric | $25,000 | 2. $35,858 | |||
| 7-26-05 (ak) | 05218 Remodel Art Dept, Bldg. #5, Capitol Village, BSU, Boise, Idaho | SE/Z | $367,962 | 1. $28,192 2. $7,603 3. $26,833 4. $24,377 5. $2,095 |
9-12-05 |
| Guho Corp. | $393,652 | 1. $29,287 2. $7,224 3. $26,654 4. $22,954 5. $2,231 |
|||
| K-J Corp. | $381,500 | 1. $28,700 2. $8,900 3. $42,800 4. $27,800 5. $1,900 |
|||
| Perkins Construction | $375,800 | 1. $28,400 2. $7,000 3. $20,900 4. $25,900 5. $1,800 |
|||
| Excelsior Construction | $383,000 | 1. $27,800 2. $6,900 3. $23,900 4. $25,600 5. $1,100 |
|||
| 7-26-05 (ak) | 06110 Reroof Lower Roof, Old Administration Building, ISDB, Gooding, Idaho | Modern Roofing | $120,542 | ||
| Wilson Rooifng | $120,827 | ||||
| Smith Roofing | $105,818 | ||||
| Robison Roofing | $91,500 | 8-1-05 | |||
| Summit | $99,700 | ||||
| 7-28-05 | 05284 Varsity Center Infill, BSU, Boise, Idaho | Excelsior Construciton | $219,000 | ||
| SE/Z Construction | $198,892 | ||||
| McAlvain Construction | $193,711 | 8-3-05 | |||
| Perkins Construction | $202,000 | ||||
| 7-22-05 | 03400 Replace Heat Pumps, Phase I, PTF, State Hospital South, Blackfoot, Idaho | Bingham Mechanical | $388,000 | 1. $95,000 2. $87,000 3. $92,000 4. $99,000 |
7-26-05 |
| Lewis Mechanical | $391,500 | 1. $97,200 2. $88,100 3. $92,800 4. $101,500 |
|||
| 7-18-05 (ak) | 05330 Renovate Armory, Division of Military, Emmett, Idaho | Excelsior Construction | $439,000 | 1. $51,200 2. $11,918 3. $13,900 4. $15,300 5. $ 8,600 |
|
| Gafford Construction | $453,216 | 1. $20,913 2. $12,321 3. $15,571 4. $17,875 5. $ 8,001 |
7-26-05 | ||
| RSCI | $456,541 | 1. $52,470 2. $12,989 3. $13,395 4. $17,050 5. $ 9,923 |
|||
| SE/Z | $477,810 | 1. $23,122 2. $11,520 3. $12,594 4. $16,504 5. $ 7,950 |
|||
| 7-12-05 (ak) | 05253 Renovate Renfrew Hall, Phase VI, UI, Moscow, Idaho | Contractors Northwest | $729,000 | 1. $22,830 2. $19,960 3. $21,120 4. $11,120 5. $12,722 |
7-21-05 |
| KOP Construction | $762,166 | 1. $23,399 2. $20,495 3. $21,668 4. $11,938 5. $13,490 |
|||
| Teel Construction | $763,953 | 1. $24,444 2. $20,771 3. $21,979 4. $11,424 5. $13,038 |
|||
| 7-7-05 (ak) | 06251 Reroof Ridenbaugh Hall, University of Idaho, Moscow, Idaho | Kenaston Corp. | $189,506 | ||
| Contractors NW | $117,175 | ||||
| RMR Construction, LLC | $100,000 | 7-12-05 | |||
| 7-7-05 | 05061 Domestic Water Storage System Upgrade, Dept. of Correction, Boise, Idaho | Star Construction | $140,635 | 1. $14,238 2. $14,238 3. $10,344 |
7-8-05 |
| Challenger Co. | $159,745 | 1. $18,040 2. $18,040 3. $10,295 |
|||
| 7-6-05 |
03500 Parking Lot Overlay, Mica Forest Protective Dist., Coeur d'Alene, Idaho | Poe Asphalt | $50,000 | ||
| Coeur d'Alene Paving | $40,408.87 | 7-18-05 | |||
| Interstate Asphalt | $50,974 | ||||
| 7-1-05 (ak) | 05214 West Campus Parking Lots, BSU, Nampa, Idaho | Paul Construction | $98,300 | 1. $29,000 2. $25,000 3. a. $12,136 b. $3,280 c. $2,624 4. a. $3,900 b. $1,500 c. $1,200 5. $4,500 |
7-8-05 |
| 6-28-05 (ak) | 05255 Mechanical System Upgrade, Phase II, ISU / UI, University Place, Idaho Falls, Idaho | Siemens | $77,851 | 1. $ 9,972 2. $30,257 3. $ 4,350 |
7-20-05 |
| 5-31-05 (ak) | 05504 Rebid Office
, Addition/Parking Lots, Dept. of Lands, McCall, Idaho
Bids Rejected - Over Budget |
W.T. Seufert | $299,500 | ||
| 6-29-05 | 04082 Rock Creek
Interpretive Center, ISHS, Hansen, Idaho
ALL BIDS REJECTED - OVER BUDGET |
Ralph Thornton Construction | $268,320 | 1. $4,970 2. $6,800 3. $3,682 4. $1,290 |
|
| 6-23-05 | 05212 Site Demolition, Block 7 & 10, Boise State University, Boise, Idaho | Ideal Demolition Services, Inc. | $309,700 | ||
| C & C Salvage & Demolition | $337,571 | ||||
| Magnum Demolition | $271,500 | 6-23-05 | |||
| 6-21-05 (ak) | 05253 Renovate Renfrew
Hall, Ph VI, Universityof Idaho, Moscow, Idaho
ALL BIDS REJECTED - OVER BUDGET |
T.W. Clark Construction | $798,600 | 1. $23, 700 2. $21,600 3. $22,000 4. $13,000 5. $15,000 |
|
| Contractors Northwest | $697,000 | 1. $22,000 2. $21,300 3. $18,000 4. $22,000 5. $15,000 |
|||
| KOP Construction | $753,276 | 1. $24,411 2. $22,617 3. $23,413 4. $13,723 5. $15,778 |
|||
| Teel Construction | $756,862 | 1. $25,294 $ $22,531 3. $23,334 4. $16,904 5. $14,999 |
|||
| 6-15-05 (ak) | 02261 Teaching & Learning Center, Bid Package #3, Signage Package, UI, Moscow, Idaho | Doty | $66,000 | 1. $2,500 2. $9,000 3. $7,500 4. $15,000 |
7-6-05 |
| NW Engraving | $32,729 | 1. $3,032 2. $5,940 3. $ - 0 - 4. $17,115 |
|||
| 6-15-05 (ak) | 01222 Rebid
Multi-Use Complex, Ph IV, ISU, Pocatello, Idaho BP #28 |
Intermountain Design | $108,969 | 6-22-05 | |
| Saxton Bradley | $118,767 | ||||
| Partition Specialties | $123,700 | ||||
| PB #31 All Bids Rejected - Over Budget |
Bargreen-Ellingson | $1,531,475 | |||
| Bintz | $1,392,389 | ||||
| J & V Restaurant Supply | $1,498,000 | ||||
| 6-14-05 (ak) | 05214 West Campus
Parking Lots, Boise State University, Nampa, Idaho All Bids Rejected - Over Budget |
Paul Construction, Inc. | $615,521 | 1. $21,000 2. $13,650 3. $9,900 4. a. $30,000 b. $15,000 5. a. $49,600 b. $19,000 |
|
| Guho Corporation | $683,321 | 1. $21,256 2. $21,178 3. $10,416 4. a. $13,414 b. $10,122 5. a. $26,085 b. $19,231 |
|||
| 6-7-05 | 05223 Repair Terra Cotta, 2 Buildings, ISU, Pocatello, Idaho | Hydro Tech, Inc. | $139,500 | 6-16-05 | |
| Rivers West Construction | $147,500 | ||||
| 6-7-05 (ak) | 05222 Repair
Exterior Wall, Eli Oboler Library, ISU, Pocatello, Idaho
All Bids Rejected - Over Budget |
Hydro Tech, Inc. | $542,000 | ||
| Rivers West Construction | $497,000 | ||||
| 06-01-05 | 05091 Campus Firelane, CSI, Twin Falls, Idaho | Durham | N/A | 1. $49,376.50 2. $25,558.42 3. $47,035.98 4. $55,093.67 |
7-7-05 |
| 5-26-05 (ak) | 05252 Renovate Library Elevator, University of Idaho, Moscow, Idaho | Kenaston Corp | $215,720 | 1. $ 4,494 2. $17,891 |
|
| A&R Construction | $203,485 | 1. $ 4,614 2. $16,600 |
6-17-05 | ||
| Teel Construction | $221,947 | 1. $ 4,500 2. $17,259 |
|||
| 5-25-05 (ak) | 04331 Renovation, St. Anthony Armory, Military Division, St. Anthony, Idaho | Vern Clark | $829,000 | 1. $ 40,500 2. $153,000 3. $ 30,000 4. $ 24,000 |
|
| Double E | $742,000 | 1. $ 38,045 2. $149,640 3. $ 55,750 4. $ 26,145 |
6-15-05 | ||
| SE/Z Construction | $829,168 | 1. $ 49,425 2. $115,586 3. $ 1,647 4. $ 23,605 |
|||
| 5-23-05 (ak) | 05231 Audio/Visual Equipment, Performing Arts Center, ISU, Pocatello, Idaho | General Communication | $426,926 | 1. $81,850 | 5-26-05 |
| 5-18-05 (ak) | 04200 Rebid Door Access/Security System, Ph I, BSU, boise, Idaho | Perkins Construction | $177,550 | 1. $ 2,885 2. $19,080 3. $17,164 4. $29,216 5. $25,197 6. $22,770 7. $26,972 8. $26,260 9. $29,313 10. $24,090 |
5-27-05 |
| 5-17-05 (ak) | 04320 New Computer/Server Rm., 2nd Floor Office/Warehouse, ISLD, Boise, Idaho | Guho Corp. | $98,905 | 5-25-05 | |
| Gafford Construction | $99,399 | ||||
| CC Management Group | $116,943 | ||||
| Perkins Construction | $103,400 | ||||
| 5-17-05 (ak) | 04320 New Computer/Server Rm., 2nd Floor Office/Warehouse, ISLD, Boise, Idaho | Guho Corp. | $98,905 | 5-25-05 | |
| Gafford Construction | $99,399 | ||||
| CC Management Group | $116,943 | ||||
| Perkins Construction | $103,400 | ||||
| 5-26-05 (ak) | 05252 Renovate Library Elevator, University of Idaho, Moscow, Idaho | Kenaston Corp | $215,720 | 1. $ 4,494 2. $17,891 |
|
| A&R Construction | $203,485 | 1. $ 4,614 2. $16,600 |
6-17-05 | ||
| Teel Construction | $221,947 | 1. $ 4,500 2. $17,259 |
|||
| 5-25-05 (ak) | 04331 Renovation, St. Anthony Armory, Military Division, St. Anthony, Idaho | Vern Clark | $829,000 | 1. $ 40,500 2. $153,000 3. $ 30,000 4. $ 24,000 |
|
| Double E | $742,000 | 1. $ 38,045 2. $149,640 3. $ 55,750 4. $ 26,145 |
6-15-05 | ||
| SE/Z Construction | $829,168 | 1. $ 49,425 2. $115,586 3. $ 1,647 4. $ 23,605 |
|||
5-23-05(ak) |
05231 Audio/Visual Equipment, Performing Arts Center, ISU, Pocatello, Idaho | General Communication | $426,926 | 1. $81,850 | 5-26-05 |
| 5-18-05 (ak) | 04200 Rebid Door Access/Security System, Ph I, BSU, boise, Idaho | Perkins Construction | $177,550 | 1. $ 2,885 2. $19,080 3. $17,164 4. $29,216 5. $25,197 6. $22,770 7. $26,972 8. $26,260 9. $29,313 10. $24,090 |
5-27-05 |
| 5-17-05 (ak) | 04320 New Computer/Server Rm., 2nd Floor Office/Warehouse, ISLD, Boise, Idaho | Guho Corp. | $98,905 | 5-25-05 | |
| Gafford Construction | $99,399 | ||||
| CC Management Group | $116,943 | ||||
| Perkins Construction | $103,400 | ||||
| 5-17-05 (ak) | 04532 Rebid Security Fence, Juvenile Corrections Center, Lewiston, Idaho | Kenaston Corp. | $123,609 | 1. $10,403 | |
| NW Fence | $125,394 | 1. $3,400 | 6-16-05 | ||
| 4-29-05 | 03223 Increase Steam Capacity, Central Heating Plant, ISU, Pocatello, Idaho | Atlas | $739,390 | 1. $11,180 2. $99,528 3. $78,330 4. $40,880 |
|
| Lewis | $540,000 | 1. $7,200 2. $95,965 3. $75,380 4. $43,700 |
5-24-05 | ||
| Bingham | $495,000 | 1. $7,800 2. $92,800 3. $78,600 4. $42,000 |
|||
| 4-29-05 (ak) | 05224 Repair External Ledges, Garrion Hall, ISU, Pocatello, Idaho | R.E. Beck Construction | $141,545 | 1. $3,810 2. $1,270 3. $1,385 4. $ 897 |
|
| Rivers West | $88,165 | 1. $10,890 2. $ 3,630 3. $ 7,005 4. $ 1,579 |
5-2-05 | ||
| 4-28-05 (ak) | 05400 Re-bid Reroof "A" Building, State Hospital South, Blackfoot, Idaho | Robison Roofing | $183,843 | 1. $53,460 | 5-9-05 |
| Modern Roofing | $218,309 | 1. $57,743 | |||
| Smith Roofing | $184,100 | 1. $64,200 | |||
| Contract West Roofing | $226,100 | 1. $61,000 | |||
| Wilson Roofing | $227,315 | 1. $64,054 | |||
| 4-14-05 (ak) | 04206 Interactive
Learning Center, Sattellite Dish Relocation, BSU, Boise, Idaho
Bid Package #1 |
Asbestos Abatement |
$21,777 |
4-18-05 | |
Bid Package #2 |
Precision Finish | $4,300 | 4-18-05 | ||
Bid Package #3 |
K B Fabrication | $29,300 | 4-18-05 | ||
| Bid Package #4 | Quality Tile Roofing | $44,623 | |||
| Upson Company | $31,931 | 4-18-05 | |||
Bid Package #5 |
Precision Finish | $1,600 | 4-18-05 | ||
Bid Package #6 |
RM Mechanical | $17,864 | |||
| Hobson Fabricating | #13,000 | 4-18-05 | |||
Bid Package #7 |
Electric Service | $141,702 | 4-18-05 | ||
| Romar Electric | $148,860 | ||||
| 4-13-05 (ak) | 04541 New Storage Building, Dept. of Parks & Rec, Boise, Idaho | Gafford Construction | $229,137 | 1. $ 2, 632 2. $14,985 |
|
| SE/Z Construction | $223,773 | 1. $ 2,475 2. $13,601 |
|||
| K-J Corporation, Inc. | $224,000 | 1. $ 3,225 2. $9,200 |
|||
| Perkins Construction | $210,745 | 1. $ 2,300 2, $15,000 |
4-22-05 | ||
| 4-6-05(ak) BID REJECTED | 05362 Install New
HVAC System, Dietary/Commissary, ISSH, Nampa, Idaho |
Drake Mechanical | $169,809 | 1. $22,927 | |
| 4-7-05 | 05229 Replacement
of Two Rooftop Air Conditioners, Museum of Natural History
Building, ISU, Pocatello, Idaho |
Lewis | $80,500 | 4-22-05 | |
| B & S Boiler | $76,875 | ||||
| Economy | $87,000 | ||||
| 4-1-05
(ak) ALL BIDS WERE REJECTED
|
02541 New Dressing
Rooms, Lava Hot Springs Foundation, Lave Hot Springs, Idaho
|
DeWall Construction
|
$1,027,000
|
1. $49,600 2. $5,050 3. $3,333 4. $39,540 5. $1,590 6. $7,220 7. $13,300 |
|
| SE/Z Construction
|
$1,143,443
|
1. $48,118 2. $5,352 3. $3,200 4. $52,103 5. $1,280 6. $8,851 7. $13,971 |
|||
| 3-29-05 (ak) | 04332 Rebid Renovate Armory, Phase III, Division of Military, Gooding, Idaho | Perkins | $424,900 | 1. $105,192 2. $ 41,438 3. $ 12,931 4. $ 32,329 5. $ 19,309 |
|
| Hayes | $336,525 | 1. $133,275 2. $ 27,464 3. $ 10,432 4. $ 29,816 5. $ 19,117 |
4-12-05 | ||
| WCI | $349,702 | 1. $156,555 2. $ 40,444 3. $ 11,739 4. $ 32,462 5. $ 21,106 |
|||
| Walton, Inc.
|
$406,187
|
1. $111,870 2. $ 35,980 3. $ 10,780 4. $ 26,760 5. $ 18,188 |
|||
| 3-24-05
(ak) |
05111 HVAC, Old
Admin. Bldg., ISDB, Gooding, Idaho |
Sawtooth Sheet Metal |
$190,857 |
1. $15,925 |
4-19-05 |
| Bowmans, Inc. | $205,267 | 1. $16,093 | |||
| Hobson Fabricating | $202,500 | 1. $11,300 | |||
| 3-23-05
(ak)
|
04213 Remodel Math/Geosciences Rm 207, BSU, Boise, Idaho | Luekenga Construction
|
$633,964
|
1. $4,116 2. $4,201 3. $4,000 |
4-26-05 |
| Gafford Construction
|
$691,189
|
1. $ 9,348 2. $13,463 3. $ 2,945 |
|||
| Perkins Construction |
$638,000
|
1. $4,100 2. $4,600 3. $1,921 |
|||
| SE/Z Construction
|
$629,752
|
1. $ 8,775 2. $13,071 3. $ 8,000 |
|||
| K-J Corporation
|
$659,200
|
1. $ 9,200 2. $12,400 3. $ 3,000 |
|||
| 3-10-05
(ak) ALL BIDS REJECTED!
|
05231 Audio/Visual Equipment, Performing Arts Center, ISU Pocatello, Idaho | AATronics |
$549,900 |
||
| AIC Solutions |
$412,542 |
||||
| General Communications |
$493,249 |
||||
| SPL |
$680,737.90 |
||||
| 4-20-05 | 03193 HVAC Upgrade and Chiller Replacement, Science and Nursing Building #072, BSU, Boise, Idaho | Hobson | $740,000 | 1. $10,163 2. $27,148 3. 0 4. $82,901 |
|
| YMC, Inc. | $742,468 | 1. $20,786 2. $22,056 3. 0 4. $81,528 |
|||
| Perkins | $752,262 | 1. $16,774 2. $20,000 3. 0 4. $57,200 |
|||
| 4-19-05 | 04301 I New Job Service Center, Idaho Falls, Idaho | Arrington Construction | $1,922,180 | 1. $66,678 2. $11,247 3. $8,764 4. $7,564 5. $7,965 |
|
| Bateman Hall | $1,898,000 | 1. $72,500 2. $12,500 3. $5,700 4. $4,500 5. $9,000 |
|||
| Double E Construction | $1,850,985 | 1. $68,155 2. $18,871 3. $10,380 4. $2,110 5. $14,771 |
|||
| Ormond Builders | $1,811,438 | 1. $64,713 2. $11,804 3. $4,604 4. $3,806 5. $8,104 |
|||
| SE-Z Construction | $1,789,487 | 1. $62,885 2. $10,531 3. $4,641 4. $3,675 5. $8,153 |
|||
| Harris, Inc. | $1,823,000 | 1. $67,000 2. $11,000 3. $4,600 4. $3,900 5. $14,000 |
|||
| 4-14-05 | 02262 University of Idaho, Continuing Education Building Elevator Addition, Moscow, Idaho | Arnzen Construction | $469,400 | 1. $24,000 | |
| 4-5-05 | 05228 Replace Heating Coils, College of Business Building - ISU, Pocatello, Idaho | Lewis Corporation | $85,000 | 4-7-05 | |
| B & S Boiler Inc. | $71,709 | ||||
| 3-29-05
|
04201 Stand-By Generator, Telecomm Room, Heat Plant, BSU, Boise, Idaho | Town and Country
Electric |
$49,044 |
4-21-05 | |
| Power Electric | $42,575 | ||||
| 3-24-05
|
05094 Replace Air Handler, Canyon Building, CSI, Twin Falls, Idaho | Reis Plumbing &
Heating, Inc.
|
$56,682
|
1. $34,660 2. $1,415
|
4-1-05
|
| Hobson Fabricating |
$57,400 |
1. $36,500 2. $2,200 |
|||
| RM Mechanical |
$61,500 |
1. $37,300 2. $4,915 |
|||
| Sawtooth Sheet Metal |
$55,535
|
1. $33,980 2. $1,260 |
|||
| 3-18-05
|
05131 Boiler
Replacement/Direct Digital Control-Sessions Building, EITC, Idaho
Falls, Idaho |
Atlas
|
$69,960
|
3-25-05
|
|
| B & S Boiler | $53,945 | ||||
| Bingham Mechanical |
$53,350 | ||||
| 3-17-05
|
05380 Replace Water/Sewer/Fire Lanes, DHW, SHN, Orofino, Idaho | Curry, Inc.
|
$82,615
|
1. $50,934 2. $48,424 3. $56,822 |
4-29-05 |
| Crea Construction
|
$65,370
|
1. $21,350 2. $17,210 3. $17,475 |
|||
| River View
|
$65,681
|
1. $18,600 2. $14,000 3. $13,800 |
|||
| S & L Underground
|
$95,000
|
1. $38,000 2. $32,000 3. $33,000 |
|||
| A & R Construction
|
$89,000
|
1. $26,100 2. $18,500 3. $21,000 |
|||
| 3-17-05
|
03400 Replace Heat
Pumps, Phase I , DHW, PTF, SHS, Blackfoot, Idaho |
Bingham Mechanical |
$543,000 |
1. $84,000 2. $94,000 |
|
| 3-9-05
|
05510 Carpet
Replacement, Dorm/Cafeteria, ISP, Meridian, Idaho |
Great Floors
|
$13,777
|
1. $15,700 2. $15,700 3. $2,500 4. $2,500 |
May 10, 2005 |
| Contract Floors
|
$12,720
|
1. $16,845 2. $18,703 3. $2,012 4. $2,012 |
|||
| Master Craft
Contractors
|
$16,600
|
1. $20,300 2. $20,900 3. $20,950 4. $20,900 |
|||
| Designer Floors
|
$15,745
|
1. $16,745 2. $17,333 3. $1,748 4. $1,748 |
|||
| 3-9-05
|
05510 Carpet
Replacement, Dorm/Cafeteria, ISP, Meridian, Idaho |
Great Floors
|
$13,777
|
1. $15,700 2. $15,700 3. $2,500 4. $2,500 |
|
| Contract Floors
|
$12,720
|
1. $16,845 2. $18,703 3. $2,012 4. $2,012 |
|||
| Master Craft
Contractors
|
$16,600
|
1. $20,300 2. $20,900 3. $20,950 4. $20,900 |
|||
| Designer Floors
|
$15,745
|
1. $16,745 2. $17,333 3. $1,748 4. $1,748 |
|||
| 3-2-05
|
02208 Lecture Hall
Renovation, RM 112, Education Building, BSU, Boise, Idaho
|
CCMG
|
$118,446.00
|
1. $44,421 2. $3,858 3. $10,118 4. $1,607 5. $4,045 |
3-16-05
|
| Gafford
|
$140,938
|
1. $45,247 2. $3,903 3. $8,165 4. $4,110 5. $8,051 |
|||
| KJ
|
$148,265
|
1. $53,062 2. $4,295 3. $11,256 4. $4,750 5. $8,855 |
|||
| Luekenga
|
$138,153
|
1. $42,253 2. $3,808 3. $7,920 4. $4,865 5. $11,300 |
|||
| KEPHA
|
127,252
|
1. $47,050 2. $3,760 3. $6,870 4. $3,710 5. $7,753 |
|||
| 3-1-05
|
02402 Replacement Sewer Line, SHS, DHW, Blackfoot, Idaho | Accelerated Paving
|
$24,990
|
||
| Rising River |
$22,932 |
4-1-05 | |||
| 2-23-05
|
04204 Air Handling System, Liberal Arts Photo Lab, BSU, Boise, Idaho | Hobson
|
$54,000
|
4-1-05 | |
| Perkins |
$62,100 |
||||
| 2-22-05
|
05012 Computer Room Cooling System Upgrade, ADM, LBJ Building, Boise, Idaho | R M
|
$27,210
|
||
| Ridgeway |
$22,602 |
||||
| TML |
$33,900 |
||||
| Hobson |
$23,800 |
||||
| 1-19-05 |
01194 West Campus First Academic Building, Bid Package #36 | Power Plus, Inc.
|
32,948
|
||
| Lea Electric
|
$34,600
|
||||
| 3-2-05
|
02208 Lecture Hall
Renovation, RM 112, Education Building, BSU, Boise, Idaho
|
CCMG
|
$118,446.00
|
1. $44,421 2. $3,858 3. $10,118 4. $1,607 5. $4,045 |
3-16-05
|
| Gafford
|
$140,938
|
1. $45,247 2. $3,903 3. $8,165 4. $4,110 5. $8,051 |
|||
| KJ
|
$148,265
|
1. $53,062 2. $4,295 3. $11,256 4. $4,750 5. $8,855 |
|||
| Luekenga
|
$138,153
|
1. $42,253 2. $3,808 3. $7,920 4. $4,865 5. $11,300 |
|||
| KEPHA
|
127,252
|
1. $47,050 2. $3,760 3. $6,870 4. $3,710 5. $7,753 |
|||
| 3-1-05
|
02402 Replacement Sewer Line, SHS, DHW, Blackfoot, Idaho | Accelerated Paving
|
$24,990
|
||
| Rising River |
$22,932 |
4-1-05 | |||
| 2-23-05
|
04204 Air Handling System, Liberal Arts Photo Lab, BSU, Boise, Idaho | Hobson
|
$54,000
|
||
| Perkins |
$62,100 |
||||
| 2-22-05
|
05012 Computer Room Cooling System Upgrade, ADM, LBJ Building, Boise, Idaho | R M
|
$27,210
|
||
| Ridgeway |
$22,602 |
||||
| TML |
$33,900 |
||||
| Hobson |
$23,800 |
||||
| 1-19-05 |
01194 West Campus First Academic Building, Bid Package #36 | Power Plus, Inc.
|
32,948
|
||
| Lea Electric
|
$34,600
|
||||
| 4-7-05 (ak) | 04200 Door Access/Security, Phase I, BSU, Boise, Idaho | Integrated Security Resources | $279,500 | 0. $9,360 1. ($4,400) 2a. $29,572 2b. ($430) 3a. $26,535 3b. ($380) 4a. $31,973 4b.($460) 5a. $29,046 5b. ($360) 6a. $32,199 6b. ($420) 7a. $22,750 7b. ($380) |
|
| AIC Solutions | $97,059 | 0. $3,239 1. $0 2a. $15,367 2b. $0 3a. $13,126 3b. $0 4a. $12,621 4b. $0 5a. $13,667 5b. $0 6a. $12,642 6b. $0 7a. $8,454 7b. $0 |
|||
| 2-23-05 (ak) | 04310 Interior/Exterior Finishes, IDFG, Coeur d'Alene, Idaho | Northcon, Inc. | $18,480 | 1. $2,340 | |
| S & S Coatings, Inc. | $25,992 | 1. $2,910 | |||
| Stockwell Painting | $27,398 | 1. $4,360 | |||
| Spectrum Coating, Inc. | $17,887 | $1,900 | 2-28-05 | ||
| 2-23-05 (ak) ALL BIDS REJECTED: Being combined with 04206 | 05281 Relocate Satellite Dishes, BSU, Boise, Idaho | CM Company, Inc. | $275,937 | ||
| Ellsworth Kinkaid | $321,601 | ||||
| Perkins Construction | $281,100 | ||||
| 2-22-05 (ak) | 05067 Rebid, Repair/Replace Sallyport Gates, PWCC, Dept. of Correction, Pocatello, Idaho | Walton, Inc. | $164,900 | ||
| R.E. Beck Construction | $127,539 | 3-18-05 | |||
| Brennan Construction | $162,800 | ||||
| 2-9-05(ak) ALL BIDS REJECTED: Will rebid at a later date. |
04332 Renovate Armory, Phase III, Div. of Military, Gooding, Idaho | Hayes Construction | $392,334 | 1. $142,855 2. $ 26,719 3. $ 10,432 4. $ 29,816 5. $ 19,692 |
|
| Walton, Inc. | $532,712 | 1. $ 82,056 2. $ 36,522 3. $ 10,780 4. $ 27,097 5. $ 19,127 |
|||
| Perkins Construction, Inc. | $475,900 | 1. $105,000 2. $ 41,400 3. $ 12,900 4. $ 31,700 5. $ 19,800 |
|||
| WCI Construction Specialties | $415,369 | 1. $198,106 2. $ 40,318 3. $ 11,702 4. $ 32,361 5. $ 21,673 |
|||
| Starr Corporation | $465,200 | 1. $180,000 2. $ 28,500 3. $ 10,300 4. $ 30,900 5. $ 19,100 |
|||
| 2-8-05 (ak) | 03110 Fire Sprinkler Upgrades/System Improvements, IDBS, Gooding, Idaho | Treasure Valley Fire Protection | $355,000 | 1. $12,800 2. $17,900 |
|
| Shilo Automatic Sprinkler, Inc. | $340,000 | 1. $18,200 2. $16,400 |