Bid Date |
Project
Number and Name |
Contractor
|
Base
Bid
|
Alternates
|
Awarded
|
| 12-21-04
(ak) BP #21 |
01222 Multi-Use Complex, Phase III Rebid, Bid Package #21, ISU, Pocatello, Idaho | Acoustic Specialties | $344,400 | 1-4-05 | |
| Interior Systems | $749,100 | ||||
| 12-23-04 (ak) | 03332 Renovate/Repair Armory, Division of Military, Bonners Ferry, Idaho | Contractors Northwest, Inc. | $968,000 | 1. $5,000 2. $23,072 3. $16,500 4. $5,387 5. $22,800 |
2-2-05 |
| Western States | $975,000 | 1. $6,000 2. $23,000 3. $20,000 4. $15,000 5. $23,000 |
|||
| T.W. Clark | $1,042,000 | 1. $4,000 2. $30,500 3. $17,000 4. $3,900 5. $23,300 |
|||
| Burton Construction | $1,093,400 | 1. $5,500 2. $21,300 3. $18,600 4. $6,100 5. $28,300 |
|||
| 12-21-04 |
05067 Replace Sally Port Gates, Dept. of Correction, PWCC, Pocatello, Idaho | Wolton, Inc. | $167,100 | All bids rejected; to be bid at a later date | |
| R.E. Beck Construction | $288,676 | ||||
| 11-30-04 | 2005-2007 Regional Roofing Service Contract-Statewide | Wilson Roofing | $ 22,712.00 East |
||
| Roman Roofing | $ 22,504.00 West |
||||
| S & S Roofing, Inc | non-responsive bid-no bid bond | ||||
| Quality Tile Roofing | $ 18,572.00 All Areas |
12-6-04 | |||
| Icon Corp. | $ 26,044.00 North |
||||
| Summit Associates | $ 18,260.00 West |
12-6-04 | |||
| Summit Associates | $ 19,340.00 North |
12-6-04 | |||
| Summit Associates | $ 19,196.00 East |
12-6-04 | |||
| Conwest Inc. | non-responsive bid-no bid bond | ||||
| ProTech Roofing | $ 20,313.00 All Areas |
12-6-04 | |||
| Upson Co. | $ 21,479.60 All Areas |
12-6-04 | |||
| 11-18-04 | 05350 Reroof Human
Development Ctr., DHW, Pocatello, ID |
Robison Roofing | $85,611 | ||
| Modern Roofing | $79,365 | ||||
| Smith Roofing | $65,487 | ||||
| Contract West Roofing | $65,100 | 11-22-04 | |||
| Wilson Roofing | $68,939 | ||||
| 10-14-04 | 04-064 Boise
Woman's Correction Ctr., Department of Corrections, Boise, Idaho |
Dave Allen Construction | Bid Withdrawn | ||
| Guho Corp | $2,022,700 | 1.$140,200 2.$45,600 3.$88,400 4.$19,300 5.$62,500 6.$17,800 7.$12,500 8.$35,850 |
|||
| K-J Corp | $1,954,450 | 1.141,000 2.$49,000 3.$90,000 4.$19,500 5.$59,500 6.$16,500 7.$11,900 8.$34,000 |
|||
| Ormond Builders | $1,915,120 | 1.$135,761 2.$41,524 3.$82,464 4.$18,571 5.$78,684 6.$17,676 7.$11,771 8.$34,605 |
|||
| Perkins Construction | $1,932,000 | 1.$143,000 2.$51,500 3.$71,500 4.$18,200 5.$71,000 6.$70,000 7.$12,000 8.$35,000 |
|||
| Record Steel and Construction | $2,027,010 | 1.$142,810 2.$42,020 3.$76,410 4.$18,950 5.$69,110 6.$18,650 7.$14,690 8.$35,160 |
|||
| SE/Z Construction | $1,970,138 | 1.$137,764 2.$46,119 3.$82,760 4.$18,269 5.$61,202 6.$16,817 7.$14,443 8.$33,992 |
|||
| Valley Design and Construction | $1,881,750 | 1.$132,900 2.$40,400 3.$83,300 4.$18,600 5.$69,900 6.$17,700 7.$11,800 8.$34,200 |
11-18-04 | ||
| 11-24-04 (ak) | 05511 Video Security System Enhancement, ISP, Meridian, Idaho | APEX | 95.0 | 12-15-04 | |
| Integrated Security Resources, Inc. | 88.8 | ||||
| Alarmco | 69.2 | ||||
| 11-18-04 (ak) | 05009 Expand Security Control Center, Dept. of Admin., Boise, Idaho | CCMG | $63,611 | 1. $6,585 | 11-29-04 |
| Luekenga Construction, Inc. | $70,416 | 1. $7,860 | |||
| K-J Corp., Inc. | $67,489 | 1. $6,200 | |||
| Kepha Construction | $69,000 | 1. $6,662 | |||
| 11-3-04 (ak) | 04083 Recording Studio Remodel, Idaho State Library, Boise, Idaho | Gafford Construction | $37,096 | 1. $7,705 2. $4,078 3. $4,587 |
11-5-04 |
| CCMG | $41,445 | 1. $2,298 2. $5,494 3. $3,481 |
|||
| Leukenga Construction, Inc. | Non-Responsive | ||||
| 10-14-04 | 01-194 #34
(Audio Visual System Equipment) West Campus Academic Bldg Boise State University, Boise, Idaho |
A.Atrontics, Inc. | $323,843.04 | 11-8-04 | |
| AIC Solutions, Inc. | $361,734.27 | ||||
| 10-14-04 | 01-194
#35 (Video Conferencing Equipment) West Campus Academic Bldg Boise State University, Boise, Idaho |
A.Atrontics, Inc. | $ 92,365.94 | 1.$52,720.00 | 11-8-04 |
| AIC Solutions, Inc. | $141,934.31 | 1.$91,902.15 | |||
| 10-28-04 | 03380 Rebid Renovate
State Hospital North HVAC, DHW Orofino, Idaho |
Hobson Fabrication | $ 248,946 | 11-3-04 | |
| Apollo, Inc. | $ 400,000 | ||||
| 10-12-04 | 05007-ReBid, Reroof Industrial Admin Building. Dept. of Admin., Boise, Idaho | Quality Tile Roofing | $214,960 | 1. $1,450 2.($65,347) 3. $2,950 |
11-1-04 |
| Modern Roofing | $223,465 | 1.$1,785 2.($65,962) 3. $3,625 |
|||
| Interstate Roofing | $229,450 | 1.$2,100 2.($61,300) 3. $3,625 |
|||
| L.N. Johnson | $31,710 | 1. $15,471 2. $13,647.60 |
|||
| 9-23-04 | 05400 Reroof "A" Building, State Hospital South, Blackfoot, Idaho | Robison Roofing | $363,704 | 1. $131,578 | 11-2-04 Bids Rejected Will rebid Spring 05 |
| Modern Roofing | $298,450 | 1. $66,584 | |||
| Smith Roofing | $285,420 | 1. $63,171 | |||
| Quality Tile | $257,134 | 1. $65,826 | |||
| Wilson Roofing | $285,485 | 1. $60,334 | |||
| 10-7-04 (ak) | 03501 Repair/Replace Pavement, Dept. of Lands, Idaho Falls, Idaho | H-K Contractors | $37,751 | 1. $12,386 2. 4,831 |
10-14-04 |
| 10-14-04 | 04-302 Bldg Demo Idaho Commerce and Labor Idaho Falls, Idaho |
Ferguson 4T | $33,500.00 | 1. $1,000.00 | 10-19-04 |
| 9-30-04 | 05332 Reroof Bldg 810 Gowen Field, Boise, ID | Hobson Fabricating | $69,300. | 1.$33,400 |
|
| Quality Tile Roofing | $75,736 | 1. $43,448 |
|||
| Upson Company | $58,886 | 1. $33,410 |
10-12-04 | ||
| ProTech Roofing, Inc. | $78,669 | 1. $38,982 |
|||
| Madison Roofing | $79,125 | 1. $36,895 |
|||
| Modern Roofing | $73,530 | 1. $42,183 |
|||
| 9-22-04 | 04204 Photo Lab HVAC Upgrade, Liberal Arts Bldg, BSU, Boise, Idaho | Hobson Fabricating | $80,000 | Bids rejected, Will rebid in Spring 05 | |
| 8-24-04 | 04601 Install Glass Walls, Air Lock Entry, Tub/Shower Renovation, Idaho State Veterans Home, Lewiston, Idaho | S & W Construction | $163,187.00 | 1. $26,500.00 2. $26,500.00 |
09-23-04 |
| Keneston Corp. | $183,501.00 | 1. $27,400.00 2. $27,400.00 |
|||
| 9-30-04 (ak) | 04500 Office Addition, Dept. of Lands, Kamiah, Idaho | Redhawk Enterprises | $128,118 | 1. $20,044 2. $11,056 3. $13,556 4. NOT USED 5. $1,250 6. $4,075 7. $4,890 8. $2,694 9. $980 |
|
| Wimer Corporation | $100,378 | 1. $28,729 2. $16,846 3. $16,846 4. NOT USED 5. $6,240 6. $5,640 7. $6,000 8. $4,293 9. $3,500 |
10-5-04 | ||
| S&W Construction | $107,871 | 1. $40,415 2. $12,385 3. $13,791 4. NOT USED 5. $5,148 6. $6,200 7. $6,545 8. $3,402 9. $3,465 |
|||
| Holcomb Construction | $111,230 | 1. $41,275 2. $12,726 3. $15,450 4. NOT USED 5. $6,800 6. $5,750 7. $6,400 8. $3,100 9. $3,500 |
|||
| 9-30-04 (ak) | 04501 Office Addition, Dept. of Lands, Deary, Idaho | Redhawk Enterprises | $80,531 | 1. $8,070 2. $4,990 3. $5,160 4. $3,280 5. $5,394 6. $1,585 7. $2,790 |
|
| D Taylor Construction | $85,500 | 1. $4,400 2. $3,000 3. $2,800 4. $5,500 5. $3,400 6. $1,500 7. $1,800 |
10/5/04 | ||
| 9-9-04 (ak) | 05008 Idaho State Capitol Exterior Restoration, Administration, Boise, Idaho | Guho Corporation | $2,798,200 | 1. $42,237 Deduct 2. $ 9,500 3. $ 3,750 4. $ 5,679 5. $ 5,050 6. $35,000 7. $24,500 |
|
| Hydro-Tech, Inc. | $2,082,000 | 1. $28,000 Deduct 2. $ 7,000 3. $ 6,000 4. $ 5,500 5. $ 5,800 6. $44,000 7. $21,000 |
9-22-04 | ||
| McAlvain Construction | $2,607,000 | 1. $40,000 Deduct 2. $16,500 3. $ 3,050 4. $ 5,300 5. $ 6,400 6. $48,700 7. $20,000 |
|||
| RSCI | $2,085,685 | 1. $33,943 Deduct 2. $ 3,544 3. $ 1,579 4. $ 5,474 5. $ 2,206 6. $49,080 7. $30,729 |
|||
| 9-8-04 (ak) | 04503 PUC Bldg. ADA, Stair/Elevator, Dept. of Lands, Boise, Idaho | Gafford Construction | $152,840 | 1. $6,979 2. $4,339 |
9-14-04 |
| K-J Corporation | $178,155 | 1. $8,338 2. $4,779 |
|||
| KEPHA | $159,961 | 1. $6,836 2. $1,751 |
|||
| 8-24-04 (ak) | 04224 Life Safety, Handrails/Entry Stairs, Idaho State University, Pocatello, Idaho | Rivers West Construction | $224,500 | 1. $ 7,740 2. $21,900 3. $ 4,849 4. $ 2,816 5. $13,000 6. $48,800 |
|
| R.E. Beck Construction | $162,209 | 1. $ 4,447 2. $ 8,080 3. $ 2,860 4. $ 1,408 5. $ 2,529 6. $31,922 |
8-27-04 | ||
| 8-19-04 (ak) | 00363 Remodel Patient/Nursing Building 1R - Pod '372', ISSH, Nampa, Idaho | Perkins Construction | $289,000 | 1. $149,000 | |
| Kepha Construction | $269,000 | 1. $136,555 | |||
| Excelsior Construction Co. | $274,900 | 1. $137,500 | 9-10-04 | ||
| K-J Corporation | $294,800 | 1. $162,800 | |||
| 8-19-04 (ak) | 05030 Replace Hot Water Lines, Dept. of Agriculture, Boise, Idaho | Ridgeway Industrial | $43,160 | 1. $7,115 | 8-23-04 |
| RM Mechanical | $45,996 | 1. $8,770 | |||
| Cloverdale Plumbing | $44,669 | 1. $9,459 | |||
| 8-18-04 (ak) | 05110 Chip Seal Internal Roads/Parking Lots, ISDB, Gooding, Idaho | Emery, Inc. | $29,880 | 1. $5,040 | 8-26-04 |
| 8-17-04 | 05095 Seal Coat Four Parking Lots, CSI, Twin Falls, Idaho | Gordon Paving Co., Inc. | $27,305.00 | ||
| Curtis Clean Sweep, Inc. | $13,677.18 | 8-20-04 | |||
| Imperial Asphalt | $24,978.00 | ||||
| PC Maintenance LLC | $17,500.00 | ||||
| Klingler Asphalt Maintenance | $20,995.00 | ||||
| 8-17-04 | 05080 Partial Re-Roof Idaho Historical Museum, Boise, Idaho | Upson Company | $63,310.00 | ($1,190.00) | |
| Pro-Tech Roofing, Inc. | $55,381.00 | ($ 500.00) | |||
| Modern Roofing | $54,380.00 | $785.00 | |||
| Roman Roofs, Inc. | $52,546.00 | ($1,124.00) | 8-31-04 | ||
| 8-17-04 | 04571 Re-Roofing Supply Bldg., Idaho Dept. of Transportation, Boise, Idaho | Contract West Roofing, Inc. | $156,700.00 | ||
| Hobson Fabricating Corp. | $141,968.00 | ||||
| Roman Roofs, Inc. | $111,246.00 | ||||
| Upson Company | $126,490.00 | ||||
| Pro-Tech Roofing, Inc. | $112,091.00 | ||||
| Quality Tile Roofing, Inc. | $134,256.00 | ||||
| Summit Associates | $108,700.00 | 8-24-04 | |||
| 7-20-04 | 01082 Idaho Historical Society Library, Archives/Administration Addition, Phase 2, Boise, Idaho | Jordan-Wilcomb Construction, Inc. | $3,960,000 | 1) $253,000 2) $ 19,600 3) $133,000 4) $ 28,000 |
|
| McAlvain Construction, Inc. | $3,879,000 | 1) $296,400 2) $ 20,000 3) $137,000 4) $ 30,000 |
|||
| Guho Corp. | $3,895,949 | 1) $289,000 2) $ 21,000 3) $ 95,000 4) $ 32,000 |
|||
| Bateman-Hall, Inc. | $4,169,900 | 1) $260,000 2) $ 17,500 3) $190,000 4) $ 35,000 |
|||
| Ormond Builders, Inc. | $3,848,686 | 1) $260,647 2) $ 15,630 3) $120,519 4) $ 35,978 |
7-28-04 | ||
| RSCI | $3,796,840 | 1) $358,038 2) $ 19,515 3) $179,183 4) $ 30,446 |
|||
| Engineered Structures, Inc. (ESI) | $3,898,000 | 1) $310,000 2) $ 17,000 3) $185,000 4) $ 36,000 |
|||
| Interwest Construction Co., Inc. | $3,863,000 | 1) $241,500 2) $ 16,700 3) $137,500 4) $ 29,800 |
|||
| 6-30-04 | 05360 Re-Roof Ramsey Hall, ISSH, Nampa, Idaho | Modern Roofing | $121,630.00 | ||
| Hobson Fabricating | $ 99,562.00 | ||||
| Upson Company | $82,605.00 | 7-16-04 | |||
| Pro-Tech Roofing | $105,547.00 | ||||
| Summit Associates | $118,900.00 | ||||
| 7-8-04 | 04095 Replace Supply & Return Air Fan in Aspen Building, CSI, Twin Falls, Idaho | Garrett Heating | $14,816.00 | 7-13-04 | |
| 6-15-04 | 04600 Install Entry Glass Walls/Air Lock & Expansion Joints, VETP, Pocatello, Idaho | Vern Clark & Sons | $62,500.00 | 6-28-04 | |
| Rivers West | $74,000.00 | ||||
| RE Beck | $78,350.00 | ||||
| 5-11-04 | 04093 Irrigation Pipe Installation, CSI, Twin Falls, Idaho | Hillside Nursery | $225,182.00 | 1) $18,978.00 | |
| Robert Durham Excavating | $208,600.00 | 1) $15,900.00 | |||
| Paul Construction | $229,716.00 | 1) $29,000.00 | |||
| 7-16-04 | |||||
| 6-29-04 | 03069A Generator for Dorm Unit, Dept. of Corrections, Boise, Idaho | Challenger Electric, Inc. | $44,293.00 | 7-13-04 | |
| L & K Electric | Non-responsive | ||||
| Power Electric, Inc. | $48,257.00 | ||||
| 4-27-04 | 04330 Re-Roof Rigby Armory, Rigby, Idaho | Quality Tile | $264,994 | ||
| Robison Roofing | $274,000 | ||||
| Smith Roofing | $227,944 | 5-6-04 | |||
| CSDI Construction, Inc. | $748,490 | 1) $62,500 2) $62,100 3) $ 3,500 4) $ 8,000 5) $67,000 |
|||
| 6-29-03(ak) | 04205 Lab Remodel, Multi-Purpose Classroom, BSU, Boise, Idaho | Western Pacific Development | $191,500 | ||
| Perkins Construction | $169,700 | 7-13-04 | |||
| 6-17-04
(ak)
BP #8 |
01222 Multi-Use Complex - Phase III Rebid, Idaho State University, Pocatello, Idaho | Keller Construction | $474,900 | ||
| Sletten Construction | 624,000 | ||||
| BP #8A | J. B. Parson | $661,250 | 6. $66.50 / Yd 7. $ .20 / Sq. Ft. 8. $55.00 / Yd 9. $55.00 / Yd 10. $44.00 / Yd 11. $23.00 / Yd 12. $17.00 / Yd 13. $ .47 / Sq. Ft. |
||
| BP #9 | Keller Construction | $722,500 | |||
| BP #10 | Sletten Construction | $5,211,000 | |||
| Ormond Builders | $6,166,767 | ||||
| BP #11 | J.L. England | $1,445,000 | |||
| Pete Mickelsen | $1,283,300 | ||||
| BP #12 | Steel West | $3,309,555 | |||
| BP #14A | Western States Waterproofing | $86,254 | |||
| BP #14B | Robison Roofing | $14,362 | |||
| BP #15 | Mertin's Insulation | $168,000 | |||
| Acoustic Spec. | $169,000 | ||||
| BP #16 | Crawford Door Sales | $69,940 | |||
| BP #17A | Precision Glass | $950,000 | |||
| Inland Glass | $1,276,873 | ||||
| BP #17B | Inland Glass | $1,705,210 | |||
| BP #18 | Beacon Metals | $623,387 | |||
| ABS | $638,940 | ||||
| BP #21 | Interior Systems, Inc. | $782,118 | |||
| BP #22 | Wall-2-Wall | $655,000 | |||
| BP #23 | Davis Tile | $121,700 | |||
| BP #25 | Acoustic Specialties | $54,500 | |||
| BP #26 | Acoustic Spec. | $192,000 | |||
| Industrial Storage System | $210,069.19 | ||||
| BP #32 | Shilo Automatic Sprinkler | $538,500 | |||
| 3-D Fire | $633,669 | ||||
| BP #30 | Thyssenkrupp Elevator | $137,204 | |||
| Schindler Elevator | $185,077 | ||||
| BP #33 | DeBest Plumbing | $1,634,428 | |||
| Williams Plumbing | $1,394,000 | ||||
| Bingham Mechanical | $1,478,000 | ||||
| BP #34 | Bingham Mechanical | $3,725,000 | |||
| Lewis Corp | $3,710,000 | ||||
| DeBest Plumbing | $3,895,709 | ||||
| Hobson Fabricating | $4,046,000 | ||||
| BP #37 | Anderson & Wood | $4,578,000 | |||
| Warbonnet Electric | $3,945,000 | ||||
| Wheeler Electric | $4,356,965 | ||||
| Arco Electric | $4,319,193 | ||||
| 7-1-04 (ak) | 97256 Center for Applied Fish Science, UI, Hagerman, Idaho | Starr Corp | $2,749,000 | 1. $298,000 2. $898,000 3. $259,600 4. $ 38,000 5. $ 46,500 6. $ 54,000 7. $ 8,200 8. $ 4,000 9. $ 9,630 10. $ 27,500 11. $ 7,000 |
|
| RSCI | $2,666,731 | 1. $178,906 2. $869,154 3. $234,338 4. $ 38,818 5. $ 47,538 6. $ 40,621 7. $ 8,081 8. $ 3,913 9. <$ 9,845> Deduct 10. $ 28,476 11. $ 3,314 |
|||
| Harris, Inc. | $2,570,000 | 1. $190,000 2. $800,000 3. $210,000 4. $ 40,000 5. $ 48,000 6. $ 50,000 7. $ 8,400 8. $ 4,000 9. $ 10,000 10. $ 29,000 11. $ 6,000 |
|||
| 6-23-04
(ak)
WC 11-3 |
98240 Rebid Performing Arts Center Concert Hall Finishes, Idaho State University, Pocatello, Idaho | Stagecraft | $81,901.36 | 7-16-04 | |
| Oasis | $86,200 | ||||
| Wheeler | $102,200 | ||||
| WC 6-1 | Moderne | $98,750 | 7-7-04 | ||
| Johnson | $145,000 | ||||
| 6-3-04 (ak) | 03254 Renfrew Hall HVAC Repair, UI, Moscow, Idaho | 3H Mechanical | $719,320 | 1. $32,200 2. $30,994 3. $24,200 |
|
| RM Mechanical | $727,070 | 1. $33,480 2. $30,700 3. $23,925 |
7-15-04 | ||
| SMK Mechanical | $852,000 | 1. $35,800 2. $38,400 3. $29,900 |
|||
| 5-26-04 (ak) | 03194 Storm Water Drainage System, Ph. III, BSU, Boise, Idaho | Bodiford Construction | $221,000 | 1. $16,000 | |
| Sommer Construction | $243,626 | 1. $3,400.75 | |||
| Track Utilities, Inc. | $339,500 | 1. $25,000 | |||
| Owyhee Construction | $395,000 | 1. $45,000 | |||
| Paul Construction | $233,383 | 1. $2,500 | 6-23-04 | ||
| 5-27-04 | 01510 Idaho State Police-Region 4, Field Office Misc. Modifications, Jerome, Idaho | Hayes Construction Co., Inc. | $33,441.36 | 4-20-04 | |
| Engineered Structures, Inc. | $769,000 | 1) $65,727 2) $65,678 3) $ 5,571 4) $ 8,222 5) $71,560 |
|||
| Luekenga Construction, Inc. | $832,747 | 1) $75,805 2) $79,508 3) $ 7,186 4) $ 9,100 5) $82,553 |
|||
| Scott Hedrick Construction, Inc. | $749,900 | 1) $62,900 2) $62,800 3) $ 3,000 4) $ 5,000 5) $68,500 |
|||
| 03-02-04 | 04222 Replace Chiller, Life Science Bldg. "A", ISU, Pocatello, Idaho | Bingham Mechanical, Inc. | $173,000 | 1. $12,000 | |
| Economy Heating | $146,300 | 1. $10,500 | 3-16-04 | ||
| B & S Boiler, Inc. | $189,600 | 1. $14,000 | |||
| LUWA | $165,280 | 1. $12,980 | |||
| 03-02-04 | 03380 Renovate HVAC, SHN, Orofino, Idaho | Hobson Fabricating, Inc. | $84,197.00 | 1.$ 7,000 2.$ 5,700 3.$ 4,000 4.$15,000 5. $ 5,900 |
4-7-04 |
| Guardian Plumbing & Heating, Inc. | $122,068 | 1. $7,674 2. $5,155 3. $6,284 4. $7,549 5. $8,807 |
|||
| Wimer Corporation | $144,200 | ||||
| 6-14-04 | 04060 Replace Roof, Bldgs. A, B, C, IMSI, Boise, Idaho | Hobson Fabricating Corp. | $655,546.00 | $181,928.00 | |
| Upson Company | Non-Responsive | ||||
| Quality Tile Roofing, Inc. | $599,295.00 | $199,731.00 | 6-17-04 | ||
| 6-1-04 | 05130 Re-Roof Christofferson Bldg., EITC, Idaho Falls, Idaho | Quality Roofing | $266,445.00 | ||
| Modern Roofing | $309,260.00 | ||||
| Robison Roofing | $265,939.00 | 6-14-04 | |||
| Smith Roofing | $267,410.00 | ||||
| 6-8-04 | 03007 Access Control System, Capitol Mall, Boise, Idaho | Allied General Fire & Security, Inc. | $166,342.00 | 1) $5,907.00 2) $4,021.00 3) $5,875.00 4) $3,309.00 5) $1,586.00 |
6-10-04 |
| Northwest Electrical Contractors, Inc. | $314,500.00 | 1) $11,000.00 2) $ 4,800.00 3) $12,500.00 4) $ 4,700.00 5) $ 2,500.00 |
|||
| The Security Group | $349,880.00 | 1) $27,254.00 2) $11,434.00 3) $19,270.00 4) $11,617.00 5) $ 7,904.00 |
|||
| 6-10-04 | 04221 Remove PCB Contamination, Reed Gym, ISU, Pocatello, Idaho | NRC Environmental | $198,228.00 | 1) $54,941.00 2) $95,613.00 |
6-14-04 |
| Onyx | $212,332.00 | 1) $63,592.00 2) $64,130.00 |
|||
| 5-26-04 | 04195 Primary Power Distribution Loop Upgrade, BSU, Boise, Idaho | Quality Electric, Inc. | $262,381.00 | $59,728.00 | |
| Northwest Electrical Contractors | Non-Responsive
|
||||
| Anderson & Wood Construction, Inc. | $317,686.76 | $61,797.00 | |||
| Challenger Companies, Inc. | $285,360.00 | $84,410.00 | |||
| Power Plus | $229,787.00 | $52,577.00 | 6-1-04 | ||
| Tri State Electric | $275,564.00 | $61,242.00 | |||
| Track Utilities, Inc. | $250,599.00 | $53,600.00 | |||
| 5-26-04 | 04030 Elevator Replacement, Adm. Bldg., Dept. of Ag, Boise, ID | Bideganeta Construction, Inc. | $103,250.00 | ||
| Gafford Construction, Inc. | $108,924.00 | ||||
| K-J Corp, Inc. | $ 94,660.00 | 6-2-04 | |||
| 5-20-04 | 02258 Reclaimed Water System, UI, Moscow, Idaho | M.L. Albright & Sons, Inc. | $97,150 | 6-10-04 | |
| 4-21-04 (ak) | 04091 Paint Booth Building, Maintenance Dept., CSI, Twin Falls, ID | Hayes Construction Co., Inc. | $174,301 | 1) $(1,662) 2) $16,410 |
6-15-04 |
| Don Anderson Construction, Inc. | $178,500 | 1) $(1,011) 2) $17,900 |
|||
| Stanley Associates, Inc. | $179,900 | 1) $ 6,200 2) $16,870 |
|||
| 4-13-04 (ak) | 04110 Column Replacement, Old Admin. Bldg., IDBS, Gooding, Idaho | Hayes Construction Co. | $46,470 | 1. $55,187 | |
| Bideganeta Construction | $69,500 | 1. $59,500 | |||
| Hamilton Builders, Inc. | $47,434 | 1. $36,525 | 4-26-04 | ||
| 04-7-04 (ak) | 04112 Carpet Replacement, Residential Cottages, ISDB, Gooding, Idaho | Pioneer Floor Carpet 1, | $48,214 | 1. $12,123 2. $12,123 |
|
| Bideganeta Construction, Inc., | $43,250 | 1. $10,800 2. $10,800 |
4-26-04 | ||
| 3-9-04 (ak) | 04532 Security Fencing, Juvenile Corrections Center, Lewiston, Idaho | Kenaston Corporation | $159,967 | 1. $9,971 | All Bids Rejected |
| Custom Fence Company | $277,275 | $5,725 | |||
| Mountain States Fence | $213,000 | 1. $800 | |||
| 2-12-04 | 04251 Reroof Education Bldg. UI, Moscow, Idaho | Cobra Roofing Services | $97,267 | 2-26-04 | |
| I Con Corporation | $124,794 | ||||
| Upson Company | $104,225 | ||||
| Contract West Roofing, Inc. | $143,300 | ||||
| Missoula Sheet Metal | $104,690 | ||||
| 5-4-04 | 04094 Chipseal Campus Roads, CSI, Twin Falls, Idaho | Emery, Inc. | $59,811.00 | 1) $6,686.00 | |
| Kloepfer, Inc. | $50,648.77 | 1) $5,954.75 | 5-13-04 | ||
| 3-18-04 (ak) | 01222 Multi-Use
Complex - Phase III, Idaho State University, Pocatello, Idaho Bid Package #8 |
Layton Construction | $1,260,000 | Unit 5 $39 / Cubic Yard | |
| Keller Construction | $892,500 | Unit 5 $39 / Cubic Yard | |||
| Sletten Construction | $1,200,000 | Unit 5 <$39 / Cubic Yard> deduct | |||
| Bid Package #9 | Keller Construction | $687,500 | |||
| Layton Construction | $810,000 | ||||
| Bid Package #10 | Sletten Construction | $5,625,000 | Unit 5 <$39 / Cubic Yard> deduct | ||
| Layton Construction | $6,100,000 | Unit 5 $39 / Cubic Yard | |||
| Bid Package #11 | JL England | $1,326,000 | |||
| Micklesen & Sons | $1,549,000 | ||||
| Sommer Builders | $1,497,000 | ||||
| Daniels Masonry | $2,728,100 | ||||
| Bid Package #12 | Steel West | $3,510,000 | 3. $6,760 | ||
| Western Steel | 3,760,000 | 3. $6,000 | |||
| Bid Package #13 | Moderne Cabinet | $395,750 | 2. $198,000 4. $ 1,200 5. $ 1,200 |
||
| Johnson Bros. | $386,268 | 2. $254,576 4. $ 1,252 5. $ 1,252 |
|||
| Bid package #14 | Modern Roofing | $923,463 | |||
| Thomas Robison Roofing | $742,000 | ||||
| Quality Tile Roofing | $984,973 | ||||
| Bid Package #15 | ASI | $160,300 | |||
| Bid Package #17 | Inland Auto Glass | $3,908,894 | |||
| Bid Package #18 | ABS | $773,500 | 1. No Bid | ||
| Beacon Metals | $658,573 | 1. $38,245 | |||
| Bid Package #19 | Crawford Doors | $52,750 | |||
| Bid Package #20 | Interior Systems | $5,567,400 | 4. $3,797 5. $4,120 |
||
| ASI | $3,622,000 | 4. $4,930 5. $5,420 |
|||
| Bid Package #22 | Wall 2 Wall | $669,020 | 4. $3,040 5. $2,840 |
||
| Bid Package #23 | Davis Tile | $137,400 | |||
| Bid Package #24 | Ed's Painting | $495,000 | 4. $370 5. $390 |
||
| National Coatings | $657,000 | 4. $356 5. $277 |
|||
| Bid Package #26 | ASI | $205,000 | 4. $1,000 5. $1,000 |
||
| Bid Package #27 | Spitz, Inc. | $157,447 | |||
| Astro-Tech Manufacturing | $148,500 | ||||
| Bid Package #28 | Partition Spec | $158,000 | |||
| Saxton-Bradley | $130,543 | ||||
| Intermountain Design | $118,025.12 | ||||
| Bid package #29 | Alders | $32,735 | |||
| Precision Glass | $35,800 | ||||
| Bid package #30 | Thyssen-Krupp | $258,510 | |||
| Schindler Elevator | $380,541 | ||||
| Bid Package #31 | Bergreen-Ellingson | $1,457,000 | 6. No Bid | ||
| Bartz | $1,354,834 | 6. $16,506 | |||
| US Food Service | $1,273,552.92 | 6. $32,876 | |||
| J & V Restaurant | $1,264,915 | 6. $19,120 | |||
| Bid Package #32 | 3-D Fire | $714,781 | 4. $450 5. $600 |
||
| Shilo Auto Sprinkler | $593,095 | 4. $640 5. $720 |
|||
| Bid Package #33 | DeBest Plumbing | $1,693,535 | |||
| Bid Package #34 | United Team Mech | $4,280,000 | 4. $1,480 5. $1,660 7 $150,076 |
||
| Lewis Corp | $3,880,000 | 4. $ 1,250 5. $ 1,250 7. $162,700 |
|||
| Hobson Fabricating | $3,946,528 | 4. $ 2,860 5. $ 2,875 7. $164,850 |
|||
| DeBest Plumbing | $4,131,495 | 4. $ 3,031 5. $ 3,048 7. $203,838 |
|||
| Bid Package #35 | Environmental Eng. | $76,790 | 4. $250 5. $275 |
||
| Bid Package #36 | Clima Tech | $480,350 | |||
| Johnson Controls | $417,417 | ||||
| Bid Package #37 | Anderson & Wood Construction | $4,879,000 | 4. $6,000 5. $6,000 6. $4,000 |
||
| Lea Electric | $4,871,591 | 4. $6,100 5. $6,100 6. $ 370 |
|||
| Arco Electric | $4,059,300 | 4. $ 8,358 5. $13,238 6. $ 3,306 |
|||
| Wheeler Electric | $4,898,600 | 4. $10,100 5. $10,100 6. $ 660 |
|||
| Warbonnet Electric | $3,550,000 | 4. $3,700 5. $3,700 6. $4,000 |
|||
| 3-23-04 (ak) | 04531 Security Fence, Dept. of Juvenile Corrections, Nampa, Idaho | Custom Fence Co. | $374,216 | Unit Cost: $500 X 20 Cubic Yards |
|
| Ronald W. Van Aucker, Inc. | $226,780 | Unit Cost: $575 X 20 Cubic Yards |
|||
| American Fence Co. | $308,705 | Unit Cost: $50 X 20 Cubic Yards |
|||
| Brice Construction | $181,734 | Unit Cost: $180 X 20 Cubic Yards |
|||
| Kepha Construction | $182,450 | Unit Cost: $85.25 X 20 Cubic Yards |
3-29-04 | ||
| 3-11-04 | 00352 Activity Room Addition, Idaho State Veteran's Home, Pocatello, Idaho | Cannon Builders | $228,850 | 1. $ 5,500 2. $16,000 |
|
| Commercial General Construction | $284,924 | 1. $ 5,658 2. $20,285 |
|||
| DeWall Construction | $233,750 | 1. $ 1,393 2. $11,698 |
|||
| J & S Construction | $259,900 | 1. $ 4,200 2. $15,900 |
|||
| R.E. Beck Construction | $225,684 | 1. $ 3,300 2. $14,052 |
4-9-04 | ||
| Rivers West Construction | $262,367 | 1. $ 4,649 2. $13,850 |
|||
| 4-21-04 | 04091 Paint Booth Building, Maintenance Dept., CSI, Twin Falls, ID | Hayes Construction Co., Inc. | $174,301 | 1) $(1,662) 2) $16,410 |
|
| Don Anderson Construction, Inc. | $178,500 | 1) $(1,011) 2) $17,900 |
|||
| Stanley Associates, Inc. | $179,900 | 1) $ 6,200 2) $16,870 |
|||
| 4-13-04 | 03204 BSU-Science & Nursing 4th Floor Remodel, Boise, Idaho | Perkins Construction, Inc. | $745,400 | 1) $62,000 2) $61,800 3) $ 5,000 4) $ 5,400 5) $69,500 |
4-20-04 |
| Engineered Structures, Inc. | $769,000 | 1) $65,727 2) $65,678 3) $ 5,571 4) $ 8,222 5) $71,560 |
|||
| Luekenga Construction, Inc. | $832,747 | 1) $75,805 2) $79,508 3) $ 7,186 4) $ 9,100 5) $82,553 |
|||
| Scott Hedrick Construction, Inc. | $749,900 | 1) $62,900 2) $62,800 3) $ 3,000 4) $ 5,000 5) $68,500 |
|||
| CSDI Construction, Inc. | $748,490 | 1) $62,500 2) $62,100 3) $ 3,500 4) $ 8,000 5) $67,000 |
|||
| 4-13-04 (ak) | 04110 Column Replacement, Old Admin. Bldg., IDBS, Gooding, Idaho | Hayes Construction Co. | $46,470 | 1. $55,187 | |
| Bideganeta Construction | $69,500 | 1. $59,500 | |||
| Hamilton Builders, Inc. | $47,434 | 1. $36,525 | 4-26-04 | ||
| 04-7-04 (ak) | 04112 Carpet Replacement, Residential Cottages, ISDB, Gooding, Idaho | Pioneer Floor Carpet 1, | $48,214 | 1. $12,123 2. $12,123 |
|
| Bideganeta Construction, Inc., | $43,250 | 1. $10,800 2. $10,800 |
4-26-04 | ||
| 3-23-04 (ak) | 04531 Security Fence, Dept. of Juvenile Corrections, Nampa, Idaho | Custom Fence Co. | $374,216 | Unit Cost: $500 X 20 Cubic Yards |
|
| Ronald W. Van Aucker, Inc. | $226,780 | Unit Cost: $575 X 20 Cubic Yards |
|||
| American Fence Co. | $308,705 | Unit Cost: $50 X 20 Cubic Yards |
|||
| Brice Construction | $181,734 | Unit Cost: $180 X 20 Cubic Yards |
|||
| Kepha Construction | $182,450 | Unit Cost: $85.25 X 20 Cubic Yards |
3-29-04 | ||
| 3-18-04 (ak) | 01222 Multi-Use
Complex - Phase III, Idaho State University, Pocatello, Idaho Bid Package #8 |
Layton Construction | $1,260,000 | Unit 5 $39 / Cubic Yard | ALL BIDS REJECTED - TO BE RE-BID |
| Keller Construction | $892,500 | Unit 5 $39 / Cubic Yard | |||
| Sletten Construction | $1,200,000 | Unit 5 <$39 / Cubic Yard> deduct | |||
| Bid Package #9 | Keller Construction | $687,500 | |||
| Layton Construction | $810,000 | ||||
| Bid Package #10 | Sletten Construction | $5,625,000 | Unit 5 <$39 / Cubic Yard> deduct | ||
| Layton Construction | $6,100,000 | Unit 5 $39 / Cubic Yard | |||
| Bid Package #11 | JL England | $1,326,000 | |||
| Micklesen & Sons | $1,549,000 | ||||
| Sommer Builders | $1,497,000 | ||||
| Daniels Masonry | $2,728,100 | ||||
| Bid Package #12 | Steel West | $3,510,000 | 3. $6,760 | ||
| Western Steel | 3,760,000 | 3. $6,000 | |||
| Bid Package #13 | Moderne Cabinet | $395,750 | 2. $198,000 4. $ 1,200 5. $ 1,200 |
||
| Johnson Bros. | $386,268 | 2. $254,576 4. $ 1,252 5. $ 1,252 |
|||
| Bid package #14 | Modern Roofing | $923,463 | |||
| Thomas Robison Roofing | $742,000 | ||||
| Quality Tile Roofing | $984,973 | ||||
| Bid Package #15 | ASI | $160,300 | |||
| Bid Package #17 | Inland Auto Glass | $3,908,894 | |||
| Bid Package #18 | ABS | $773,500 | 1. No Bid | ||
| Beacon Metals | $658,573 | 1. $38,245 | |||
| Bid Package #19 | Crawford Doors | $52,750 | |||
| Bid Package #20 | Interior Systems | $5,567,400 | 4. $3,797 5. $4,120 |
||
| ASI | $3,622,000 | 4. $4,930 5. $5,420 |
|||
| Bid Package #22 | Wall 2 Wall | $669,020 | 4. $3,040 5. $2,840 |
||
| Bid Package #23 | Davis Tile | $137,400 | |||
| Bid Package #24 | Ed's Painting | $495,000 | 4. $370 5. $390 |
||
| National Coatings | $657,000 | 4. $356 5. $277 |
|||
| Bid Package #26 | ASI | $205,000 | 4. $1,000 5. $1,000 |
||
| Bid Package #27 | Spitz, Inc. | $157,447 | |||
| Astro-Tech Manufacturing | $148,500 | ||||
| Bid Package #28 | Partition Spec | $158,000 | |||
| Saxton-Bradley | $130,543 | ||||
| Intermountain Design | $118,025.12 | ||||
| Bid package #29 | Alders | $32,735 | |||
| Precision Glass | $35,800 | ||||
| Bid package #30 | Thyssen-Krupp | $258,510 | |||
| Schindler Elevator | $380,541 | ||||
| Bid Package #31 | Bergreen-Ellingson | $1,457,000 | 6. No Bid | ||
| Bartz | $1,354,834 | 6. $16,506 | |||
| US Food Service | $1,273,552.92 | 6. $32,876 | |||
| J & V Restaurant | $1,264,915 | 6. $19,120 | |||
| Bid Package #32 | 3-D Fire | $714,781 | 4. $450 5. $600 |
||
| Shilo Auto Sprinkler | $593,095 | 4. $640 5. $720 |
|||
| Bid Package #33 | DeBest Plumbing | $1,693,535 | |||
| Bid Package #34 | United Team Mech | $4,280,000 | 4. $1,480 5. $1,660 7 $150,076 |
||
| Lewis Corp | $3,880,000 | 4. $ 1,250 5. $ 1,250 7. $162,700 |
|||
| Hobson Fabricating | $3,946,528 | 4. $ 2,860 5. $ 2,875 7. $164,850 |
|||
| DeBest Plumbing | $4,131,495 | 4. $ 3,031 5. $ 3,048 7. $203,838 |
|||
| Bid Package #35 | Environmental Eng. | $76,790 | 4. $250 5. $275 |
||
| Bid Package #36 | Clima Tech | $480,350 | |||
| Johnson Controls | $417,417 | ||||
| Bid Package #37 | Anderson & Wood Construction | $4,879,000 | 4. $6,000 5. $6,000 6. $4,000 |
||
| Lea Electric | $4,871,591 | 4. $6,100 5. $6,100 6. $ 370 |
|||
| Arco Electric | $4,059,300 | 4. $ 8,358 5. $13,238 6. $ 3,306 |
|||
| Wheeler Electric | $4,898,600 | 4. $10,100 5. $10,100 6. $ 660 |
|||
| Warbonnet Electric | $3,550,000 | 4. $3,700 5. $3,700 6. $4,000 |
|||
| 3-11-04 | 00352 Activity Room Addition, Idaho State Veteran's Home, Pocatello, Idaho | Cannon Builders | $228,850 | 1. $ 5,500 2. $16,000 |
|
| Commercial General Construction | $284,924 | 1. $ 5,658 2. $20,285 |
|||
| DeWall Construction | $233,750 | 1. $ 1,393 2. $11,698 |
|||
| J & S Construction | $259,900 | 1. $ 4,200 2. $15,900 |
|||
| R.E. Beck Construction | $225,684 | 1. $ 3,300 2. $14,052 |
4-9-04 | ||
| Rivers West Construction | $262,367 | 1. $ 4,649 2. $13,850 |
|||
| 4-21-04 | 04091 Paint Booth Building, Maintenance Dept., CSI, Twin Falls, ID | Hayes Construction Co., Inc. | $174,301 | 1) $(1,662) 2) $16,410 |
|
| Smith Roofing | $227,944 | ||||
| 4-21-04 | 04091 Paint Booth Building, Maintenance Dept., CSI, Twin Falls, ID | Hayes Construction Co., Inc. | $174,301 | 1) $(1,662) 2) $16,410 |
|
| Don Anderson Construction, Inc. | $178,500 | 1) $(1,011) 2) $17,900 |
|||
| Stanley Associates, Inc. | $179,900 | 1) $ 6,200 2) $16,870 |
|||
| 4-13-04 | 03204 BSU-Science & Nursing 4th Floor Remodel, Boise, Idaho | Perkins Construction, Inc. | $745,400 | 1) $62,000 2) $61,800 3) $ 5,000 4) $ 5,400 5) $69,500 |
4-20-04 |
| Engineered Structures, Inc. | $769,000 | 1) $65,727 2) $65,678 3) $ 5,571 4) $ 8,222 5) $71,560 |
|||
| Luekenga Construction, Inc. | $832,747 | 1) $75,805 2) $79,508 3) $ 7,186 4) $ 9,100 5) $82,553 |
|||
| Scott Hedrick Construction, Inc. | $749,900 | 1) $62,900 2) $62,800 3) $ 3,000 4) $ 5,000 5) $68,500 |
|||
| CSDI Construction, Inc. | $748,490 | 1) $62,500 2) $62,100 3) $ 3,500 4) $ 8,000 5) $67,000 |
|||
| 4-13-04 (ak) | 04110 Column Replacement, Old Admin. Bldg., IDBS, Gooding, Idaho | Hayes Construction Co. | $46,470 | 1. $55,187 | |
| Bideganeta Construction | $69,500 | 1. $59,500 | |||
| Hamilton Builders, Inc. | $47,434 | 1. $36,525 | 4-26-04 | ||
| 04-7-04 (ak) | 04112 Carpet Replacement, Residential Cottages, ISDB, Gooding, Idaho | Pioneer Floor Carpet 1, | $48,214 | 1. $12,123 2. $12,123 |
|
| Bideganeta Construction, Inc., | $43,250 | 1. $10,800 2. $10,800 |
4-26-04 | ||
| 3-23-04 (ak) | 04531 Security Fence, Dept. of Juvenile Corrections, Nampa, Idaho | Custom Fence Co. | $374,216 | Unit Cost: $500 X 20 Cubic Yards |
|
| Ronald W. Van Aucker, Inc. | $226,780 | Unit Cost: $575 X 20 Cubic Yards |
|||
| American Fence Co. | $308,705 | Unit Cost: $50 X 20 Cubic Yards |
|||
| Brice Construction | $181,734 | Unit Cost: $180 X 20 Cubic Yards |
|||
| Kepha Construction | $182,450 | Unit Cost: $85.25 X 20 Cubic Yards |
3-29-04 | ||
| 3-18-04 (ak) | 01222 Multi-Use
Complex - Phase III, Idaho State University, Pocatello, Idaho Bid Package #8 |
Layton Construction | $1,260,000 | Unit 5 $39 / Cubic Yard | |
| Keller Construction | $892,500 | Unit 5 $39 / Cubic Yard | |||
| Sletten Construction | $1,200,000 | Unit 5 <$39 / Cubic Yard> deduct | |||
| Bid Package #9 | Keller Construction | $687,500 | |||
| Layton Construction | $810,000 | ||||
| Bid Package #10 | Sletten Construction | $5,625,000 | Unit 5 <$39 / Cubic Yard> deduct | ||
| Layton Construction | $6,100,000 | Unit 5 $39 / Cubic Yard | |||
| Bid Package #11 | JL England | $1,326,000 | |||
| Micklesen & Sons | $1,549,000 | ||||
| Sommer Builders | $1,497,000 | ||||
| Daniels Masonry | $2,728,100 | ||||
| Bid Package #12 | Steel West | $3,510,000 | 3. $6,760 | ||
| Western Steel | 3,760,000 | 3. $6,000 | |||
| Bid Package #13 | Moderne Cabinet | $395,750 | 2. $198,000 4. $ 1,200 5. $ 1,200 |
||
| Johnson Bros. | $386,268 | 2. $254,576 4. $ 1,252 5. $ 1,252 |
|||
| Bid package #14 | Modern Roofing | $923,463 | |||
| Thomas Robison Roofing | $742,000 | ||||
| Quality Tile Roofing | $984,973 | ||||
| Bid Package #15 | ASI | $160,300 | |||
| Bid Package #17 | Inland Auto Glass | $3,908,894 | |||
| Bid Package #18 | ABS | $773,500 | 1. No Bid | ||
| Beacon Metals | $658,573 | 1. $38,245 | |||
| Bid Package #19 | Crawford Doors | $52,750 | |||
| Bid Package #20 | Interior Systems | $5,567,400 | 4. $3,797 5. $4,120 |
||
| ASI | $3,622,000 | 4. $4,930 5. $5,420 |
|||
| Bid Package #22 | Wall 2 Wall | $669,020 | 4. $3,040 5. $2,840 |
||
| Bid Package #23 | Davis Tile | $137,400 | |||
| Bid Package #24 | Ed's Painting | $495,000 | 4. $370 5. $390 |
||
| National Coatings | $657,000 | 4. $356 5. $277 |
|||
| Bid Package #26 | ASI | $205,000 | 4. $1,000 5. $1,000 |
||
| Bid Package #27 | Spitz, Inc. | $157,447 | |||
| Astro-Tech Manufacturing | $148,500 | ||||
| Bid Package #28 | Partition Spec | $158,000 | |||
| Saxton-Bradley | $130,543 | ||||
| Intermountain Design | $118,025.12 | ||||
| Bid package #29 | Alders | $32,735 | |||
| Precision Glass | $35,800 | ||||
| Bid package #30 | Thyssen-Krupp | $258,510 | |||
| Schindler Elevator | $380,541 | ||||
| Bid Package #31 | Bergreen-Ellingson | $1,457,000 | 6. No Bid | ||
| Bartz | $1,354,834 | 6. $16,506 | |||
| US Food Service | $1,273,552.92 | 6. $32,876 | |||
| J & V Restaurant | $1,264,915 | 6. $19,120 | |||
| Bid Package #32 | 3-D Fire | $714,781 | 4. $450 5. $600 |
||
| Shilo Auto Sprinkler | $593,095 | 4. $640 5. $720 |
|||
| Bid Package #33 | DeBest Plumbing | $1,693,535 | |||
| Bid Package #34 | United Team Mech | $4,280,000 | 4. $1,480 5. $1,660 7 $150,076 |
||
| Lewis Corp | $3,880,000 | 4. $ 1,250 5. $ 1,250 7. $162,700 |
|||
| Hobson Fabricating | $3,946,528 | 4. $ 2,860 5. $ 2,875 7. $164,850 |
|||
| DeBest Plumbing | $4,131,495 | 4. $ 3,031 5. $ 3,048 7. $203,838 |
|||
| Bid Package #35 | Environmental Eng. | $76,790 | 4. $250 5. $275 |
||
| Bid Package #36 | Clima Tech | $480,350 | |||
| Johnson Controls | $417,417 | ||||
| Bid Package #37 | Anderson & Wood Construction | $4,879,000 | 4. $6,000 5. $6,000 6. $4,000 |
||
| Lea Electric | $4,871,591 | 4. $6,100 5. $6,100 6. $ 370 |
|||
| Arco Electric | $4,059,300 | 4. $ 8,358 5. $13,238 6. $ 3,306 |
|||
| Wheeler Electric | $4,898,600 | 4. $10,100 5. $10,100 6. $ 660 |
|||
| Warbonnet Electric | $3,550,000 | 4. $3,700 5. $3,700 6. $4,000 |
|||
| 3-11-04 | 00352 Activity Room Addition, Idaho State Veteran's Home, Pocatello, Idaho | Cannon Builders | $228,850 | 1. $ 5,500 2. $16,000 |
|
| Commercial General Construction | $284,924 | 1. $ 5,658 2. $20,285 |
|||
| DeWall Construction | $233,750 | 1. $ 1,393 2. $11,698 |
|||
| J & S Construction | $259,900 | 1. $ 4,200 2. $15,900 |
|||
| R.E. Beck Construction | $225,684 | 1. $ 3,300 2. $14,052 |
4-9-04 | ||
| Rivers West Construction | $262,367 | 1. $ 4,649 2. $13,850 |
|||
| Don Anderson Construction, Inc. | $178,500 | 1) $(1,011) 2) $17,900 |
|||
| Stanley Associates, Inc. | $179,900 | 1) $ 6,200 2) $16,870 |
|||
| 4-13-04 | 03204 BSU-Science & Nursing 4th Floor Remodel, Boise, Idaho | Perkins Construction, Inc. | $745,400 | 1) $62,000 2) $61,800 3) $ 5,000 4) $ 5,400 5) $69,500 |
4-20-04 |
| Engineered Structures, Inc. | $769,000 | 1) $65,727 2) $65,678 3) $ 5,571 4) $ 8,222 5) $71,560 |
|||
| Luekenga Construction, Inc. | $832,747 | 1) $75,805 2) $79,508 3) $ 7,186 4) $ 9,100 5) $82,553 |
|||
| Scott Hedrick Construction, Inc. | $749,900 | 1) $62,900 2) $62,800 3) $ 3,000 4) $ 5,000 5) $68,500 |
|||
| CSDI Construction, Inc. | $748,490 | 1) $62,500 2) $62,100 3) $ 3,500 4) $ 8,000 5) $67,000 |
|||
| 4-13-04 (ak) | 04110 Column Replacement, Old Admin. Bldg., IDBS, Gooding, Idaho | Hayes Construction Co. | $46,470 | 1. $55,187 | |
| Bideganeta Construction | $69,500 | 1. $59,500 | |||
| Hamilton Builders, Inc. | $47,434 | 1. $36,525 | 4-26-04 | ||
| 04-7-04 (ak) | 04112 Carpet Replacement, Residential Cottages, ISDB, Gooding, Idaho | Pioneer Floor Carpet 1, | $48,214 | 1. $12,123 2. $12,123 |
|
| Bideganeta Construction, Inc., | $43,250 | 1. $10,800 2. $10,800 |
4-26-04 | ||
| 3-23-04 (ak) | 04531 Security Fence, Dept. of Juvenile Corrections, Nampa, Idaho | Custom Fence Co. | $374,216 | Unit Cost: $500 X 20 Cubic Yards |
|
| Ronald W. Van Aucker, Inc. | $226,780 | Unit Cost: $575 X 20 Cubic Yards |
|||
| American Fence Co. | $308,705 | Unit Cost: $50 X 20 Cubic Yards |
|||
| Brice Construction | $181,734 | Unit Cost: $180 X 20 Cubic Yards |
|||
| Kepha Construction | $182,450 | Unit Cost: $85.25 X 20 Cubic Yards |
3-29-04 | ||
| 3-18-04 (ak) | 01222 Multi-Use
Complex - Phase III, Idaho State University, Pocatello, Idaho Bid Package #8 |
Layton Construction | $1,260,000 | Unit 5 $39 / Cubic Yard | |
| Keller Construction | $892,500 | Unit 5 $39 / Cubic Yard | |||
| Sletten Construction | $1,200,000 | Unit 5 <$39 / Cubic Yard> deduct | |||
| Bid Package #9 | Keller Construction | $687,500 | |||
| Layton Construction | $810,000 | ||||
| Bid Package #10 | Sletten Construction | $5,625,000 | Unit 5 <$39 / Cubic Yard> deduct | ||
| Layton Construction | $6,100,000 | Unit 5 $39 / Cubic Yard | |||
| Bid Package #11 | JL England | $1,326,000 | |||
| Micklesen & Sons | $1,549,000 | ||||
| Sommer Builders | $1,497,000 | ||||
| Daniels Masonry | $2,728,100 | ||||
| Bid Package #12 | Steel West | $3,510,000 | 3. $6,760 | ||
| Western Steel | 3,760,000 | 3. $6,000 | |||
| Bid Package #13 | Moderne Cabinet | $395,750 | 2. $198,000 4. $ 1,200 5. $ 1,200 |
||
| Johnson Bros. | $386,268 | 2. $254,576 4. $ 1,252 5. $ 1,252 |
|||
| Bid package #14 | Modern Roofing | $923,463 | |||
| Thomas Robison Roofing | $742,000 | ||||
| Quality Tile Roofing | $984,973 | ||||
| Bid Package #15 | ASI | $160,300 | |||
| Bid Package #17 | Inland Auto Glass | $3,908,894 | |||
| Bid Package #18 | ABS | $773,500 | 1. No Bid | ||
| Beacon Metals | $658,573 | 1. $38,245 | |||
| Bid Package #19 | Crawford Doors | $52,750 | |||
| Bid Package #20 | Interior Systems | $5,567,400 | 4. $3,797 5. $4,120 |
||
| ASI | $3,622,000 | 4. $4,930 5. $5,420 |
|||
| Bid Package #22 | Wall 2 Wall | $669,020 | 4. $3,040 5. $2,840 |
||
| Bid Package #23 | Davis Tile | $137,400 | |||
| Bid Package #24 | Ed's Painting | $495,000 | 4. $370 5. $390 |
||
| National Coatings | $657,000 | 4. $356 5. $277 |
|||
| Bid Package #26 | ASI | $205,000 | 4. $1,000 5. $1,000 |
||
| Bid Package #27 | Spitz, Inc. | $157,447 | |||
| Astro-Tech Manufacturing | $148,500 | ||||
| Bid Package #28 | Partition Spec | $158,000 | |||
| Saxton-Bradley | $130,543 | ||||
| Intermountain Design | $118,025.12 | ||||
| Bid package #29 | Alders | $32,735 | |||
| Precision Glass | $35,800 | ||||
| Bid package #30 | Thyssen-Krupp | $258,510 | |||
| Schindler Elevator | $380,541 | ||||
| Bid Package #31 | Bergreen-Ellingson | $1,457,000 | 6. No Bid | ||
| Bartz | $1,354,834 | 6. $16,506 | |||
| US Food Service | $1,273,552.92 | 6. $32,876 | |||
| J & V Restaurant | $1,264,915 | 6. $19,120 | |||
| Bid Package #32 | 3-D Fire | $714,781 | 4. $450 5. $600 |
||
| Shilo Auto Sprinkler | $593,095 | 4. $640 5. $720 |
|||
| Bid Package #33 | DeBest Plumbing | $1,693,535 | |||
| Bid Package #34 | United Team Mech | $4,280,000 | 4. $1,480 5. $1,660 7 $150,076 |
||
| Lewis Corp | $3,880,000 | 4. $ 1,250 5. $ 1,250 7. $162,700 |
|||
| Hobson Fabricating | $3,946,528 | 4. $ 2,860 5. $ 2,875 7. $164,850 |
|||
| DeBest Plumbing | $4,131,495 | 4. $ 3,031 5. $ 3,048 7. $203,838 |
|||
| Bid Package #35 | Environmental Eng. | $76,790 | 4. $250 5. $275 |
||
| Bid Package #36 | Clima Tech | $480,350 | |||
| Johnson Controls | $417,417 | ||||
| Bid Package #37 | Anderson & Wood Construction | $4,879,000 | 4. $6,000 5. $6,000 6. $4,000 |
||
| Lea Electric | $4,871,591 | 4. $6,100 5. $6,100 6. $ 370 |
|||
| Arco Electric | $4,059,300 | 4. $ 8,358 5. $13,238 6. $ 3,306 |
|||
| Wheeler Electric | $4,898,600 | 4. $10,100 5. $10,100 6. $ 660 |
|||
| Warbonnet Electric | $3,550,000 | 4. $3,700 5. $3,700 6. $4,000 |
|||
| 3-11-04 | 00352 Activity Room Addition, Idaho State Veteran's Home, Pocatello, Idaho | Cannon Builders | $228,850 | 1. $ 5,500 2. $16,000 |
|
| Commercial General Construction | $284,924 | 1. $ 5,658 2. $20,285 |
|||
| DeWall Construction | $233,750 | 1. $ 1,393 2. $11,698 |
|||
| J & S Construction | $259,900 | 1. $ 4,200 2. $15,900 |
|||
| R.E. Beck Construction | $225,684 | 1. $ 3,300 2. $14,052 |
4-9-04 | ||
| Rivers West Construction | $262,367 | 1. $ 4,649 2. $13,850 |
|||
| 3-18-04 | 04192 Re-Roof Morrison Center, Phase I, BSU, Boise, Idaho | Contract West Roofing, Inc. | $158,100.00 | 1. $40,300.00 2. $14,700.00 3. $16,200.00 4. $13,100.00 |
|
| Quality Tile Roofing, Inc. | $119,665.00 | 1. $36,338.00 2. $19,780.00 3. $19,994.00 4. $21,486.00 |
3-24-04 | ||
| Hobson Fabricating Corporation | $149,949.00 | 1. $50,690.00 2. $18,495.00 3. $20,550.00 4. $21,600.00 |
|||
| Roman Roofs, Inc. | $220,572.00 | 1. $37,513.00 2. $16,077.00 3. $13,980.00 4. $10,252.00 |
|||
| Pro-Tech Roofing, Inc. | $189,690.00 | 1. $35,212.00 2. $16,077.00 3. $15, 531.00 4. $21,220.00 |
|||
| Upson Company | $153,890.00 | 1. $29,110.00 2. $14,500.00 3. $13,455.00 4. $16,369.00 |
|||
| Mountain States Roofing, Inc. | $155,462.00 | 1. $32,551.00 2. $13,014.00 3. $13,210.00 4. $12,115.00 |
|||
| 3-18-04 | 04190 Re-Roof Math/Geoscience Bldg., BSU, Boise, Idaho | Contract West Roofing, Inc. | $71,200.00 | ||
| Hobson Fabricating Corporation | $58,975.00 | ||||
| Roman Roofs, Inc. | $67,665.00 | ||||
| Pro-Tech Roofing, Inc. | $52,545.00 | ||||
| Upson Company | $47,800.00 | 4-1-04 | |||
| Mountain States Roofing, Inc. | $56,900.00 | ||||
| Summit Associates | $64,200.00 | ||||
| 3-24-04 | 04198 Stadium Lighting Modifications, BSU, Boise, Idaho | Northwest Electrical Contractors, Inc. | $420,495.00 | 4-1-04 | |
| Power Plus, Inc. | $510,960.00 | ||||
| B & B Steel Erectors | $758,852.00 | ||||
| 2-10-04 (ak) | 02171 Classroom Fan Coil Replacement Hedlund Bldg., NIC, Coeur d'Alene, Idaho | Hobson Fabricating | $329,000 | ||
| SMK Construction | $294,000 | 2-23-04 | |||
| 2-9-04 (ak) | 02253 Mechanical System Upgrade, University Place, UOI/ISU, Idaho Falls, Idaho | Climatec | $48,709 | 1. $ 5,284 2. $14,490 |
|
| Yamas | $47,820 | 1. $ 1,980 2. $ 6,740 |
|||
| Siemens | $45,875 | 1. $ 3,606 2. $10,015 |
2-18-04 | ||
| Johnson | $53,649 | 1. $ 3,229 2. $ 9,237 |
|||
| 3-24-04 | 01171 Science/Nursing/Allied Health Building, NIC, Coeur d'Alene, Idaho | Leone & Keeble, Inc. | $10,100,000 | 1. $112,000 2. $ 17,800 3. $212,200 4. $ 11,700 5. $ 44,600 6. $ 7,100 7. $ 200 |
|
| Vandervert Construction, Inc. | $ 9,825,258 | 1. $ 87,068 2. $ 18,058 3. $215,177 4. $ 24,433 5. $ 38,071 6. $ 6,805 7. $ 204 |
|||
| Paras General Contractors, Inc. | $ 9,875,000 | 1. $ 87,000 2. $ 18,000 3. $214,750 4. $ 24,500 5. $ 43,300 6. $ 6,200 7. $ 200 |
|||
| Ormond Builders, Inc. | $ 9,976,387 | 1. $113,415 2. $ 18,019 3. $214,711 4. $ 26,076 5. $ 41,064 6. $ 6,805 7. $ 204 |
|||
| Bodell Construction Company | $10,155,000 | 1. $ 88,000 2. $ 15,000 3. $215,800 4. $ 25,000 5. $ 42,600 6. $ 6,800 7. $ 200 |
|||
| Panco Construction, Inc. | $ 9,800,000 | 1. $ 85,000 2. $ 16,000 3. $205,000 4. $ 12,000 5. $ 42,000 6. $ 6,000 7. $ 200 |
3-26-04 | ||
| Levernier Construction | $10,221,100 | 1. $ 85,700 2. $ 14,900 3. $211,700 4. $ 11,800 5. $ 42,800 6. $ 8,500 7. $ 11,500 |
|||
| Mooney & Pugh Contractors, Inc. | $10,060,000 | 1. $ 87,000 2. $ 18,000 3. $215,000 4. $ 12,000 5. $ 43,000 6. $ 7,000 7. $ 200 |
|||
| 2-26-04 (ak) | 99066 Fire Suppression, Unit 8, ISCI, Boise, Idaho | Guho Corp. | $174,800 | 1. $34,450 | 3-1-04 |
| 01-30-04 | 04250 Reroof Buchanan Engineering Lab-Rebid, U Of I, Moscow, Idaho | Missoula Sheet Metal | 1. $152,553 2. $235,662 |
||
| Pacific Tech Construction, Inc. | 1. $175,482 2. $247,000 |
||||
| Roman Roofs, Inc. | 1. $159,812 2. $197,315 |
2-26-04 | |||
| Cobra Roofing Services | 1. $145,789 2. $229,560 |
||||
| Contract West Roofing, Inc. | 1. $158,100 2. No Bid |
||||
| Icon Corp. | 1. $155,500 2. No Bid |
||||
| 2-26-04 (ak) | 99066 Fire Suppression, Unit 8, ISCI, Boise, Idaho | Guho Corp. | $174,800 | 1. $34,450 | 3-1-04 |
| 2-17-04 | 03067 Repair/Replace Sally Port Gates, IMSI, Boise, Idaho | Custom Fence | $235,940 | 1. $48,500 2. $125,350 |
|
| BMI Construction | $154,850 | 1. $19,970 2. $36,737 |
|||
| Guho Corp. | $152,909 | 1. $22,143 2. $15,290 |
|||
| Gafford Construction | $164,791 | 1. $25,060 2. $39,277 |
|||
| Kenaston Corporation | $194,786 | 1. $24,742 2. $64,252 |
|||
| K-J Corp., Inc. | $135,600 | 1. $19,839 2. $16,700 |
2-25-04 | ||
| 02-26-04 | 04092 Fire Alarm, Canyon Bldg, CSI, Twin Falls, Idaho | Wheeler Electric, Inc. | $64,800 | 3-1-04 | |
| Argus Electric | $89,305 | ||||
| Gietzen Electric | $75,884 | ||||
| 2-3-04 | 00330 Renovate Electrical, Bldg., 600, Military Division, Boise, Idaho | Doherty Electric | $58,000 | ||
| Benchmark Electric | $59,720 | ||||
| Anderson & Wood Construction Co. | $54,484 | ||||
| Tri State Electric | $68,550 | ||||
| Power Electric | $44,251 | ||||
| 1-30-04 | 03542 Repair 50 Meter Pool, Olympic Swimming Complex, Lava Hot Springs, Idaho | Rivers West Contruction, LLC | $14,320 | 2-4-04 |